Summary
Overview
Work history
Education
Skills
Languages
Work availability
Timeline
Generic
SAIED SHABANA

SAIED SHABANA

Riyadh,Saudi Arabia

Summary

Objective:

To work in challenging environment and grow as a proficient innovative and committed Lead Production team work to contribute my professional skills as a team player to an esteemed organization with an ever learning and dynamic serving for self-actualization prestige. Experience:

Current and extended positions Production managers at Saudi ceramics - plastic plant , Saudi Stock Company, start from 19-3-2023 and present The strength of work performance lies in three axes

1- The first axis is a leader of the team work to achieve the following:

  • High – energy leader, motivator and team player who drives

demanding change agendas.

  • Organize, implement and maintain production process flow.
  • ensure that standard operating procedures are adhered to ensure implementation and adherence to health and safety procedures
  • monitor quality standards of products
  • monitor and review the performance of staff and organize necessary interventions for improvement
  • Ensure efficient collaboration and co-ordination between relevant departments including procurement.
  • Good control for discipline and organized the factory.

2- Second axis is planning achievement:

  • Responsibility on the production plan and forecast achieved.
  • Review and adjust the production plan schedule where needed if necessary urgent.
  • Analyze production waste section wise using (Pareto chart – fishbone analysis,… )
  • Measuring the overall equipment effectiveness - OEE.
  • determine the human resources required
  • Determine the raw material requirement, monthly forecast , annual forecast
  • manage human and material resources to meet production targets
  • Monthly / yearly reports of the performance of processes and equipment and makes recommendations for continuous improvement necessary to maximize process capability.

3- Third axis for the cost effected and cost cutting:

  • Challenge for improving the material recipe to reduce the product cost effect
  • Working for the improvement to reduce the manpower and costing by add the automation Process.
  • Working on tender analysis to meet with the sales / customer requirement.
  • Minimize the non-moving items with control the purchasing orders
  • Hardly work on wastage control
  • implement and enforce quality control and tracking programs to meet quality objectives
  • control the ERP for the i.e. BOM, WIP , Rout accurate work
  • More care during the monthly inventory (physically inventory).
  • For saving time and precision, Work with Procurement to facilitate solicitation and review of new ingredient samples.

Overview

26
26
years of professional experience
5
5
years of post-secondary education

Work history

Production manager

FIPCO
  • Responsibility on the production plan and forecast achieved
  • Review and adjust the production plan schedule where needed if necessary urgent
  • Analyze production waste section wise using (Pareto chart - fishbone analysis,… )
  • Measuring the overall equipment effectiveness - OEE
  • Determine the human resources required
  • Determine the raw material requirement, monthly forecast, annual forecast
  • Manage human and material resources to meet production targets
  • Monthly/yearly reports of the performance of processes and equipment and makes recommendations for continuous improvement necessary to maximize process capability.

QC Manger

FIPCO
  • Annual evaluation of the QC department staff
  • Prepare the annual training request for QC staff and sent to HR Dept
  • Supervising and evaluation of students from universities for training
  • To ensure that the quality manual and ISO (documents-work instruction-forms-records) under control
  • To ensure that the customers' requirements meet with the national and international standard
  • To ensure that the product meets with the customer request according to the sales order
  • To ensure that the import (raw materials - consuming materials) meet to the purchase order request and our standard
  • Perform all internal and external audits on behalf of the company's management
  • Responsibility about the management meeting review report
  • Monitoring for the corrective action due internal and external audits
  • Monitoring and following the PNCR (production non-confirm report)
  • Monitoring the NCR for the supplier due to reject material in case during the production process
  • Monitor the monthly reports and (quarter yearly) report
  • Analysis the customer complaints with the root cause and with the corrective action
  • Monitoring and following the corrective action process after decided
  • Issuing and monitoring the Quality objectives for every department
  • Monitoring and action for the devices and instrument calibration (external and internal calibration)
  • Communication with the outside third party (LABORDAYA) for the differ tests to get certificates
  • Communication with our certificated body (TUV-NORD) for the ISO certificates QMS-FMS.

Production manager

BOUDY for plastic industrial
HELWAN industrial city
01.2010

Production managers

Saudi ceramics - plastic plant
Riyadh, Saudi Arabia
03.2023 - Current
  • High-energy leader, motivator and team player who drives demanding change agendas
  • Organize, implement and maintain production process flow
  • Ensure that standard operating procedures are adhered to ensure implementation and adherence to health and safety procedures
  • Monitor quality standards of products
  • Monitor and review the performance of staff and organize necessary interventions for improvement
  • Ensure efficient collaboration and co-ordination between relevant departments including procurement
  • Good control for discipline and organized the factory.

Production manager

Al-TAWFIQ Co. For Plastic & Woven Sacks Industry
Cairo
01.2011 - 01.2014

Production engineer

AL GHADER packing sacks & threading factory
ELHASSA
01.2008 - 01.2009

Production engineer

LASHEEN for Plastics Industries
Heliopolis
01.1998 - 01.2007

Education

Bachelor of Engineering - mechanics

Helwan university faculty of Engineer
Cairo
10.1993 - 06.1998

Skills

  • Continuous improvement processes
  • Quality control standards
  • Inventory coordination
  • Process improvements
  • Lean manufacturing
  • Quality and risk assessment
  • Maintenance planning
  • ISO certified
  • Optimizing production output
  • Production scheduling
  • Safety management
  • Problem-solving
  • Leadership
  • Material handling expert

Languages

English
Advanced
Arabic
Proficient (C2)

Work availability

Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
morning
afternoon
evening
swipe to browse

Timeline

Production managers

Saudi ceramics - plastic plant
03.2023 - Current

Production manager

Al-TAWFIQ Co. For Plastic & Woven Sacks Industry
01.2011 - 01.2014

Production manager

BOUDY for plastic industrial
01.2010

Production engineer

AL GHADER packing sacks & threading factory
01.2008 - 01.2009

Production engineer

LASHEEN for Plastics Industries
01.1998 - 01.2007

Bachelor of Engineering - mechanics

Helwan university faculty of Engineer
10.1993 - 06.1998

Production manager

FIPCO

QC Manger

FIPCO
SAIED SHABANA