Proficient Electrical Engineer with 15 years of experience driving over projects to completion. Skilled in overseeing technical staff ensuring that projects are completed on schedule, within budget and according to specifications.

Overview

2
2
Languages
2
2
Certifications
15
15
years of professional experience

Work History

Electrical Engineer

Al Hashemiah Contracting Co
Riyadh, Saudi Arabia
09.2014 - Current

At initiating of the project:

· Performed analysis to evaluate power needs for various systems for site Mobilization.

· Interacted with project leaders and stakeholders to define requirements and generate and maintain design development documents

· Read Contract, specification, BOQ and Tender Drawings to determine the scope and time for the project.

. Planning of the project

· Planned all project resources and budgets.

· Prepared budgets by estimating materials, labor and construction costs.

· Participate in preparing the time schedule for all electrical work in coordination with other related works.

· Determined most effective approaches to new projects by reading and analyzing drawings and sketches for the electrical scope.

At Executing of the project :

· Created electrical schematics using AutoCAD Electrical Toolset.

· Obtaining the approval from the consultant for the shop drawing, materials and suppliers.

· Implement all electrical systems (Medium Voltage, Low Voltage and Low current).

· Supervised construction and pre-commissioning of electrical rooms, substations, and service buildings for the project.

· Communicate with management and consultant for engagement.

· Applied appropriate engineering methods to all project discipline standards.

· Identified specific cables, connectors, fuses, circuit breakers and other electrical devices.

· Taking the approval from consultant for the inspected executed work.

· Read and interpreted Drawings, diagrams and schematics to correctly coordinate work.

· Reviewed specifications, drawings and project manuals.

· Leading the tendering and negotiation process for critical products and services to reduce costs and allow early contractor involvement.

· Oversaw teams of electrical contractors focused on installing Medium Voltage Kits for Package substations and Medium Voltage switch gears.

· Checked work quality and compliance with design specifications.

· Supervised construction and pre-commissioning of electrical rooms, substations, and service buildings for the project.

· Proposed electrical product and system modifications to improve quality and efficiency.

At the Monitor & Control of the project :

· Monitored The installation of electrical devices for compliance with safety protocols.

· Mentored junior engineers and new hires to better improve competency and efficiency of all staff.

· Evaluated installed electrical equipment and systems to isolate faults and implement corrective actions.

· Performed in-depth electrical acceptance testing of completed hardware, including continuity and high-potential isolation testing.

· Monitor any fault

· Perform in cooperative with supplier the operating and testing for all low current systems.

· obtaining the approval from the consultant for all electrical systems final testing and.

· Review the issue log and update if necessary and determine the corrective action by using the appropriate tools.

At Closing of the project :

· Obtaining the final acceptance of the project deliverable to confirm the project scope and deliverables were achieved.

· Prepared the As-Built drawings for all electrical systems.

· Prepared technical documentation for Installation, operation, troubleshooting and maintenance of Electrical systems.

· Prepared all testing inspection documentation

· Collect the lesson learned that were documented throughout the project for the potential use in future project.

Project Engineer

Systems Reliability Commerce and Contracting Company
Alkhobar, Saudi Arabia
12.2012 - 06.2014
  • 1-Faculty of preparatory year Student (B03) at king Faisal, Construction of building consists of three floors with total area 19,200 M2 (123) Million.
  • 2- SECO company standard contract project –Makkah ,KSA: Sub-Contractor for Saudi electricity company at Makkah for installation of Package and unit substations, installation of Citizens electrical meters , Air & Underground Distribution Network for Low & Medium Voltage, Performs complex engineering tasks and particularly important engineering work efficiently and accurately.
  • Extracts engineering information from CAD drawings.
  • Prepares engineering computations, material quantity takeoffs, estimates, surveys, and designs.
  • Completes a variety of assignments such as drawings, specifications, and other materials suitable for procurement and construction purposes.
  • Prepares detailed requisitions for equipment and materials.
  • Prepares and issues specifications, data sheets, and other construction documents.
  • Evaluate, organize, and prioritize workload within a schedule.
  • Provides technical guidance to CAD Designer/Drafters, Designers, and lower-level Engineers working on the same project.
  • Acting as project engineer, responsible in manage the technical team, supervise Saudi electricity company (SECO) installation work orders, maintenance work orders.
  • Supervise the technical installation of all sites works.
  • Follow up extraction excavation permits in traffic and municipalities.
  • Follow up the inspection for the work with SECO administrator.
  • Manage the required materials with supplier (Concrete and asphalt ,base course and bitumen..etc).
  • Organizes and manages machines and equipment’s (Excavator, Bobcat, JCB, Cable Roller, asphalt cutter and loaders’) used in execution the electrical works and Omar A.
  • Mohamed.
  • 966 549109725.
  • Elmongy.forcontrol@gmail.com Page 3 of 5 follow up the Periodic maintenance at Mechanics work shop.

