Summary
Overview
Work history
Education
Skills
Certification
Shutdowns - API Inspector - Freelancer
Training
Languages
References
Timeline
Generic
Mohamed Abdel Raheem Abdel Kader

Mohamed Abdel Raheem Abdel Kader

Dammam,Saudi Arabia

Summary

Offering strong leadership and problem-solving skills with background in team management and project coordination. Knowledgeable about streamlining processes, improving operational efficiency, and fostering positive team environments. Ready to use and develop skills in strategic planning, communication, and resource management in inspection and QA/QC role.

Overview

15
15
years of professional experience
1
1
Certification

Work history

Aramco VID

Cutech Arabia LLC - National Pipe Company (NPC)
Dammam, Saudi Arabia
01.2025 - Current

Witness and hold the following activities in NPC Seam and Helical Pipes Production:

  • AUT, Digital X-Ray Machine Calibration and Demonstration.
  • UT Longitudinal and Shear wave devices calibration and demonstration.
  • Radiograph interpretation and evaluation for new and repaired welds.
  • Welded pipe repairing process.
  • Sampling of test rings from pipes for mechanical tests.
  • Mechanical tests for weld and pipe materials (Tensile, Bending, Charpy Impact, Drop Weight, hardness, HIC, and Chemical Tests).

Training Operation Manager

Cutech Arabia LLC
Dammam, Saudi Arabia
02.2023 - 12.2024
  • Coordinate the training process with our candidates in Aramco, SASREF, SABIC, SEC, and individuals.
  • Coordination between our candidates and AWS / TWI / API Agencies by collecting, reviewing, editing, and submitting their applications related to their initial exams or renewals.
  • Prepare training program materials and outlines.
  • Marketing process.
  • Provide training.

Senior Welding Engineer / Instructor

Cutech Arabia LLC
Dammam, Saudi Arabia
02.2020 - 01.2023
  • Providing many training programs related to the most popular certificates in the Oil and Gas fields:

- API (510, 570, 653, 571, 580, 936, 577, 574, 576, 578, 650, 572, 1104, and 5L)

- AWS (CWI, SCWI, CWEng, CWE, and CAWI).

- ASME (Sections II, V, VIII, IX), (B31.3, B16.5).

- ASNT NDT L I, II, III (Basic, MT, PT, RT, UT, VT).


  • Witness Procedure Qualification Records (PQR) and Welders' Qualification Tests (WQT) for different Aramco projects according to ASME IX, AWS D1.1, and API 1104.
  • Write and Issue PQRs, WPSs, and WPQs for Aramco Projects.
  • Review, edit, and approve PQRs, WPSs, and WPQs issued by other junior inspectors as SCWI.

Auditor / Instructor

Alkhorayef Industries Company
Riyadh, Saudi Arabia
01.2020 - 01.2020

Freelancer Job In ERW pipes production plant The main aim of this visit is to qualify plant according to Aramco and UL requirements. The program steps are:

  • Stage (1):
    1 - Visit all plant sections to review ERW pipes production sequence.
    2- Visit lab to review mechanical test machines, NDT equipments, painting thickness devices, and all of their documents.
    3- Reviewing production and QC procedures in OA/OC department.
    4- Auditing documents handling between plant, lab, and QA/OC department.
    5- Auditing material traceability from beginning of receiving coil (raw material) to storage of final ERW pipe products.
    6- Visiting storage areas for both coils (raw material) and pipes (final product) to check methods of handling, packing and storing of materials.
  • Stage (2):
    1- Merge between requirements of API 5L and extra restricted requirements of Aramco in one document.
    2- Arrange seminar to explain required physical changes shall be applied in plant to meet requirements of Aramco Specification no. 01 -SAMSS-333. Also explaining extra testing methods need to be added.
    3- Suggest machines which can fulfill new requirements of Aramco (Its functions and brand names).
  • Stage (3):
    1 - Arrange another seminar to explain requirements of both UL 852 and UL VIZY. Also explaining extra testing methods need to be implemented to have UL authorization.

