A results-driven Oil & Gas professional with over 9 years of extensive experience in piping systems, tank construction, and testing within major construction projects. Currently serving in the Aramco Project Inspection Department (PID) on the client side, ensuring strict compliance with international standards and project specifications. Demonstrates solid expertise in piping quality control, inspection procedures, and construction oversight, with a proven ability to identify issues early and implement effective, practical solutions. Known for maintaining high-quality standards while meeting project deadlines in demanding environments. Strong expertise in piping inspection, welding quality control, hydrotesting, and construction supervision. Proven ability to identify non-conformances, implement corrective actions, and ensure project quality targets are achieved. A proactive team player with leadership capability, strong communication skills, and a commitment to safety and excellence. A confident and proactive professional with strong interpersonal and team leadership skills. Experienced in coordinating with contractors, engineers, and stakeholders to achieve project objectives efficiently. Brings a disciplined, detail-oriented approach with a strong commitment to safety, quality, and continuous improvement. Fluent in English and Hindi, with a working knowledge of Arabic, enabling effective communication in multicultural project environments.

Overview

9
9
years of professional experience
1
1
Certification

Work history

STATIC TANK AND WELDING PIPING PID

DNV
JAFURAH
2024.09 - 2026.04
  • CLIENT: ARAMCO
  • Project: JFGP PKG-3 UTILITIES, SULFURE AND INTERCONNECTING SYSTEM

STATIC TANK PID

DNV
JUAYMAH
2023.08 - 2024.09
  • CLIENT: ARAMCO
  • Project: JUAYMAH TERMINAL EXPANSION PROJECT

WELDING INSPECTOR

WISON
JUBAIL
2023.01 - 2023.05
  • CLIENT: SABIC
  • Project: INSTALLATION OF TITANIUM CATALYST UNIT PROJECT

WELDING INSPECTOR

SULZER
Jubail
2022.06 - 2022.08
  • CLIENT: PETRO RABIGH
  • Project: petro rabigh (TURNAROUND)(XYLENE & RAFFINATE COLUMNS)

WELDING INSPECTOR

TASNEE
Jubail
2022.05 - 2022.06
  • CLIENT: TASNEE
  • Project: Tasnee (PDH) (SHUTDOWN)

WELDING INSPECTOR

Hadi Hamad Al Hamman Group
Dhahran Aramco
2021.03 - 2022.01
  • CLIENT: ARAMCO
  • Project: fire hydrant repl Dhahran Aramco

WELDING INSPECTOR

SINOPEC ENGINEERING GROUP
Jubail
2019.10 - 2021.02
  • CLIENT: SABIC
  • Project: GAS Phase 9 Project

WELDING INSPECTOR

REDA HAZARD CONTROL
Jubail
2016.12 - 2019.03
  • CLIENT: SABIC
  • Project: Petrokemya Butadiene DBN Project

WELDING INSPECTOR

SAUDI ELECTRICITY COMPANY
Turaif
2016.12 - 2019.03
  • Project: Waal Al Shamal ISCC Power Plant Project

Education

Bachelor of Engineering - Mechanical Engineering

JNT University
INDIA

Skills

  • Problem-solving
  • Communication skills
  • Public speaking
  • Team building
  • Leadership

Certification

  • Certified CSWIP 3.1 Welding Inspector, TWI Cambridge, U.K
  • Certification No.: 305210/2, Candidate no.:701620
  • SAP No: 80022225 welding & NDT inspector CBT PASS
  • SAP No: 80022225 Piping CBT PASS
  • ASNT NDT LEVEL-II:
  • Dye-Penetrate Testing
  • Magnetic Particle Testing
  • Radiographic Testing
  • Ultrasonic Testing
  • Visual Inspection

PERSONAL DETAILS.

English: Proficient (C2)
Hindi: Advanced
Arabic (Basic): Intermediate
Urdu: Upper intermediate

ENDORSEMENT:

I hereby declare that the above furnished information is true to the best of my knowledge. SAJID AHMED.

ROLES AND RESPONSIBILITIES:

