Summary
Overview
Work history
Education
Skills
Certification
Honors & awards
Career Conspectus
Timeline
Generic
PRASHANT KUMAR SINGH

PRASHANT KUMAR SINGH

Al Jubayl,Saudi Arabia

Summary

Experienced maintenance and project leader with 15 years in the industry, specializing in technical solutions for industrial projects. Proven ability to build rapport and inspire trust within teams, driving them to meet organizational objectives. Skilled in facilitation, training, and mentoring, fostering a collaborative work environment.

Overview

15
15
years of professional experience
6
6
years of post-secondary education
1
1
Certification

Work history

Team-Leader-Hot mill & cold line Maintenance (static & dynamic equipment)

Arcelor Mittal Group Saudi Arabia
Al Jubayl, Eastern Province
2015.01 - 2026.04
  • Execute maintenance activities for rotating & static equipment: Pumps, motors, gearboxes, compressors Hydraulic & pneumatic systems Piping systems, valves, structural equipment
  • Lead job execution in line with maintenance practices, including: Work permit (PTW) compliance Job safety analysis (JSA) LOTO procedures Toolbox talks before job execution
  • Plan and execute shutdown and turnaround jobs: Resource allocation (manpower, tools, spares) Job sequencing and scheduling Coordination with operations, safety & inspection teams
  • Perform on-site supervision of maintenance jobs ensuring: Quality of work as per standards Adherence to safety procedures Completion within planned time
  • Conduct equipment inspection and condition monitoring (basic) before job execution
  • Execute corrective maintenance and emergency breakdown jobs with minimum downtime
  • Prepare job reports, maintenance records, and feedback for improvement
  • Ensure compliance with HSE policies, risk assessment, and safety regulations
  • Manage: Preventive & predictive maintenance schedules Spare parts planning and PR/PO processes Maintenance cost control and optimization
  • Supervise and lead maintenance teams (50–70 manpower) during shutdowns and daily operations
  • Technical Expertise: Rotating Equipment Maintenance Static Equipment Maintenance Job Planning & Execution Shutdown / Turnaround Execution Hydraulics & Pneumatics Root Cause Analysis (RCA) Maintenance Planning & Scheduling Safety Systems (PTW, LOTO, JSA)
  • Encouraged open communication, fostering a positive work culture.
  • Provided comprehensive onboarding training to reduce learning curve for new hires.
  • Exposure to preventive breakdown and predictive Maintenance of Hot Rolling Mill (CTP/Piercer mill, PQF/Multi stand pipe mill, SZM/stretch reducing mill, cooling bed and Lininger saw, Straightener, NDT (Non-destructive test)

Engineer (Project & Maintenance)

Maharashtra Seamless Limited
2011.07 - 2014.12
  • 6” SEAMLESS PIPE PLANT AT MANGAON, RAIGAD MAHARASHTRA PIERCER ROLLING MILL, 480 AND 300 SRM (STRETCH REDUCING MILL), BATCH SAWMILL.
  • Responsible and total technical knowledge in pipe rolling engineering and mill maintenance with strong and Confident engineering skills.
  • Preparing project/modification documentation & implementation activity.
  • Assist in the development & implementation in procedures, PM’s and LOTO.
  • Successfully erected the 16 cassettes Gear Box with alignment, also successfully alignment done under 20 microns for 110 kw motors (15 nos) and 15 stands C- frame.
  • Fabrication and installation of SRM stand changing car mechanism done.
  • Gearbox, main motor erected with correct alignment within specified tolerances as per standards procedures.
  • Fabrication work is completed for the Piercer outlet Base Frame due to, Initial bed length 8mtrs for 6.8mtrs shell in length And now new bed [10.3mtrs] has been fabricated as per planned 9.5 meters in shell length.
  • Fabrication work is completed for inlet and outlet Skids, Dog Chain conveyor, Roll Conveyor, Billet Punching stand (for billet dia. 160 mm to 200 mm) and Cylinder table from Rotary Hearth Furnace Discharge to Piercer Inlet Table.
  • Erection activities like Positioning, Levelling, Alignment, Grouting and Pipeline completed.
  • As per project matrix plan every scheduled work with respect to time have been completed within range or before time.
  • Successfully erected and commissioned SRM (stretch reducing mill) 480 10 stand & 300 15 stands.
  • Planned, Erected and commissioned of billet cutting machine for 160 to 200 billet dia. Also, fabrication work of skid, kick out, conveyor and movable stopper completed for different size length cutting.
  • Also erected and commissioned of BATCH SAW inlet and outlet conveyor, skid, gauge stopper for different size length of pipe.
  • 14” SEAMLESS PIPE PLANT AT NAGOTHANE RAIGAD MAHARASHTRA EXPANDER MILL, VARNISH MILL, FACER MILL.
  • Designed the new expander mill for produce the 15’’ to 20’’ seamless pipe, also its fabrication work is completed and cylinder mounting, clamp work is in under process.
  • Designed the chain and chain sprocket of 300 mm pitch for varnish mill, its block fabrication work completed for fitment the sprocket.
  • Also, fabrication work of skid is completed, and inlet outlet chain conveyor work is in under processing
  • Successfully erected the new facer m/c 1 & 2 for 6.58’’ (in inches) to 20’’ (in inches) with alignment. Both m/c erected in same level and installed walking beam for transfer the pipe.
  • Successfully erected the gear box (1:23) and its operating motor of 55 kw with well alignment within 20 microns for operate the walking beam.
  • Graduate Engineering Trainee (GET) Jul 2011 - Dec 2011
  • 6 month Exposure in Mechanical Engineering & Project with an organization of high repute and targeting to move to the level of Industrial Project & Maintenance Technical Solution Architect. Joined there as a G.E.T and worked on a project.

