Summary
Overview
Work History
Education
Skills
Certification
Timeline
Languages
Accomplishments
Affiliations
Additional Information
Hi, I’m

Said Sabra

Riyadh,01
Said  Sabra

Summary

A dedicated and detail-oriented construction superintendent with 18+ years of experience in the construction & engineering industries. Proven record of overseeing, Piping, MEP, infrastructure, utilities, urban works, staff development & quality assurance for mega projects in Saudi Arabia, Qatar & UAE. Effective leader who performs well in a collaborative environment with clients, managers, and engineering staff. Adept at workload organization, diversity awareness, dispute resolution & communication skills achieving project success, high performance & profit maximizing. Seek to work in an environment conducive to intellectual, professional, and personal growth, where can contribute significantly to the growth of the team/organization with strong experience and expertise leading to success.

Overview

18
years of professional experience
1
Certificate
3
years of post-secondary education

Work History

WEBUILD S.P.A , Riyadh, Saudi Arabia

Construction Superintendent
2022.12 - Current (1 year & 9 months)

Job overview

  • Managed over 400 workers for landscaping and utility installation (storm drainage lines, irrigation)
  • Establish team charter including ground rules to manage site day to day-to-day performance through clear conflicts solving practices
  • Mentoring landscape and utility team and providing technical guidance to Ensure target achievement
  • Monitor equipment allocation following planned schedule
  • Ensure to follow resource management plan and coordinate with management for any change required
  • Monitor materials inventory and prepare all purchasing requests meeting site requirement and materials submittal conditions
  • Collaborate with key stakeholders for traffic management and logistic plan implementation and development

NESMA & PARTNERS CONTRACTING LTD , Riyadh, Saudi Arabia

MECHANICAL ACTING SUPERINTENDENT
2015.06 - 2022.12 (7 years & 6 months)

Job overview

  • Performing leading supervision team for all mechanical aspects such as wet utilities, sub-structure, and super-structure networks
  • Establish resources management plan in collaboration with construction manager and related key stakeholders
  • Mentoring more than 380 workers' allocation and daily task performance including their supervision members
  • Prepare all bills of quantity and material takeoff for permanent and temporary site mechanical networks.
  • Proceed with purchasing orders of temporary mechanical works along with consumable materials, equipment, and tools for whole mechanical team in project.
  • Execute mobilization works including welfare facilities, camp construction, mechanical workshops build, site logistic plan, and traffic management plan.
  • Support mechanical construction team with technical Mentoring, performance guiding, skills assessments, and training recommendation
  • Collaborate with project departments to achieve shared targets on time
  • Led equitable, compliant patient-centred pharmacy services.

CONSOLIDATED CONTRACTORS INT CO , Abu Dhabi , UAE

MECHANICAL SUPERVISOR
2012.08 - 2015.05 (2 years & 9 months)

Job overview

  • Oversaw mechanical progress for underground wet services, pipe racks, and building networks
  • Leading over 300 workers for pipe fabrication, hauling, stinging, and installation of pipeline and pipe racks
  • Study isometric drawings and shop drawing and compare them to site condition for any further modifications
  • Establish and manage piping workshop including estimation of materials, tools, and equipment needed
  • Perform materials inventory and collaborate with site management to provide necessary shortage
  • Facilitate welding processes, nondestructive examination, and recommended repairs
  • Perform hydrostatic tests, pipeline inspection gauge PIG, flushing, and test median disposals

AL NASR GENERAL CONTRACTING CO, Abu Dhabi , UAE

MECHANICAL SUPERVISOR
2011.03 - 2012.07 (1 year & 4 months)

Job overview

  • Performing fabrication and installation of all wet utilities services for liquified petroleum gas plant project
  • Execute all excavation aspects related to underground piping tasks, along with all related civil requirement
  • Oversaw over 250 workers' performance, skills improvement, and target achievement
  • Initiate materials inventory for all mechanical networks
  • Manage equipment allocation and maintenance monitoring schedules

GENERAL MECHANICAL SYSTEM CO, Beirut , Lebanon

MECHANICAL SUPERVISOR
2010.01 - 2011.02 (1 year & 1 month)

Job overview

  • Perform mechanical network execution for 2 high-rise towers including pump rooms, energy transfer stations, water and fuel storage tank rooms, and air handling unit rooms.
  • Oversaw site manpower allocation, performance, and target achievement
  • Establish mechanical workshops and manage fabricated spool distribution
  • Contribute to site handing over through specifications and inspection commitment with project consultant

CAT INTERNATIONAL QATAR , Doha , Qatar

PIPING FOREMAN
2008.09 - 2009.12 (1 year & 3 months)

Job overview

  • Performing chilled water mainline and ETS rooms network fabrication, installation, testing, coating, and chemical treatment
  • Manage piping fabrication shop along with material warehouse related to groups
  • Oversaw over 100 workers handling piping aspects as part of project team
  • Facilitate welding progress following project specifications and required codes
  • Coordinate with civil team to close requirements belonging to subject network

ATCO ELECTROMECHANICAL CO, Beirut , Lebanon

PIPE FABRICATOR
2006.05 - 2009.08 (3 years & 3 months)

Job overview

  • Read and fabricated CS/SS piping products from isometric engineering drawings, achieving accurate, timely results.
  • Utilized erection and welding to manufacture CS/SS spool products to detailed design specifications.
  • Maintained clean, tidy working area for optimized safety in line with welding and fabrication practices.
  • Demonstrated abilities in marking out, cutting, rolling, and folding carbon steel and stainless steel materials.
  • Troubleshot and maintained welding and fabrication equipment for optimal functioning.
  • Followed health and safety procedures in construction, using appropriate PPE to minimize risk of personal injury.
  • Applied spot welding techniques and arc welding techniques to execute designs to specification.

