Summary
Overview
Work history
Education
Skills
Languages
Timeline
Certification
Affiliations
Training
Courses
Researches
References
References
Activities And Conferences
Training
Courses
Researches
References
Training
Disclaimer
Professional Development
Languages
References
Omer Bader

Omer Bader

AL Jubail,KSA

Summary

Experienced professional skilled in AutoCAD MEP design, Revit architectural modelling, and MicroStation software use. Proficient in Navisworks coordination tools, Power BI analytics, and Microsoft Project planning. Adept at Primavera project tracking with a strong emphasis on collaborative teamwork, problem-solving, and communication skills. Demonstrates calm under pressure and excels in team building.

Energetic employee well-versed in strong communication and organisation skills. Seeks solutions to problems and applies extensive analytical knowledge to findings. Adept at multi-tasking, leading group discussions and managing projects.

Overview

14
14
years of professional experience
2013
2013
years of post-secondary education
1
1
Certificate

Work history

Senior HVAC and Building System Engineer

Snamprogetti Saudia Arabia - Saipem (Berri Project Abu Ali Island)
Jubail, Eastern Province
2022.01 - 2025.10
  • Led work pack projects with active monitoring and control activities, ensuring adherence to schedules and deliverables.
  • Prioritized and monitored engineering tasks and execution within functional areas, covering both engineering and support activities.
  • Facilitated discussions regarding scope of work and requirements between technical teams and clients.
  • Organizing and participating in client meetings to present design choices, project risks, and solutions during both FEED and project execution phases.
  • Conducted risk assessments and implemented mitigation strategies to minimize project delays or risks impacting project objectives.
  • Ensuring proper configuration and document management, including transmittal process, for accurate tracking and communication of project deliverables.
  • Guarantee that all technical project activities and deliverables complied with ASHRAE, SMACNA, NFPA, UMC, IPC, UPC, ASME, SAES, SAMSS, and NEC standards.
  • Designing and implementing control for HVAC systems, with interface system BLMS, DCS, fire alarms, PSA, and UPS systems.
  • Developed conceptual designs, cost estimates, and technical specifications during FEED phase for HVAC, firefighting, plumbing, and electrical and tie-in systems.
  • Led design and installation of HVAC, firefighting, and plumbing systems in compliance with SAES, SAMSS, NFPA, IPC, UPC, and ASME standards.
  • Conducting HVAC design load calculations to optimize energy efficiency and system performance, integrating findings into installation deliverables.
  • Collaborated with electrical, civil, and architectural teams to ensure coordination and eliminate system clashes for seamless operation.
  • Managing and reviewing material requisitions, technical bid evaluations, and vendor selections to ensure that components met project specifications and standards.
  • Ensuring all project document and deliverables, specification are endorse to subcontractor for no dispute or conflict in scope of work or battery limit
  • Coordinated with procurement teams to align material specifications and lead times with project timeline.
  • Reviewed and evaluated technical specifications and submittals, ensuring material approval in accordance with industry standards and timely delivery.
  • Prepared MTOs for HVAC and MEP systems, ensuring alignment with project requirements and manufacturing standards.
  • Applied and executed pre-commissioning and commissioning activities, including functional tests and troubleshooting during system startup.
  • Assisting in creating 3D models and simulations of HVAC and plumbing and related systems to analyze performance, and free clashes
  • Provided technical support to construction and site teams, ensuring proper implementation of systems during execution, startup, and commissioning phases.
  • Reviewed documents and test reports from vendors to verify material compliance before site dispatch, mitigating risks to project timeline.
  • Conducted feasibility studies to evaluate design approaches for HVAC, plumbing, firefighting, and electrical systems, ensuring cost-effectiveness and construction feasibility.
  • Identified key engineering challenges during design phase and recommended solutions to enhance project feasibility.
  • Participating in site walkthroughs with project management team stakeholder and client to review project requirement progress and quality to ensure alignment with project schedule
  • Participating in closure of punch items raise by stakeholder with project mechanical completion

Senior HVAC and Building System Engineer

Técnicas Reunidas Company TR - Harrad & hawiyah Gas plant
Al Hufuf, Eastern Province
2019.01 - 2022.05
  • Developed and implemented work breakdown structures (WBS), prioritizing, monitoring, and controlling critical path activities to meet project objectives and timelines.
  • Applied agile methodologies to ensure incremental progress, aligning with project goals, and delivering measurable business value throughout project lifecycle.
  • Managed project resources effectively, ensuring optimal allocation, leveling across tasks, and aligning with project timelines to prevent budget overruns and avoid schedule or scope creep.
  • Identified and mitigated risks through proactive planning, ensuring minimal impact on project scope, schedule, and cost.
  • Developed contingency plans to address unforeseen challenges.
  • Communicated regularly with stakeholders, providing progress updates, addressing project concerns, and ensuring alignment with project objectives and client expectations.
  • Led cross-functional teams, facilitating collaboration between engineering, procurement, and other disciplines to address constraints and ensure seamless execution of work packages.
  • Served as Project Engineer for electromechanical installation of HVAC, fire alarm systems, PAGA, and radio systems, executing E&I tasks such as cable tray and conduit installation, cable pulling, loop checking, and integration with control systems.
  • Calibrated systems based on project design parameters, achieving required superheat and sub-cooling points to maximize Coefficient of Performance (COP) and overall system efficiency.
  • Coordinating, and following up all related constrain with engineering, procurement, or other discipline effectively to ensure work and value progress continuity.
  • Conducted commissioning activities, functional tests, and troubleshooting for interface systems, including PSA, UPS, fire alarm, gas detection, and DCS, ensuring compliance with project, international and Aramco standards.
  • Prepared redline of changes and modification, ensuring full compliance with project specifications and facilitating smooth handover processes.
  • Prepared and gathered all necessary technical documentation for startup and handover, working closely with vendors and proponents for smooth functional.
  • Managed and closed all related punch items, ensuring timely mechanical completion of project.
  • Monitored project budgets, ensuring cost control and variance analysis to maintain financial targets and ensure adherence to baseline estimates.

