Mechanical Engineer with vast experience ininfrastructures, high-rise buildings, commercial and residential Buildings.
Experience in site supervision, construction works, andaccountancy.
good knowledge of engineering software.
Well familiar with SBC, Saudi Building Code, and American Codes.
MAIN ACTIVITIES AND RESPONSIBILITIES :
- MATERIALS AND SHOP DRAWING APPROVAL.
- PLUMBING, SANITARY AND FIREFIGHTING WORKS INSPECTION AND PRESSURE TEST .
- COMMISSIONING TESTS SECTORS:
• SANITARY AND PLUMBING WORKS
• FIRE FIGHTING SYSTEMS
• PUMPING STATIONS
• WATER TREATMENTS
• ELEVATORS
• LAUNDRY & KITCHEN
• AIR CONDITIONING & VENTILATION (FRESH & EXHAUST AIR)
• DIESEL OIL EMERGENCY ELECTRIC POWER GENERATOR
• MAIN ACTIVITIES AND RESPONSIBILITIES:
- MAKE MATERIAL INSPECTION REQUEST (MIR) FOR ALL MATERIALS USED
- MAKE REQUEST FOR INSPECTION (RFI) FOR EVERY SECTION DONE
- MAKE REQUEST FOR TEST (RFT) , PRESSURE TEST FOR PLUMBING AND SANITARY WORKS, COMMISSIONING TESTS SECTORS:
• SANITARY AND PLUMBING WORKS
• FIRE FIGHTING SYSTEM
• PUMPING STATION
• AIR CONDITIONING & VENTILATION (FRESH & EXHAUST AIR)
• POWER, LIGHTING AND LOW CURRENT WIRING
• ELECTRIC PANELS
• MAIN TRANSFORMER
• DIESEL OIL EMERGENCY ELECTRIC POWER GENERATOR
• MAIN ACTIVITIES AND RESPONSIBILITIES :
1- INSTALLING MANY OF WATER TREATMENT STATIONS FOR DIFFERENT INDUSTRIAL PLANTS:
TEXTILE , COTTON SEEDS OIL EXTRACTION
PLANTS, FOOD INDUSTRIES, PHARMACEUTICAL INDUSTRIES, 5 STARS HOTELS….ETC. INCLUDING:
• PUMPING STATION AND PRESSURE
CONTROL SYSTEMS
• CLARIFICATION
• CHEMICALS DOSING PUMPS
• DISINFECTION
• FILTRATION
• SOFTENING
• DEMINERALIZATION
• REVERSE OSMOSIS SYSTEMS
• STERILIZATION
2- EXECUTING MANY OF SWIMMING POOLS FILTRATION SYSTEMS FOR PUBLIC AND PRIVET USE.
• MAIN ACTIVITIES AND RESPONSIBILITIES :
• VFD PUMPING STATION
• CHEMICAL AND WATER TREATMENT
• HVAC
• KITCHEN APPLIANCES
• LAUNDRY
• FIRE FIGHTING SYSTEM
• MAIN ACTIVITIES AND RESPONSIBILITIES :
1-CRUDE PALM OIL (CPO) CHEMICAL REFINING:
INCLUDING:
• PUMPING STATION AND PRESSURE
CONTROL SYSTEMS
• CHEMICAL ADDITIVES
• ALKALI NEUTRALIZATION
• EARTH BLEACHING
• FILTRATION
• DEODORIZING
2- MARGARINE PRODUCTION .
• PUMPING STATION
• ADDITIVES
• HP PUMP
• CRYSTALLIZATION (GRESTENBERG &
AGGER PERFECTOR)
• AMMONIA COMPRESSOR
• CAN FILLING MACHINES
• MAIN ACTIVITIES AND RESPONSIBILITIES :
1- INSTALLING MANY OF WATER TREATMENT STATIONS FOR DIFFERENT INDUSTRIAL PLANTS:
TEXTILE , COTTON SEEDS OIL EXTRACTION
PLANTS, FOOD INDUSTRIES, PHARMACEUTICAL INDUSTRIES, 5 STARS HOTELS….ETC. INCLUDING:
• PUMPING STATION AND PRESSURE
CONTROL SYSTEMS
• CLARIFICATION
• CHEMICALS DOSING PUMPS
• DISINFECTION
• FILTRATION
• SOFTENING
• DEMINERALIZATION
• REVERSE OSMOSIS SYSTEMS
• STERILIZATION
2- EXECUTING MANY OF SWIMMING POOLS FILTRATION SYSTEMS FOR PUBLIC AND PRIVET USE.
