Summary
Overview
Work History
Education
Skills
Additional Information
Timeline
Generic

ROHIT SINGH

TULSIPUR, VARANSI

Summary

Project Details – TATA STEEL KALINGANAGAR PROJECT, HOT STRIP MILL(HSM) 6MTPA Seeking a position to utilize my skills and abilities in the construction industry that offers me a professional growth while being resourceful, innovative and flexible.

Overview

8
8
years of professional experience

Work History

Asst Construction Manager

L&T CONSTRUCTION
07.2021 - Current
  • MANSOURAH MASSARAH GOLD PROJECT SAUDI ARABIA,
  • Responsibilities
  • Preparation of piping isometric drawing and BOM which was further reviewed and checked as per international code and standard
  • Preparing request for Quotations and evaluation of offers for piping material and preparing technical specifications for bid
  • Looking after activities including providing technical inputs for methodologies of installation and commissioning with site management activities and supervising a team of members for various types of jobs and resolving bottlenecks
  • Planning, supervision and monitoring the Erection, alignment and commissioning of all types of pipes which comes in SMS converter area
  • Preparation of piping isometric drawing, plot plan, P&ID, procurement of piping components and bills of materials, checking all the welding joints as per JIMS standard, making protocols of equipment as per customer specific documentation after erection and alignment
  • Flushing and pickling of hydraulic and lubrication pipe for attaining the required
  • NAS value
  • Commissioning and testing of pumps, pipeline and valve stand and Erection and alignment of Lance Cooling System, Hot Water System, Scrubber System
  • Assembly and Installation of motor and pump of Lance Cooling System
  • Pressure testing and Flushing of pipes Inside the Converter Area
  • Quality inspection of all type of welding like SMAW, GTAW, MIG
  • Make the work area safe and helped in achieving 4 Million Safe Man Hour to SMS
  • BOKARO Team
  • Responsibilities
  • Totally new experience of work in Saudi Arabia
  • Area of interest also changed from
  • Piping to HVAC & FDA
  • Looking after activities including providing technical inputs for methodologies of installation and commissioning with site management activities and supervising a team of members for various types of jobs and resolving bottlenecks
  • Planning, supervision and monitoring the Erection of HVAC Unit, Ducting and its related accessories
  • For FDA system conduiting, cabling related panel erection
  • After clearance from construction will go for Pre-Commissioning and charged the
  • HVAC system and check the healthiness of blower and Compressor
  • After Pre-
  • Commissioning, we will go for final Commissioning and check the simulation
  • To operate the system in automatic mode
  • Quality inspection of all the duct installation, its testing, Insulation, Clothing &
  • Cladding work
  • Make the work area safe and helped in achieving 15 Million Safe Man Hour to
  • MMGP Team Saudi Arabia.

Asst. Construction Manager

L&T CONSTRUCTION
08.2017 - 06.2021
  • Project Details – BOKARO STEEL PLANT(SAIL), STEEL MELTING SHOP-01(BOF),
  • CAPACITY- 130TONNES/HEAT
  • Responsibilities
  • PX-04 in RIL-J3 is the world Largent Paraxyelene unit
  • This is a petrochemical unit which includes 15lacs IM of all types of piping like ALLOY STEEL (P11,P22,P5),
  • CARBON STEEL, STAINLESS STEEL, LTCS etc
  • The total cost of this unit is 800 crores
  • Time duration to complete the project is 2 years
  • My area of scope in this unit is 3lacs IM which includes ERERECTION,
  • ALIGNMENT, MECHANICAL CLEARANCE, HYDROTEST and BOX-UP
  • Planning, supervision and monitoring the Erection, alignment and commissioning of
  • TA-UNIT(TRANSALKYLATION) piping
  • Preparation of piping isometric drawing, plot plan, P&ID, procurement of piping components and bills of materials, checking all the welding joints as per JIMS standard
  • Internal Cleaning of spools is 100% required to start the plan without any failure
  • Responsible for Contractor Management which are more than 10
  • Also Labor Management which are 400 in numbers
  • Safety, Quality and Productivity is the main focus area to complete the JOB
  • Mechanical Clearance of TEST PACKS which are 230 in numbers completed with supporting and with quality
  • ALLOY STEEL pipes which requires STRESS
  • RELIVING process(PREHEATING, POSTHEATING) also done with highest quality parameters
  • HYDROTESTING of all the TEST PACKS at the highest pressure 350 BAR
  • Quality inspection of all type of welding joint like V-GROOVE, J-GROOVE
  • Quality inspection of all type of welding like SMAW, GTAW, MIG
  • No LTI cases and ACHIEVED 27 MILLION SAFE MAN HOUR which is also a
  • WORLD RECORD