  • WELDING PID OF API 650 TANKS
  • Compliance Oversight Ensuring adherence to the specific requirements and guidelines outlined in SAES-W-17 (Aramco Engineering Standard for aboveground storage tanks), API 650 (American Petroleum Institute standard for welded steel tanks), and SAEP-324 (Aramco Standard for Fabrication Inspection and Testing of Pressure Vessels).
  • Quality Control Inspections Conducting thorough inspections, audits, and reviews at various stages of tank and pressure vessel fabrication, installation, and testing to verify compliance with design specifications, quality standards, and regulatory requirements.
  • Documentation Management Maintaining accurate records and documentation of inspections, tests, certifications, and other relevant QA/QC activities related to SAES-W-17, API 650 tanks, and SAEP-324 pressure vessels.
  • Non-Conformance Management Identifying and addressing any deviations or non-conformances from the specified standards and requirements, and initiating appropriate corrective and preventive actions to rectify issues.
  • Contractor Oversight Monitoring the performance of contractors and subcontractors involved in the fabrication, installation, and testing of tanks and pressure vessels to ensure they meet Aramco's standards, contractual obligations, and regulatory requirements.
  • Safety and Environmental Compliance Ensuring that all activities related to tank and pressure vessel fabrication, installation, and testing comply with safety, environmental, and regulatory standards as stipulated in SAES-W-17, API 650, SAEP-324, and other applicable guidelines.
  • Continuous Improvement Implementing continuous improvement initiatives to enhance QA/QC processes, procedures, and standards related to SAES-W-17, API 650 tanks, and SAEP-324 pressure vessels, aiming to improve overall project quality, efficiency, and safety.
  • ARAMCO Projects – Saudi Arabia (Oil & Gas Construction)
  • Managed and controlled Piping & Welding PID activities from construction to commissioning.
  • Reviewed and closed P&IDs, Isometrics, Line Lists, and Test Packages.
  • Coordinated welding activities ensuring compliance with approved WPS, PQR, and WPQ.
  • Supervised piping fabrication, erection, alignment, and bolt tightening as per ARAMCO standards.
  • Conducted line check and walkdown prior to hydrotest and reinstatement.
  • Coordinated Hydrostatic & Pneumatic Pressure Tests, including test pack preparation and approval.
  • Ensured proper reinstatement of temporary spools, blinds, and valves after testing.
  • Verified materials, valves, fittings, and ensured compliance with MTCs and drawings.
  • Coordinated NDT activities (RT, UT, PT, MT) and ensured timely closure of reports.
  • Prepared and cleared A, B, and C punch lists.
  • Supported Mechanical Completion, Pre-Commissioning, and System Handover.
  • WELDING INSPECTOR OF PIPING
  • Review of Drawings Released for Construction
  • Review of Raw Material and Welding Consumables Against Mill Inspection Certificate Prior to Fabrication
  • Verification of Welding Procedure Specification (WPS) Compliance
  • Verification of Welder Qualification and Range Compliance with WPS
  • Ensure Approved WPS are Available/Posted on Site During Welding
  • Compliance with Inspection Test Plan (ITP) on Every Project
  • Perform Fitting Inspections (Root Gap, Mismatch, Alignment, Tack Welds) Prior to Welding
  • Calibration of Welding Equipment and Measuring Devices
  • Checking Welding Filler Wires and Electrodes
  • Verification of Preheat Temperature Before Welding
  • Monitoring and Controlling Weekly Welder Repair Rate
  • Preventing Cross Contamination Between Different Materials
  • Visual Inspection for Surface Defects
  • Requesting PT or MT after Surface Imperfections Removal
  • Update Weld Map and Weld Summary Reports
  • Inspection of Welds on Different Materials (Carbon Steel, Stainless Steel, Alloy Steel)
  • Testing of Carbon Steel and Alloy Steel Welds According to WPS
  • Receiving Inspection of Consumer Goods According to ASME Section II-C
  • Handling, Storage, and Batch Testing Review
  • Pre and Post-Weld Inspection Responsibility
  • Quality Problem Resolution
  • Supervision of Post Weld Heat Treatment (PWHT)
  • Verification of Punch List After Rectification
  • Closing Non-Conformance Reports (NCRs)
  • Final Documentation Review Before Customer Delivery
  • Maintenance and Calibration Data Update for Equipment
  • Ensuring Proper Filler Wire Use
  • Control of Preheat and Interpass Temperatures
  • Monitoring Welding Parameters (Current, Voltage, Travel Speed, Heat Input)
  • Participation in NDT Exams (PT, RT, MT, UT)
  • Witnessing Welder Qualification Tests (WQT)
  • Verification of Equipment Calibration

Work availability

Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
morning
afternoon
evening
swipe to browse

Timeline

STATIC TANK AND WELDING PIPING PID

DNV
2024.09 - 2026.04

STATIC TANK PID

DNV
2023.08 - 2024.09

WELDING INSPECTOR

WISON
2023.01 - 2023.05

WELDING INSPECTOR

SULZER
2022.06 - 2022.08

WELDING INSPECTOR

TASNEE
2022.05 - 2022.06

WELDING INSPECTOR

Hadi Hamad Al Hamman Group
2021.03 - 2022.01

WELDING INSPECTOR

SINOPEC ENGINEERING GROUP
2019.10 - 2021.02

WELDING INSPECTOR

REDA HAZARD CONTROL
2016.12 - 2019.03

WELDING INSPECTOR

SAUDI ELECTRICITY COMPANY
2016.12 - 2019.03