• MAIN ACTIVITIES AND RESPONSIBILITIES :
1- INSTALLING:
• PICKLING BASIN
• ROLLING MACHINE
• CARBON STEEL ROLLER HEAT
TREATING
• STRIPING MACHINE
• PIPE FORMING MACHINE
• PROFILE FORMING MACHINE
• AUXILIARIES : ( WATER SOFTENING ,
BOILERS, AIR COMPRESSORS AND AIR
DRIERS ,HYDRAULIC AND
PNEUMATIC CONTROL SYSTEMS, HEAT
EXCHANGERS, WATER PUMPS AND ACID
PUMPS..ETC.)
2- EXECUTING ELECTRICAL WIRING (
POWER & CONTROL )FOR ALL MACHINES 3- EXECUTING HYDRAULIC CIRCUIT FOR
ALL HYDRAULIC CONTROLLED MACHINES
4- EXECUTING PNEUMATIC CIRCUIT FOR ALL HYDRAULIC CONTROLLED MACHINES
• MAIN ACTIVITIES AND RESPONSIBILITIES :
1- RESPONSIBLE FOR POWER
GENERATION OF FOUR
GROUPS:3*32MW+1*64MW
(START-UP ,MONITORING ,SHUT-DOWN OF
BOILER ,TURBINE AND THE AUXILIARIES)
2- FOLLOWING THE LOG SHEETS AND TAKE THE APPROPRIATE PROCEDURES TO CORRECT THE DEVIATIONS.
3- EXECUTE THE SCHEDULED AND ACCIDENTAL MAINTENANCE.
4- RECEIVE AND MAKE ACCEPT TO MAINTENANCE WORKS.
5- RESPONSIBLE FOR FOUR SHIFTS COVERING 24WORKING HR/DAY.
• MAIN ACTIVITIES AND RESPONSIBILITIES :
1- INSTALLING MANY OF WATER TREATMENT STATIONS FOR DIFFERENT INDUSTRIAL PLANTS:
TEXTILE , COTTON SEEDS OIL EXTRACTION
PLANTS, FOOD INDUSTRIES, PHARMACEUTICAL INDUSTRIES, 5 STARS HOTELS….ETC. INCLUDING:
• PUMPING STATION AND PRESSURE
CONTROL SYSTEMS
• CLARIFICATION
• CHEMICALS DOSING PUMPS
• DISINFECTION
• FILTRATION
• SOFTENING
• DEMINERALIZATION
• REVERSE OSMOSIS SYSTEMS
• STERILIZATION
2- EXECUTING MANY OF SWIMMING POOLS FILTRATION SYSTEMS FOR PUBLIC AND PRIVET USE.
• MAIN ACTIVITIES AND RESPONSIBILITIES :
1- MAKE TRAINING COURSE FOR ENGINEERS
AND TECHNICALS
START-UP ,MONITORING ,SHUT-DOWN OF
BOILER ,STEAM TURBINE AND THE
AUXILIARIES (HIGH PRESSURE WATER
PUMPS, FUEL PUMPS, AIR COMPRESSORS
AND DRYERS, HYDRAULIC AND PNEUMATIC
CONTROL ,PRESSURE AND TEMPERATURE SENSORS AND CONTROL SYSTEMS, MEASURING AND REGISTERING DEVICES).
2- MAKE INSTRUCTIONS BOOK FOR EXPLOITATION
MAIN ACTIVITIES AND RESPONSIBILITIES :
1- MAKE TRAINING COURSE FOR
ENGINEERS AND TECHNICALS
START-UP ,MONITORING ,SHUT-DOWN OF
BOILER ,STEAM TURBINE AND THE
AUXILIARIES (HIGH PRESSURE WATER
PUMPS, FUEL PUMPS, AIR COMPRESSORS
AND DRYERS, HYDRAULIC AND PNEUMATIC
CONTROL ,PRESSURE AND TEMPERATURE SENSORS AND CONTROL SYSTEMS, MEASURING AND REGISTERING DEVICES).
2- MAKE INSTRUCTIONS BOOK FOR
EXPLOITATION FOR THE NEW INSTALLED GROUP OF 64 MW
ERECTED BY SKODA EXPORT-Czechoslovakia.
1- GETTING AUTHORITY APPROVALS FOR CONSTRUCTION STAGE WORKS.
CONSTRUCTION WORKS. MATERIAL APPROVALS, WORK PROCEDURE APPROVAL, AUTHORITY COORDINATION, FINAL INSPECTIONS.
2- ARRANGING MEETINGS TO ENSURE THE CONFORMITY OF CONTRACTOR’S PLAN WITH THE PROGRESS OF WORKS.
3- FOLLOWING UP WORKS ON SITE TO ENSURE THE CONFORMITY WITH THE PROJECT AND AUTHORITY SPECS.
4- COMMISSIONING TESTS