More than 10+ years of working Experience in QA/QC industrial inspection of products & services with several fields Well understand with interpretation of ISO, ASME, API, ASTM, BS, EN, SAMSS standards & sound knowledge of various engineering materials. Experience in preparation and implementation of the QA/QC documents as per ISO 9001/2015. Well develop skills in prioritizing organization; decision making, time management and verbal written communication skills
Overview
18
18
years of professional experience
1
1
Certification
Work History
Quality Control Team Leader, Coating Inspector
Saudi Arabian Amiantit Company
Dammam
05.2011 - 11.2024
Company Overview: Subplant 1- Saudi Arabian Ductile Iron Pipe, Valve & Fitting Co.Ltd
Perform inspection/monitor the disciplines of piping, valves, material, documentation, and coordination with other QC inspectors
Overall responsibilities, inspection of materials, construction of pipes as per perspective codes and preparation of Final Dossiers
Handling TPIA Inspections
Preparation of Test certificates & status reports
Incoming Material Inspection, Review of material test certificates
Prepare inspection test plans, testing procedures & getting approval from client
Evaluation & interpretation of test results to various standards
Responsible for all QA/QC inspection activities, Coordination with Clients, sub vendors & handling customer complaints
Monitor the compliance of Calibration frequency of IMTEs (Inspection Measuring & Test Equipment) and update calibration status regularly
Review & recheck all inspection & testing documentations such as reports, certificates, and calibrations
Update quality work instructions in order that production and quality control section meet the quality requirements of the products
Coordinate with production department with their daily activities to prevent hampering of production & Output in implementation of QA/QC procedures
Develop QC teams for the projects & deploy QC inspectors in accordance with the job requirements and continuously assessing performance of the staff
Coordinate for pressure tests in accordance with approved procedures and QC plans
Making necessary communication with the response managers in other department to overcome any Non-conformances related to quality
Monitor & follow up the timely close out of Non-Conformities, Corrective Action Requests (CAR), Preventive Action Requests (PAR)
Prepare, Plan and Conduct Internal audit, External audit and initiate Corrective Actions
Subplant 1- Saudi Arabian Ductile Iron Pipe, Valve & Fitting Co.Ltd
Establish of QMS-9001-2015 System inside the company
QMS Implementation: Applicable procedure implementation in-process and laboratory
Conduct internal audit as per the ISO 9001-2015
Performed audit activities with external auditor as per ISO 9001-2015 / ISO -2531 technical/SASO/FM
Identify the training requirements of QC inspectors as and when required
Maintains quality objectives coordinating with production procedures to maximize product reliability and minimize cost
Implements department quality objectives & updating every interval according to the QMS-9001-2015
Implements department risk and opportunities log with rating according to the QMS9001-2015
Updated internal and external communication log according to the QMS-9001-2015
Dealing with Clients for Resolving the customer issues by communicating and site visit
Final submission of VDDL (vender Drawing and data list)& Material Document Report & packing to the client
QA/QC Inspector
Larson & Toubro Ltd.
10.2006 - 03.2008
Stage wise Testing & Inspection
Random sampling of products as per relevant standards
Maintenance of Quality test records and document control
Material verification before casting and welding
Inspection for quality in welding and leak checking
Verifying all measuring instruments/ equipment for continued suitability for intended use, proper identification and maintenance and calibration status
Checking 100% Valve for Visual inspection as per MSS-SP-55- so that no injurious defects are observed on the casting
Dimensional Inspection was witnessed for the valve- found within acceptable limits
Performing Hydro testing for valve (hydro test body, seat, backseat & seat pneumatic test) & Functional test for the valves
Preparing and reviewing Original Raw material Test Certificate (MTCs) as per requirement of the Inspection
Education
Mechanical Engineering (Diploma) - undefined
AKP
India
Skills
Team management
Quality procedure
Report analysis
Operation system
Monitoring performance
Inspection & manufacturing
Quality auditing
ISO9001
Leadership
Control plan
PPAP
Statistical Process control
NDT
7QC tools
Certification
NDT Level II in Radiographic Film Interpretation, RISHAB NDT SERVICES, 12/05/2013, RTFI-01-2013, 29/04/2028
NDT Level II in Ultrasonic Testing, RISHAB NDT SERVICES, 22/04/2013, RNS/UT/01/2013, 29/04/2028
NDT Level II in Radiographic Testing, RISHAB NDT SERVICES, 02/05/2013, RT-01-2013, 29/04/2028
NDT Level II in Magnetic Particle Testing, RISHAB NDT SERVICES, 07/05/2013, MT-01-2013, 29/04/2028
Cswip level II, 387630
NDT Level II, RTFI-01-2013/RNS/UT/01/RT-01/MT-01
ISO 9001:2015 Awareness, NITT Co. Ltd FAHSS/TUV, QMS/AWA/I/1794/2018/18