QC Operations Head

ArcelorMittal Jubail Tubular products
Jubail, Saudi Arabia
08.2018 - 07.2019
  • Lead all QC activities in all plant sections (OCTG 1&2, PFL – NDT 1&2, QAL 1, Euro Technology and LPL) for all produced pipes according to AMJ procedures and planning plans.
  • Managing production procedures for automatic and semiautomatic UT, florescent MPI, VDI, bevel inspection and threading inspection for couplings, casing and tubing.
  • Leading Saudization project in company by interviewing Saudi graduates, choosing, training and classifying them according to their skills.
  • Contribution in preparing 2019 budget for QC department.
  • Contribution in modernization projects related by ET to lower cost.
  • Investigate root causes, find preventive and corrective actions for usual problems are found during work because of employees or operations.

Aramco PID Material Receiving & Welding Inspection

Intertek Arabia Ltd.
Jubail, Saudi Arabia
04.2017 - 07.2018
  • Inspection on all types and classifications of steels (C.S, S.S, S.S.S. D.X, S.D.X and L.T.C.S) plus Copper-Nickel alloys for all types of pipes, fittings, forgings, valves, gaskets, bolts and nuts.
  • Checking marking, color coding, handling and storage.
  • Random visual testing for all components.
  • Check material receiving documents like vendor approval, purchase order (P.O), release note (R.N), packing list (P.L), final inspection report (I.F), inspection release certificate (I.R.C) and material test certificates (M.T.C).
  • Check test reports related with M.T.C like hardness, product analysis, heat analysis, corrosion test, HIC, NDT, PMI, ferrite test,hydro-test, coating inspection, acid passivation, dimensional and visual test reports.
  • Consumable electrodes and rods receiving for S.S and C.S electrodes including storing conditions, certificates, lot no. and quantity.
  • All previous steps in site and office are done according to ASME II A, B, C and Aramco specifications.

Senior QA / QC Engineer – Static Equipment

PetroJet - Central Workshops, Kattameya
Cairo, Egypt
01.2016 - 03.2017

1- Review equipment drawings (General Arrangement, Material List and Attachments).

2- Review equipment ITP to identify hold points by ASME Inspector (AI) and Client, also to identify required inspection activities.

3- Review equipment WPSs, RT Maps, Welding Maps and Material Receiving reports.

4- Joins fit up and dimension check for shell courses, caps, skirt, nozzle openings marking, nozzles, internal & external attachments, name plate and name plate brackets.

5- Final visual for all welded joints.

6- Finishing all required reports (Material Summery, Dimension Check, NDT, Hardness, Release for Hydro-test, Heat Treatment, painting, Shipment and Heat Treatment Certificate).

7- Supervising stamping Name Plate with ASME Stamp “U” with (AI) and print a photographic copy of it.

8- Send all previous reports and documents to QA and Document Receiving Department.

Senior QA/QC Engineer – Piping

PetroJet - Qasr Gas Compression Project
Matruh, Egypt
05.2014 - 12.2015
  • Adjusting joints Fit-up and visual inspection for butt & fillet welds of Piping. Pipelines and Steel Structure. Also for internal and external attachments for Tanks.
  • Management of Duplex, Stainless steel, L.T.C.S and C.S workshops.
  • Apply all other required tests asked by Owner for weld metal, base metal & HAZ in planet (Ferrite Measurement, Hardness, Leak, Purging of Stainless& Duplex Steel & PMI Tests).
  • Supervising hydro and pneumatic tests for Piping.
  • Carried out all required tests for butt & fillet joints in planet (VT, PT, MT, UT& Leak Through Technique) for Castings and Welds.
  • Procedure Dye - Penetrate Tests and Interpretation of indications.
  • Preparing required documents (Mechanical Procedures, ITPs, Devices and machines Calibration Certificates, Heat Treatment, Welding Surveillance & NDT Reports).
  • Preparation of some Test Packs and control all Test Packs movement between different sections (QC of contractor and client, Hydro test, Reinstatement and Pre-commissioning Sections).
  • Bunching all required loops in Utility Area ( Just bunch A,B & C ).
  • Adjusting joints Fit-up and visual inspection for butt & fillet welds of Piping. Pipelines and Steel Structure. Also for internal and external attachments for Tanks. • Management of Duplex, Stainless steel, L.T.C.S and C.S workshops.
  • Apply all other required tests asked by Owner for weld metal, base metal & HAZ in planet (Ferrite Measurement, Hardness, Leak, Purging of Stainless& Duplex Steel & PMI Tests).
  • Supervising hydro and pneumatic tests for Piping.
  • Carried out all required tests for butt & fillet joints in planet (VT, PT, MT, UT& Leak Through Technique) for Castings and Welds.
  • Procedure Dye - Penetrate Tests and Interpretation of indications.
  • Preparing required documents (Mechanical Procedures, ITPs, Devices and machines Calibration Certificates, Heat Treatment, Welding Surveillance & NDT Reports).
  • Preparation of some Test Packs and control all Test Packs movement between different sections (QC of contractor and client, Hydro test, Reinstatement and Pre-commissioning Sections).
  • Bunching all required loops in Utility Area ( Just bunch A,B & C ).

