CONSTRUCTION ENGINEER ( 2017 - 2021 )
- Delivered SABIC MEGA project readiness by coordinating construction and resolving technical interface problems.
Sustained project requirements through disciplined interface coordination and issue resolution.
Improved system readiness by leading quality and safety testing, start-up, and commissioning.
- Throughout my experience, I was assigned to a number of significant Mega projects that enhanced my technical and professional expertise, including:
Petrokemya Betadine DBN Project
United Ethylene Glycol 3 Project
SABIC Technology Center UPP Project.
PROJECT ENGINEER (2021 - Current )
- After gaining valuable and fruitful experience through these projects, I was given the opportunity to advance my career and was promoted to Project Engineer, allowing me to take on greater responsibilities and contribute at a higher level.
- Managed projects through the full project lifecycle, from concept development and feasibility studies through FEED, detailed engineering, procurement, construction, commissioning, start-up, and project close-out, ensuring compliance with approved scope, budget, schedule, quality, and HSE requirements.
- Led and coordinated multidisciplinary engineering activities involving process, mechanical, piping, electrical, instrumentation & control, civil/structural, and other engineering disciplines to ensure timely delivery of engineering deliverables.
- Participated in concept development and FEED studies, including scope definition, technical evaluations, engineering specifications, design reviews, equipment selection, constructability assessments, and development of project execution strategies.
- Reviewed and coordinated engineering deliverables, including design drawings, equipment datasheets, specifications, material requisitions, technical reports, calculations, and vendor documentation, ensuring compliance with project specifications, applicable codes, and client requirements.
- Developed and reviewed project cost estimates, budgets, schedules, and execution plans, covering engineering, procurement, construction, equipment, materials, manpower, subcontractors, commissioning, and other project costs.
- Monitored project cost and schedule performance, including commitments, actual expenditures, forecasts, progress measurement, variations, change orders, and potential cost/schedule impacts, implementing corrective actions where required.
- Coordinated procurement and vendor activities, including technical bid evaluations, vendor document reviews, material/equipment expediting, inspection coordination, and resolution of technical and commercial interfaces affecting project execution.
- Performed constructability and pre-construction reviews to identify design clashes, installation constraints, access limitations, material handling requirements, construction sequencing issues, and potential field risks before execution.
- Led coordination between engineering, procurement, construction, commissioning, operations, maintenance, vendors, and contractors, effectively managing technical interfaces and resolving project execution challenges.
- Developed and maintained structured project documentation and records management systems, ensuring traceability and control of contracts, engineering documents, correspondence, reports, inspection records, change orders, technical queries, and project close-out documentation.
- Led project execution activities during the Saudi Kayan Turnaround 2023, coordinating multidisciplinary teams, contractors, work fronts, permits, materials, equipment, and critical-path activities to maintain progress against the approved turnaround schedule.
- Implemented quality management and HSE requirements throughout project execution, including inspection and test coordination, method statement reviews, risk assessments, permit-to-work compliance, site inspections, and resolution of quality/HSE issues.
- Supported pre-commissioning, commissioning, and start-up activities, including system completion, punch-list clearance, testing, equipment readiness, turnover documentation, commissioning coordination, and handover to operations.
- Managed project close-out and handover activities, including final punch-list clearance, as-built documentation, test certificates, operation and maintenance records, lessons learned, and completion dossiers.
-Managed thermal cracking project phases 1 and 2 as focal point and pre-feed leader.
Developed and monitored more than 20 site projects worth over than 200 m SAR total.
-Installed new IBN Zahr waste heat boiler for site operations.
-Executed and closed out Saudi Kayan improvement project for power factor.
-Upgraded IBN Zahr boiler #01-02 control panels for better control.
-Installed additional PSV required for high load.
-Provided vent line and PG for CO cylinder installation.
-Replaced IBN Zahr 28-UPS-8-1 to restore service reliability.
-Delivered 200-H-01 radiant tube replacement project safely.
-Lowering Down Catalyst Injection for PP2 Reactor.
.