Summary
Overview
Work History
Education
Skills
Iqama
Languages
Personal Information
Disclaimer
Timeline
Generic

RAMALINGAM SAMPATH

AI Khobar

Summary

Results-focused Manufacturing and Materials Coordinator with over 10 years of experience in electrical panel production, inventory management, and leading procurement initiatives for Class C materials. Adept at optimizing operational workflows, ensuring strict compliance with safety standards, and coordinating cross-functional teams to achieve organizational goals. Demonstrated success in managing complex material logistics, reducing lead times, and maintaining high-quality service levels that support production efficiency, and cost savings.

Overview

12
12
years of professional experience

Work History

Manufacturing & Material Coordinator

GE Vernova
Al Khobar
12.2022 - Current
  • Streamlining the production operations to ensure seamless workflows and timely project completions.
  • Planning and monitoring daily manufacturing department activities to enhance overall productivity.
  • Coordinating team schedules and managed workflow across multiple production lines to optimize efficiency.
  • Implementing efficient order fulfillment processes alongside optimized material distribution systems.
  • Managing inventory levels through regular stock audits and maintained accurate record-keeping.
  • Providing management with timely updates on inventory trends and stock levels for informed decision-making.
  • Collaborating closely with production teams to forecast material requirements specifically for DKMAC and Class C projects.
  • Establishing and applied lean inventory management techniques to minimize stock levels and reduce operational costs.
  • Conducting regular safety meetings to foster a strong culture of workplace safety and compliance.

Senior Electrical Technician

GE Vernova
Al Khobar
07.2018 - 11.2022
  • Supervised and trained electrical and mechanical technicians to boost productivity.
  • Allocated workload among wiremen and mechanical assemblers to optimize workflow.
  • Conducted weekly toolbox meetings while monitoring technician timesheets for efficiency.
  • Ensured material availability, addressed shortages, and updated daily production reports.
  • Collaborated with engineering team to resolve wiring and mechanical design issues, minimizing downtime.
  • Executed pre-wiring and wiring activities for 380/230/132kV protection and LCC panels.
  • Implemented labeling and terminal block arrangements while conducting continuity tests.
  • Addressed FAT comments and design issues, significantly reducing rework time.

Electrical Technician

GE Vernova
Al Khobar
07.2017 - 06.2018
  • Handled dimensioning, layout, and mounting of components for back panels and enclosures.
  • Ensured neat wiring, routing, and compliance with industry standards.

Production Associate

Ford Motor Company
Tamil Nadu
06.2013 - 12.2015
  • Increased production efficiency by 10% through application of Kaizen and Poka-Yoke techniques.
  • Managed workflow to consistently meet production targets and maintain quality standards.
  • Conducted thorough quality inspections to uphold product integrity.
  • Assisted with material transfers, optimizing resource availability during peak demand.
  • Worked additional shifts during high-demand periods to support team efforts.
  • Collaborated with team members to enhance productivity on production lines.
  • Ensured strict adherence to safety protocols throughout production processes.

Education

Diploma - Electrical, Electronics, and Communications Engineering

Krishnaswamy College of Engineering
Tamilnadu ,India
05.2013

Skills

  • Production planning and coordination
  • Substation control and relay panel building
  • Material planning
  • Inventory management
  • Warehouse operations
  • Lean and Kaizen methodologies

Iqama

2438526150 (transferable)

Languages

  • English
  • Tamil
  • Hindi

Personal Information

  • Passport Number: C8695804
  • Nationality: Indian

Disclaimer

  • I hereby declare that the information furnished is true to the best of my knowledge, AI Khobar, KSA

Timeline

Manufacturing & Material Coordinator

GE Vernova
12.2022 - Current

Senior Electrical Technician

GE Vernova
07.2018 - 11.2022

Electrical Technician

GE Vernova
07.2017 - 06.2018

Production Associate

Ford Motor Company
06.2013 - 12.2015

Diploma - Electrical, Electronics, and Communications Engineering

Krishnaswamy College of Engineering
RAMALINGAM SAMPATH