Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic
Ram  PUJAN YADAV

Ram PUJAN YADAV

Jubail king Faisal Street,saudi

Summary

Accomplished Engineering Graduate (Electronics And Communication Engineering)

As I worked Site Engineer/Security System engineer with a good background Siemens Security System,Dormakaba Turnstile and Drop Gate,Nasatka Security Road Blocker,Nedap Door Controller (AP7803) and Door Interface (AP7003),

Security Camera Pleco,Axis,Siqura,Hikvision,Dahua.

SOUTHWest Microwave Intrusion Detection System.

I have an in-depth knowledge of the Samsung and NSN equipment both transmission and RF .

Having insightful experience of 10 years in Saudi Arabia And India. Qualified professional engineer specialising in Project management & Maintenance work. Background includes range of project types with different budgets and timelines. Adaptable to changing specifications and fully compliant with applicable codes.

Experienced Site Engineer able to manage multiple simultaneous responsibilities to keep Site running smoothly. Excellent planner and problem-solver versed in site preparation and day-to-day management. Loyal employee with solid understanding of training and mentoring employees. Dedicated team player, proactive and hands-on in task completion.

Overview

11
11
years of professional experience
4
4
years of post-secondary education
1
1
Certification

Work History

Site engineer

Technology Leaders(Client-Siemens/Saudi Aramco)
Jubail, Kingdom of Saudi Arabia
12.2022 - Current

SACS System- VASS System- SACS Rack- Fiber Optic Cable(FOC) System-

  • Planning ,Coordination, Implementation and execution of Installation, Commissioning & AT Plan of Siemens CCTV IP based Fixed Camera and PTZ Camera(SIQURA), CAT 6/6A cable(Systimax and CommScope),Turnstiles(DormaKaba), Drop Gates(DormaKaba).
  • Nedap Door Controller (AP7803) and Door Interface (AP7003) Installation and IP Assigned to the controller and testing with Devices.
  • Installation ,megger and continuity testing of 2 pair,4 pair and 8 control cables as per approved cable schedule.
  • Planning ,Coordination,Implementation and execution of Installation, Commissioning & AT Plan of Dell EMC Server, LAN Dongle, Juniper Switch, Network Video Recorder & RJ45 Patch Panel.
  • Internal Pre QC Plan and execution with QC Inspector.
  • QC plan and audit with Aramco PID,QC Inspector with subsequent RFI closure .
  • Red Line drawings as per physical installation and subsequent changes as "Red Line Drawings".
  • Assembly of Field Equipment Cabinet(FEC) for VASS System with MOXA Industrial Switch, MOXA Power Supply Unit,ADAM‑6066,MCB Breakers, P/W Outlet and Fiber Optic Enclosure.
  • Installation and Azimuth set of Fence Fixed cameras.
  • Commissioning & Orientation setting of all fence cameras.
  • Conducting Fluke Test of all UTP & subsequent report preparation and submission to QC/PID.
  • Redline Drawing Preparation in accordance with changes in IFC drawings.
  • Installation SACS Cabinet with 24 Port UTP Patch Panel, Fiber Optic Patch Panel, Controller(K32EX),Network Video Recorder(Dell EMC),KVM Switch(Dell),LED Console(Dell) and LAN Dongle.
  • Installation of Work station ,KVM extender and RS‑485 @ Gate House. Termination of Controllers at device and terminal blocks(TB).
  • Termination of all SACS camera with existing ARAMCO Switch.
  • Supervised site work to verify quality and safety standards ahead of sign off.
  • Project management, co‑ordination & supervision of project work for timely and quality execution.
  • Supervision of quality installation of 6/12 core fibre optic cable/enclosures as per cable layout schedule.
  • Supervision of splicing of foc ensuring losses@ respective enclosures/FEC cabinets.
  • HCIS Package Execution( RFI, QC & FAT & SAT)) Activities.
  • Execution of Stage 1,2,3 Approval with SEC Consultant.
  • Execution of Site Survey along with safety officer ensuring evaluation of facility classification with risk analysis, environmental conditions & adequate security measures as per HCIS Directive.
  • Supporting for preliminary & Detail design package preparation for HCIS submission.
  • Ensuring Installation with Optimal Performance validation fallowed by FAT, Pre‑SAT & SAT.
  • Preparation of Maintenance & Support Manuals.
  • Preparation of Compliance & Non‑Compliance report with justification & reason for HCIS review & approval.
  • Conducting Fluke Test of all UTP & subsequent report preparation and submission to QC consultant.
  • Study of Red Line drawings as per physical installation and subsequent changes as "Red Line Drawings.
  • Internal Pre QC Plan and execution with QC Inspector for WITNESS points in close coordination with Sub‑contractor.
  • Network Testing and test report preparation of CAT6 with Fluke DSX 5000 model.

Perimeter Intrusion Detection Alarm System(PIDAS)-

  • 📷 Supervision of Installation of Micro‑Point PoE 334and 390 System(Southwest Microwave) & Intrepid Micropoint II.