Education

HASSAN HAJJEH HIGH SCHOOL , Tripoli / Lebanon

High School Diploma from Social and Economics
2002.10 - 2005.07 (2 years & 9 months)

Skills

  • Construction management
  • Codes implementation
  • Subcontractor management
  • Labour resource allocation
  • Commercial Construction
  • Construction safety compliance
  • Project planning
  • Piping Codes
  • Time management
  • Team improvement
  • Quality assurance plan implementation
  • Problem-solving
  • Facility management
  • O&M
  • Pipeline right-of-way
  • AUTOCAD
  • REVIT entry level
  • Procurement schedule
  • Prioritization management
  • Urban works
  • Utilities
  • Welding

Certification

  • American Petroleum Institute: API570 Certified Piping Inspector
  • Project Management Institute: Project Management Essential Certified

Timeline

Construction Superintendent

WEBUILD S.P.A
2022.12 - Current (1 year & 9 months)

MECHANICAL ACTING SUPERINTENDENT

NESMA & PARTNERS CONTRACTING LTD
2015.06 - 2022.12 (7 years & 6 months)

MECHANICAL SUPERVISOR

CONSOLIDATED CONTRACTORS INT CO
2012.08 - 2015.05 (2 years & 9 months)

MECHANICAL SUPERVISOR

AL NASR GENERAL CONTRACTING CO
2011.03 - 2012.07 (1 year & 4 months)

MECHANICAL SUPERVISOR

GENERAL MECHANICAL SYSTEM CO
2010.01 - 2011.02 (1 year & 1 month)

PIPING FOREMAN

CAT INTERNATIONAL QATAR
2008.09 - 2009.12 (1 year & 3 months)

PIPE FABRICATOR

ATCO ELECTROMECHANICAL CO
2006.05 - 2009.08 (3 years & 3 months)

HASSAN HAJJEH HIGH SCHOOL

High School Diploma from Social and Economics
2002.10 - 2005.07 (2 years & 9 months)
  • American Petroleum Institute: API570 Certified Piping Inspector
  • Project Management Institute: Project Management Essential Certified

Languages

Arabic
Native
English
Upper intermediate
French
Elementary
Hindi
Beginner

Accomplishments

    Projects accomplishments:


  • The Avenues Mall project: finalize 40% of the embedded drainage network, 2 fire protection pump rooms for site safety purposes inspected by civil defense along with 18 fire hydrants
  • Al Khair camp project Riyadh: requests all the mechanical aspects materials and prepare the best practices for installation and operations, achieve 25 % of the execution
  • King Faisal Air Academy project: achieve the target of a 30 KM water transmission line (DI 24") within 90 working days of installation and testing excluding the valves chambers, and achieve the storm drainage, sewer, fire protection, potable water, and irrigation networks including manholes, chambers and pump rooms
  • King Abdullah Financial District Cluster J-2 Parcel 309: a high-rise tower of 31 floors, 4 basements, 2 energy transfer stations, 4 water storage tanks rooms, 2 water treatment stations, and 2 sub-soil dewatering sump pits. the scope was dilapidated and made safe including retesting for all mechanical networks, dewatering of flooded basement-4, and reoperation of the permanent dewatering system for sub-soil gravity water.
  • Riyadh metro project package 2 line 3: relocation of existing public utilities to clear the project right of way, execute the underground networks of the west depot, and finalize some civil and architectural additional tasks provided by the project manager as critical exercises
  • Abu Dhabi Airport Midfield terminal building MTB: execution of mobilization work for 14k manpower, finalizing 50% of the mechanical works for the central processor zone.
  • Hassyan 48" CS pipeline project: preparing the double jointing area for a pipeline of 48" DIA schedule 80, managing the hauling, stinging, welding coating, lowering, thrust boring, testing, and PIG for 20% of the whole project.
  • Habshan 5 process LPG plant: performing the underground services for the plant including fire protection, oil drainage, storm drainage, and water supply...….executing the pipe racks installation including vessels and related valves and accessories.
  • Integrated Districted Cooling Plant IDCP - The Pearl Island: executing the chilled water cooling tower piping, CHW mainline installation, testing, coating, chemical treatment, and handing over, execute 21 ETS including pumps, and heat exchangers, for the primary and secondary line within the ETS.

Affiliations

  • Project Management Institute
  • American Petroleum Institute
  • American Water Works Association

Additional Information

  • PMP 35 CPD training by pm-tricks institute
  • Rigger Level-1 from Bureau Veritas
  • Cooling System Technician Certificate
  • Licensed Confined Space Supervisor
  • First Aid CPR
  • OSHA 30 Hours Training Certificate
  • Excavation Methods Training Certificate
  • Lock Out Tag Out Training
  • Lifting & Rigging Supervisor Certificate
  • Permit Coordinator
  • API1169 new pipeline construction inspector training certificate including API1169, API1110, API Q1, ANSI Z49.1, API1104, ISO 9000, INGAA
  • API570 piping inspector training certificate including ASME BPVC section V, ASME BPVC Section IX, ASME B31.3, ASME 16.5, API570, API571, API576, API577, API578
Said Sabra