Senior Engineer

L&T HYDROCARBON ENGINEERING
05.2009 - 08.2018
  • Project Details- RELIANCE INDUSTRIES LIMITED J3-PROJECT, WORLD LARGEST
  • PARAXYELENE(PX-04) UNIT
  • Responsibilities
  • Preparation of piping isometric drawing and BOM which was further reviewed and checked as per international code and standard
  • Preparing request for Quotations and evaluation of offers for piping material and preparing technical specifications for bid
  • Looking after activities including providing technical inputs for methodologies of installation and commissioning with site management activities and supervising a team of members for various types of jobs and resolving bottlenecks
  • Planning, supervision and monitoring the Erection, alignment and commissioning of roughing mill and finishing mill equipment and piping
  • Preparation of piping isometric drawing, plot plan, P&ID, procurement of piping components and bills of materials, checking all the welding joints as per JIMS standard, making protocols of equipment as per customer specific documentation
  • After erection and alignment
  • Flushing and pickling of hydraulic and lubrication pipe for attaining the required
  • Nash value
  • Commissioning and testing of pumps, pipeline and valve stand and Erection and alignment of R.O.T table, Laminar Cooling Header and Cylinder
  • Commissioning and testing of the Equipment which includes pressure setting, speed setting and sensor fixing
  • Assembly and Installation of motor and sub sole plate, alignment of machine shaft an motor shaft centres, clearance between the machine and the motor and benchmarks
  • Commissioning of Celler Equipment (Media Equipment) of roughing mill
  • Quality inspection of all type of welding like SMAW, GTAW, MIG.

Senior Engineer

L&T CONSTRUCTION
01.2007 - 07.2013

Intern

Bharat Heavy Electricals Limited
Varanasi
07.2011 - 08.2011
  • Project – Working of CNC MACHINES and its programming
  • Responsibilities
  • Process to make BOWL MILL,
  • Programming of CNC MACHINES

Education

B. Tech - Mechanical

Pranveer Singh Institute Of Technology

Intermediate - undefined

U. P Board Nehru Balodyan Inter College

S.S.C - undefined

U.P Board Nehru Balodyan Inter College

Skills

Technical /undefined

Additional Information

  • Name :
  • (a) Achieved highest marks in High School and Intermediate (b) Received best academic award in third year of UPTU. EXTRA-CURRICULAR: (a) Won various Awards from Leo club and Lions Club Jaunpur (b) Won suspension Bridge Model Design at PSIT KANPUR (c) Organizing AUTOCADICTION in college technical fest. (c) Received Best Line Engineer Award by L&T CONSTRUCTION - KPO site.

Timeline

Asst Construction Manager

L&T CONSTRUCTION
07.2021 - Current

Asst. Construction Manager

L&T CONSTRUCTION
08.2017 - 06.2021

Intern

Bharat Heavy Electricals Limited
07.2011 - 08.2011

Senior Engineer

L&T HYDROCARBON ENGINEERING
05.2009 - 08.2018

Senior Engineer

L&T CONSTRUCTION
01.2007 - 07.2013

B. Tech - Mechanical

Pranveer Singh Institute Of Technology

Intermediate - undefined

U. P Board Nehru Balodyan Inter College

S.S.C - undefined

U.P Board Nehru Balodyan Inter College
ROHIT SINGH