Engineer

AL Rajhi Telecom (Client—Tahakom (Tahakom Project -Riyadh, KSA)
Riyadh
12.2019 - 11.2022
  • Dahua (ITC952) Camera and IR (Infra-Red) Installation
  • Hikvision camera and IR installation and configuration
  • Coordinate With Customer and Complete the Task as given timeline Handover site as per customer Requirement
  • Installation of IP CCTVs Bullet Camera, Dome Camera & IR camera (Dahua, Hikvision)
  • Installation, Commissioning & Configuration of CCTV (Dahua, Hikvision) Installation, Commissioning & Configuration of NVR (Hikvision)
  • Configuration of Red Light & Fex Speed Radar with IR Camera
  • Acceptance Plan (AT) execution with customer representative as per requirement
  • Installation of UTP cable (CAT6/6A) (Commscope)
  • Fluke testing of all UTP Cables and report preparation
  • Inspection of Civil Work Hand Hole and main Base Foundation Trenching soilexcavation execute the site as per Design
  • Site Update on Eagte App System installation, Civil Implementation, system configuration QC Plan execution with customer engineer for all Devices
  • Troubleshooting of all types of cameras before Pre Acceptance Plan
  • Red Line Drawing Updating as per customer requirement
  • Preparation of daily report & weekly report to higher management.

Project Rollout Engineer

Samsung Network – India (Client –Reliance jio )
India
11.2015 - 11.2019
  • Samsung ENB maintenance, extension of bands 1800 & 850 in Existing E-Node B sites with solpar teams Observing alarms with NOC to maintain the grade of service and proper escalation to concern team for modification
  • Trouble shooting during Integration activity of NW( E-Node B, LSMR, MW & Cisco) Giving technical support to engineers for any problem related with network, especially for E-Node B, LSMR Issues
  • Preparation Operation Deputy Data for Grow, Commissioning, Integration of eNodeB
  • Grow & De-grow Samsung eNodeB in OSS
  • Upgrading the Samsung eNodeB Software & Firmware
  • RJIO IBS Site Installation & Integration.

BSS/O&M Engineer

Nokia Networks - INDIA
India
07.2015 - 11.2015
  • Monitoring & maintenance of BTS, WBTS, BSC & transmission Equipment
  • Knowledge of NSN 2G flexi, NSN multi radio BTS, Airscale BTS
  • Installation & commissioning of 2G Flexi & ultra BTS, NSN multi radio BTS, single ran BTS
  • Installation & commissioning of SDH microwave links (FIU, flexi hybrid,ceragon)
  • Carrying out Survey & Optimization activity with RF team to improve KPI
  • Knowledge of link budget preparations & network planning
  • Conducting AT with Project Personnel for Infra, IBS, BTS & MW
  • Provisioning of ET & E1 for new sites monthly rollout up to far end.

Project Engineer

Ceragon Network - INDIA
India
12.2014 - 07.2015
  • Installation, commissioning & configuration of Microwave Antenna with specified degree & polarizations
  • Quality testing and acceptance (AT) analysis of new sites and taking corrective actions through vendors
  • Putting license key and software up gradation in R2 IDUs
  • Involved in sites RF audits and antenna system audits
  • Responsible for Acceptance test of microwave links.

RF Engineer

Teleysia Network Pvt Ltd (Client Reliance jio - INDIA
India
05.2013 - 12.2014
  • Good working knowledge on RFE1 Site survey, installation, integration, commissioning (4G RJIL)
  • Good working knowledge of Samsung ENB equipment elements
  • Replacement of faulty modules of 4G Samsung equipment
  • Co-ordinate with LSMR team during 4G site integration
  • Monitored, configured & troubleshot Network elements of RJIL& Samsung.

Education

Engineer's degree - Electronics And Communication Engineering

Bhagwant Institute of Technology
04.2009 - 05.2013

Skills

  • IDAS System(SouthWest)
  • Industrial Moxa Switch
  • Dahua /Hikvision Camera ,NVR,Radar System , PTZ Camera,Dome Camera,Fixed Camera,EGCAM,BGCAM,FPCAM ,Pelco Camera
  • Communications cabling
  • Site surveys
  • Ceragon Transmission Equipment: IP 20C,IP20N,IP20C AirFiber
  • Nokia BTS : Ultra BTS, Flexi BTS,Ultra mini BTS,,NSN multi radio BTS,
  • Samsung BTS And Transmission Equipment:CDU (consist of Digital Unit), RDU,MAU(Massive Antenna Unit),RRU (Remote Radio Unit)
  • Health and Safety
  • Employee management
  • Project Management
  • High-value project management
  • Site layout expertise

Certification

  • Commscope WR9100-Introduction to Building Cabling Solutions.
  • Belden Diploma Copper Systems.
  • Belden Diploma Lighting Cable &Live Design.
  • Belden Diploma Direct Connect Testing Guidelines.
  • WPR (Contractors Work Permit Receiver Prerequisite).

Timeline

Site engineer

Technology Leaders(Client-Siemens/Saudi Aramco)
12.2022 - Current

Engineer

AL Rajhi Telecom (Client—Tahakom (Tahakom Project -Riyadh, KSA)
12.2019 - 11.2022

Project Rollout Engineer

Samsung Network – India (Client –Reliance jio )
11.2015 - 11.2019

BSS/O&M Engineer

Nokia Networks - INDIA
07.2015 - 11.2015

Project Engineer

Ceragon Network - INDIA
12.2014 - 07.2015

RF Engineer

Teleysia Network Pvt Ltd (Client Reliance jio - INDIA
05.2013 - 12.2014

Engineer's degree - Electronics And Communication Engineering

Bhagwant Institute of Technology
04.2009 - 05.2013
  • Commscope WR9100-Introduction to Building Cabling Solutions.
  • Belden Diploma Copper Systems.
  • Belden Diploma Lighting Cable &Live Design.
  • Belden Diploma Direct Connect Testing Guidelines.
  • WPR (Contractors Work Permit Receiver Prerequisite).
Ram PUJAN YADAV