Welding & QA/QC Engineer / Inspector

PetroJet - Assil & Karam Gas Development Project
Matruh, Egypt
07.2012 - 04.2014
  • Preparation of Inspection Test Plans and working procedures required for project and review required modifications by client.
  • Calibration for all testing devices (Clamp Ampere, Thermocouple, Purging, PMI, hardness& UT), welding machines and transformers and SMAW welding electrodes Packing & Holding Furnaces.
  • Preparing required documents (Mechanical Procedures, ITPs, Devices and machines Calibration Certificates, Heat Treatment, Welding Surveillance & NDT Reports).
  • Supervising of Welders Qualification Test (WQT). qualify and certify them according to ASME IX.
  • Supervising of PQR tests and qualify it according to ASME IX.
  • Preparation of PQRs and WPSs according to ASME IX.
  • Design welding maps for plant and pipe line.
  • Supervising of Micro and Macro Tests for WQTs according to owner specifications.
  • Apply all other required tests asked by Owner for weld metal, base metal & HAZ in planet (Ferrite Measurement, Hardness, Leak, Purging of Stainless^ Duplex Steel & PMI Tests).
  • Qualified from BAPETCO as Permit Holder and Coach Safety Trainer.
  • Certified from Enppi as Permit Applicant.

NDT Engineer

PetroJet - E -Styrenics Project
Alexanderia, Egypt
08.2010 - 06.2012
  • Carried out all required tests for butt & fillet joints in the planet (VT, PT, MT, UT& Leak Through Technique) for Castings and Welds.
  • Radiographs Interpretation.
  • Procedure Magnetic Particle Tests and Interpretation of indications.
  • Procedure Dye - Penetrate Tests and Interpretation of indications.
  • Procedure Ultra-sonic and U.T Thickness Measurement when it is required by owner.
  • Adjusting joints Fit-up and visual inspection for butt & fillet welds of the Piping.
  • Bunching all required loops in the Utility Area ( Just bunch A.B & C ).
  • Carried out all required tests for butt & fillet joints in the planet (VT, PT, MT, UT& Leak Through Technique) for Castings and Welds.
  • Radiographs Interpretation.
  • Procedure Magnetic Particle Tests and Interpretation of indications.
  • Procedure Dye - Penetrate Tests and Interpretation of indications.
  • Procedure Ultra-sonic and U.T Thickness Measurement when it is required by owner.
  • Adjusting joints Fit-up and visual inspection for butt & fillet welds of the Piping.
  • Bunching all required loops in the Utility Area ( Just bunch A.B & C ).

Metallurgical Engineer

Techno-Egypt
Cairo, Egypt
02.2010 - 07.2010
  • Supervising alloying, Melting and casting processes for Aluminum and copper alloys according to owner specifications.
  • Analyze chemical structure of samples from produced castings by using back - scattering machine.
  • Supervising preparation of 60 electrochemical cells for production pure copper plates (99.99999) which used as primary product for copper wire production companies.

Education

Master of Business Administration - Marketing and Leadership

International Business Academy (IBA London)
London, United Kingdom
04.2025 -

Bachelor of Engineering - Metallurgical and Material Engineering

Suez University
09.2004 - 05.2009

Skills

  • Relationship building
  • Solutions development
  • Cost reduction and containment
  • Process improvement strategies

Certification

Welding Inspection Certificates:

  • Senior Certified Welding Inspector (SCWI) from American Welding Society (AWS) Certification No. (21010168) - Valid till 01/01/2027.