Electrical Site Engineer

Khodari Sons Co
Khobar, Saudi Arabia, Saudi Arabia
12.2010 - 11.2012
  • Water treatment plant – Hafer Al Batin, KSA Project Description Operation and maintenance of Hafer Al Batin and Qaisoumah water treatment Plant with capacity 50,000 M3 /day, Electrical site engineer for Installation and maintenance of all infrastructure’s electrical works, generators, pump motors, sensors, power panels, control panels, medium, low voltage (lighting, power outlets) and low current works.
  • Troubleshot electrical equipment problems such as electro-valves and sensors.
  • Applied principles of electrical theory to advance and improve product development and efficiency.
  • Monitored the manufacture of electrical devices and operations to ensure compliance with safety Protocols.
  • Partnered successfully with Technical, procurement, Administration, human resource and Client (Ministry of Water & Electricity) to produce positive outcome.
  • Prepare the daily and protective maintenance schedules for all electrical equipment’s.

PLC Control Engineer

APEC Contracting Co
Giza, Egypt
02.2007 - 11.2010
  • Alayaat water treatment station (with Arab contracting company )-Giza , Egypt 2-Assuit water raw station( with Moukhtar Ibrahim for contracting)-Assuit, Egypt 3-Zhour Almarg waste wate station (with Moukhtar Ibrahim for contracting)-Cairo, Egypt 4-AlHussinia water station (with Arab Contracting Company)- AlSharqia-Egypt DUTIES AND RESPONSIBILITIES:.
  • Prepare technical drawings and control systems specifications that exceeded company standards.
  • Installation and termination of all low voltage panels.
  • Design all low voltage and control panels for water pump motors and valves.
  • Programming and calibration of instrumentation device such as flow meters, level meters, pressure Transmitter and indicators.
  • Programming control system using Allen Bradley PLC and SCADA System.
  • Searching for new control system tenders, preparing technical offers, service the client after selling, and development the work to achieve best progress.

Electrical Maintenance Engineer

Gulf Manufacturing Co
6th of October, Egypt
01.2006 - 01.2007

Project Description

Manufacturing of PVC, UPVC, PP-R Pipes and Fittings.

Responsibilities

· Maintenance of all plastic machines

· Proposing modifications and retesting products;

· Qualifying the final product or system;

· Servicing and maintaining equipment;

· Preparing product documentation, writing reports and giving presentations

Monitoring a product in use to improve on future design.

Education

Bachelor of Electrical Engineering -

Monufia University

Organizations and Memberships - undefined

College of Engineering, Management Institute

undefined

council

Skills

    AutoCAD knowledge

undefined

Certification

PMI- PMP

Timeline

PMI- RMP

02-2021

PMI- PMP

12-2020

Electrical Engineer

Al Hashemiah Contracting Co
09.2014 - Current

Project Engineer

Systems Reliability Commerce and Contracting Company
12.2012 - 06.2014

Electrical Site Engineer

Khodari Sons Co
12.2010 - 11.2012

PLC Control Engineer

APEC Contracting Co
02.2007 - 11.2010

Electrical Maintenance Engineer

Gulf Manufacturing Co
01.2006 - 01.2007

undefined

council

Organizations and Memberships - undefined

College of Engineering, Management Institute

Bachelor of Electrical Engineering -

Monufia University
Omar A. MohamedElectrical Engineer PMP - RMP Certified