Education

Bachelor of Technology - BTech - Mechanical Engineering

Uttar Pradesh Technical University
2007.01 - 2011.01

12th - Physics, chemistry, math

BIC Jaunpur
Uttar Pradesh
2005.01 - 2007.01

Skills

  • Maintenance Leadership & Team Management
  • Rotating Equipment (Pumps, Motors, Gearboxes, Blowers and fan, Agitator and stirrer, rotating Shaft, conveyor roller etc)
  • Static Equipment (Piping, Valves, Heat Exchangers, Structures, heavy machinery)
  • Preventive, Predictive & Breakdown Maintenance
  • Shutdown / Turnaround Execution
  • Job Planning & Execution as per the Preventive schedule and standard
  • Permit to Work (PTW), LOTO, HSE Compliance
  • Root Cause Analysis (RCA) & EFR
  • Maintenance Planning & Scheduling
  • Spare Parts & Inventory Management
  • Cost Control & Budgeting
  • Vendor & Contractor Coordination
  • Team Leadership (70 manpower)
  • Knowledge sharing
  • Risk assessment knowledge
  • Leadership proficiency
  • SAP performance data collection and execution
  • KPI Monitoring

Certification

  • Outstanding Performance ArcelorMittal Saudi Arabia Issued Jan 2021
  • No Expiration Date Credential ID 11057
  • Mechanical Engineer Saudi Council of Engineers Issued Sep 2017
  • No Expiration Date Credential ID 423588
  • Mechanical Engineer Uttar Pradesh Technical University Issued Jul 2011
  • No Expiration Date

Honors & awards

  • Outstanding Performance Issued by ArcelorMittal Tubular Product
  • Jan 2022 I awarded by an outstanding level of performance and one of the highest performing employees in ArcelorMittal Tubular product Jubail Saudi Arabia.

Career Conspectus

  • Mechanical Maintenance & Project Engineer with 15+ years of experience in Rotating & Static Equipment Maintenance, including pumps, motors, gearboxes and hydraulic & Pneumatic systems, shutdown/turnaround execution, and plant reliability.
  • Currently working as Team Leader – Maintenance at ArcelorMittal Tubular Products, Jubail. Strong expertise in job execution, maintenance planning, safety compliance, and equipment reliability improvement aligned with industry standards.
  • Confident to work on any kind of assignments in an organization, with the strong experience in detail Engineering and handling machineries of heavy mills. Static & Dynamic equipment
  • Worked on Project Proposals & various in Plant Maintenance Preparations Daily Preventive including monthly maintenance & annual maintenance Preparation, Effort Estimation & Cost Estimation of maintenance.
  • Performing an important role of Technical Team Leader for Hot & Cold line for static and dynamic equipment at Arcelor Mittal Group, also worked as a project/maintenance Engineer at Jindal Group, Maharashtra.
  • Experience in managing maintenance operations for reducing breakdown / downtime & enhancing operational effectiveness of equipment.

Timeline

Team-Leader-Hot mill & cold line Maintenance (static & dynamic equipment)

Arcelor Mittal Group Saudi Arabia
2015.01 - 2026.04

Engineer (Project & Maintenance)

Maharashtra Seamless Limited
2011.07 - 2014.12

Bachelor of Technology - BTech - Mechanical Engineering

Uttar Pradesh Technical University
2007.01 - 2011.01

12th - Physics, chemistry, math

BIC Jaunpur
2005.01 - 2007.01
PRASHANT KUMAR SINGH