IN-SERVICE Certificates:

  • Authorized Piping Inspector (API 570) from American Petroleum Institute (API) - Certification No. (66846) - Valid till 31/07/2028
  • Authorized Vessel Inspector (API 510) from American Petroleum Institute (API) - Certification No. (79282) - Valid till 31/01/2027
  • Authorized AST Inspector (API 653) from American Petroleum Institute (API) - Certification No. (103627) - Valid till 31/01/2028
  • Damage Mechanism (API 571) from American Petroleum Institute (API) - Certification No. (105268) Valid till 30/06/2028
  • Welding Inspection (API 577) from American Petroleum Institute (API) - Certification No. (107125) - Valid till 31/10/2028
  • Refractory (API 936) from American Petroleum Institute (API) - Certification No. (107124) Valid till 31/10/2028
  • Risk Based Inspection (API 580) from American Petroleum Institute (API) - Certification No. (109487) Valid till 31/01/2026


NDT Certificates:

  • Level III (Magnetic Particles Test – MT) - Certification No. (314455) - Valid till 10/2026
  • Level III (Radiographic Test – RT) Certification No. (314455) - Valid till 03/2027
  • Level III (Ultrasonic Test - UT) Certification No. (314455) - Valid till 11/2027
  • Level III (Dye Penetrate Test – PT) certificate No. (314455) - Valid till 03/2028
  • Level II (Visual Test – VT) Certificate - Valid till 30/10/2029


QA Certificates:

  • ISO 9001:2015 QMS Auditor/Lead Auditors - Certified by IRCA. Valid till 04/03/2027

Shutdowns - API Inspector - Freelancer

  • MIDTAP - June 2012 - 7 Days - Egypt.
  • BAPETCO / Shell - April 2014 - 10 Days - Egypt.
  • MIDOR - July 2015 - 26 Days - Egypt.
  • Amreia Refining Company (ARC) - April 2016 - 180 Days - Egypt.
  • PETROBEL / Enni - June 2017 - 14 Days - Egypt.
  • Khalda / Apache - January 2016 - 21 Days - Egypt.

Training

Three Times in Al-Ezz Flat Steel Company – Al-Sokhna – Suez:

  • From July 2nd to August 2nd, 2007.
  • From August 20th to August 30th, 2007.
  • From August 3rd to August 31st, 2008.

The training subjects was related with DRI Production, melting, alloying in ladle furnace, continuous casting and rolling.


Once at EgyptAlum Company – Naga-Hamadi – Qena – from July 19th to July 21st, 2008.

Languages

Arabic
Native
English
Fluent

References

References available upon request.

Timeline

Master of Business Administration - Marketing and Leadership

International Business Academy (IBA London)
04.2025 -

Aramco VID

Cutech Arabia LLC - National Pipe Company (NPC)
01.2025 - Current

Training Operation Manager

Cutech Arabia LLC
02.2023 - 12.2024

Senior Welding Engineer / Instructor

Cutech Arabia LLC
02.2020 - 01.2023

Auditor / Instructor

Alkhorayef Industries Company
01.2020 - 01.2020

QC Operations Head

ArcelorMittal Jubail Tubular products
08.2018 - 07.2019

Aramco PID Material Receiving & Welding Inspection

Intertek Arabia Ltd.
04.2017 - 07.2018

Senior QA / QC Engineer – Static Equipment

PetroJet - Central Workshops, Kattameya
01.2016 - 03.2017

Senior QA/QC Engineer – Piping

PetroJet - Qasr Gas Compression Project
05.2014 - 12.2015

Welding & QA/QC Engineer / Inspector

PetroJet - Assil & Karam Gas Development Project
07.2012 - 04.2014

NDT Engineer

PetroJet - E -Styrenics Project
08.2010 - 06.2012

Metallurgical Engineer

Techno-Egypt
02.2010 - 07.2010

Bachelor of Engineering - Metallurgical and Material Engineering

Suez University
09.2004 - 05.2009
Mohamed Abdel Raheem Abdel Kader