Pre-commissioning and Commissioning Engineer

Hitachi company - Jazan Refinery and Utilities EPC 13
Jizan, Jazan Region
2016.01 - 2019.01
  • Planned and monitored work activities, ensuring alignment with project deadlines, work progress, resource allocation, and handover schedules.
  • Led installation of main HVAC equipment and related accessories, including AHUs, ACCUs, humidifiers, inertial filters, bleed fans, ventilation units, pressurization units, exhaust fans, ventilation fans, blast protection valves, air stack piping, and duct systems, along with control and electrical systems.
  • Reviewed all project deliverables and design documents to ensure proper coordination between multi-disciplinary teams, minimizing design clashes, reducing modifications, and optimizing timelines and costs.
  • Managed execution of all control work, including cable pulling, loop checking, terminations, instrument and device installation, and calibration.
  • Executed pre-commissioning and pre-startup activities for systems and equipment, including instrument adjustments, motor testing (vibration analysis, solo run, load test), torque testing, and IR Megger testing, ensuring compliance with Aramco Standards, ASHRAE, SMACNA, NEMA, NEC, and project specifications.
  • Conducted comprehensive system functional tests and DDCP testing, including interlocking with DCS (gas testing, UPS interfacing for battery charging modes), fire alarm system (FAS) testing, with site acceptance testing documentation.
  • Prepared and reviewed technical documents required for startup,and functional testing.
  • Performed testing, adjusting, and balancing (TAB) for HVAC systems to meet operational specifications.
  • Executed rectification work, maintenance, and troubleshooting to ensure smooth system operations and resolve any technical issues.
  • Monitored all PMCC and MCC activities, ensuring closure of all related items within project scope.
  • Work as issuer for all work activities, conducting joint site inspections with relevant parties to ensure work is performed with high safety and quality standards, preventing incidents from miscommunication or misunderstandings.
  • Certified by Saudi Aramco as work permit receiver, responsible for ensuring compliance with safety regulations on site.

Pre-Commissioning and Commissioning Enginer

SEPAM PM&C Jazan Refinery and Utilities
Jizan, Jazan Region
2015.01 - 2016.01
  • Created detailed mechanical estimation sheets to support project budgeting and planning, ensuring accurate cost forecasting for materials, labor, and equipment.
  • Conducted precise quantity take-offs for materials and labor, verifying estimated quantities against actual needs, ensuring project feasibility within approved budget and timeline.
  • Align contract scope by conducting required surveys and ensuring alignment between project requirements and contractual obligations, preventing scope deviations.
  • Generated technical submittals, shop drawings, and evaluated engineering proposals to ensure compliance with project specifications and standards.
  • Reviewed vendor material submittals to assess compliance with project and client specifications, ensuring all materials met contract requirements.
  • Coordinated with procurement and engineering teams to streamline technical submittal and approval process, minimizing delays in project execution.
  • Managed red-line drawing updates to reflect as-built conditions accurately, ensuring proper documentation for future reference and project handover.
  • Worked closely with project team to ensure proper documentation and notification of measurements, variations, and contractual matters, supporting project progress and risk mitigation.
  • Prepared comprehensive daily, weekly, and monthly reports to track project progress, resource allocation, and milestones, providing stakeholders with clear project status updates.

Systems Engineer

Sepal Investment Trading Co. Ltd
2013.01 - 2014.01
  • Work as project engineer with PMO to facilitate technical support for site team.
  • Preparing Load Calculation of HVAC SYSTEM.
  • Achievement of construction activity properly and by right way per standard and consults.
  • Monitoring all activates, task and test progressing according to project specs and standard.
  • Preparing Time Schedule for project activates to ensure that entire tasks and work will be done at planed time.
  • Implement all work of project task to ensure will complete on time with or prior project completion deadline.
  • Preparing material submittal to ensure that all material is meeting client requirement and specification and to close MRI and RFI smoothly.
  • Estimating, preparing and assigning tasks with fully utilizing all available resources such as manpower, material and equipment and to clear related constrain.
  • Pre-commissioning for HVAC System to ensure all systems are working properly.
  • Created detailed reports on system health status, enabling proactive interventions.

Liberty Steel Co. Ltd
2012.01 - 2013.01
  • Structure engineer for new line production.
  • Responsible for the maintenance production line and equipment’s
  • As maintenance engineer for CCM (continuous casting machine) and melting furnace steel.
  • Monitoring the production and detect defect and send result to laboratory.
  • Work with mangers to control the inventory with the time of maintenance.
  • Reviewing the worker performance and motivating them

Education

Bachelor of Engineering (Honours) – BEng (Hons) - Mechanical Engineering

Sudan University of Science and Technology (SUST), Khartoum, Sudan

Skills

  • AutoCAD MEP design
  • Revit architectural
  • MicroStation software use
  • Navisworks coordination tools
  • Power BI analytics
  • Microsoft Project planning
  • Primavera project tracking
  • Collaborative teamwork
  • Calm under pressure
  • Problem-solving
  • Communication skills
  • Team building

Languages

English

Timeline

Senior HVAC and Building System Engineer - Snamprogetti Saudia Arabia - Saipem (Berri Project Abu Ali Island)
2022.01 - 2025.10
Senior HVAC and Building System Engineer - Técnicas Reunidas Company TR - Harrad & hawiyah Gas plant
2019.01 - 2022.05
Pre-commissioning and Commissioning Engineer - Hitachi company - Jazan Refinery and Utilities EPC 13
2016.01 - 2019.01
Pre-Commissioning and Commissioning Enginer - SEPAM PM&C Jazan Refinery and Utilities
2015.01 - 2016.01
Systems Engineer - Sepal Investment Trading Co. Ltd
2013.01 - 2014.01
- Liberty Steel Co. Ltd
2012.01 - 2013.01
Sudan University of Science and Technology (SUST) - Bachelor of Engineering (Honours) – BEng (Hons), Mechanical Engineering

Certification

  • Registered PMP-PMI Project management insitute ID 7639422
  • Registered Mechnical Engineer Saudi Council of Engineers (Registration Number .296099) Dammam
  • Registered Mechnical Engineer Sudan Engineering Council, (Registration number. 38465), Khartoum, Sudan

Affiliations

  • Member of PMI 2022
  • Project Management institute
  • Member of ASHREA 2019
  • American Society of Mechanical Engineers (NECS)

Training

  • Fatima omer pharmacy (April2018-sep2018)
  • Yashfen pharmacy (oct2018-feb2019)
  • Ibrahim malik hospital (at drug information center) (April2019-June 2019)
  • AlAmal Hospital (impatient pharmacy)(march2020 – july 2020)

Courses

  • Pharmaceutical marketing (sep2018)(SKI training center)
  • Time management (sep2018)(SKI training center)
  • Presentation and public speaking(sep2018)(SKI training center)
  • Personal strategic planning Dec2014 (World center of voluntary training)

Researches

Pharmacology and non_pharmacology management of diabetes in pregnancy

References

References available upon request.

References

  • Mishal, Abdelrahman, Training manager, 0015976390, S.K.I Training and Development Center
  • Anas, Training employee, 0960824282
  • Ayman, Alsheikh, 091112890

Activities And Conferences

  • Participated in medical convoy to Dindir state - Gilla village March 2019
  • Sudanese pharmacy students’ conference in sudan 2014
  • Sudanese Orthopedic Surgeons Association 2020

Training

  • Fatima omer pharmacy (April2018-sep2018)
  • Yashfen pharmacy (oct2018-feb2019)
  • Ibrahim malik hospital (at drug information center) (April2019-June 2019)
  • AlAmal Hospital (impatient pharmacy)(march2020 – july 2020)

Courses

  • Pharmaceutical marketing (sep2018)(SKI training center)
  • Time management (sep2018)(SKI training center)
  • Presentation and public speaking(sep2018)(SKI training center)
  • Personal strategic planning Dec2014 (World center of voluntary training)

Researches

Pharmacology and non_pharmacology management of diabetes in pregnancy

References

References available upon request.

Training

  • Merowe Dam and Hydropower Plant:
  • Hydro Turbine (Francis, vertical “125w”).
  • HVAC (Heat Ventilation Air Conditioning).
  • Hydro Mechanical equipment (intake Gate, Low level sluice). Cooling System (pumps, heat exchanger, filter, cyclones).
  • Firefighting system.
  • Thermal Power Generating CO. Ltd
  • Gerri power station complex include Turbine &HP bypass system.
  • Condensate system.
  • HP heater drains & vents system.
  • LP heater drains & vents system.
  • Firefighting system& safety.
  • Kenana sugar company Limited includes:
  • The cane crop workshop.
  • The central maintenance workshops

Disclaimer

reference document upon request

Professional Development

  • Courses And Certificate:
  • Intensive courses in Auto CAD Design.
  • Intensive courses in Mechanical, Electrical and plumbing (MEB)
  • Intensive courses in firefighting System.
  • Intensive courses in HVAC System.

Languages

6

References

References available upon request.
Omer Bader