Driven professional with solid foundation in electrical & instrument engineering principles, combining problem-solving and project management skills. Expertise in designing and implementing electrical systems, with proficiency in team collaboration and technical communication. Eager to contribute to impactful projects and drive success in Lead electrical & instrument engineer role.
Overview
14
14
years of professional experience
6
6
years of post-secondary education
Work history
Lead Engineer - Electrical & Instrumentation
Kolin Insaat
Dhahran, Saudi Arabia
03.2019 - Current
To review the IFC drawings for 13.8 KV primary distribution network & LV network, which includes MV/LV cable routing layouts, single line diagram, cable schedule, duct bank schedules, installation details and technical details and have to make sure that designer followed the concept / standards given by the client
To review the IFC drawings for 18 pump stations, which includes cable routing layouts, MCC panel single line diagram, cable schedule, lighting layout, panel board schedules, Grounding layout, instrumentation layout, installation details and have to make sure that designer followed the concept / standards given by the client
To review the IFC drawings for communication conduit routing for backbone and distribution system, which includes conduit routing layouts, duct bank schedules, manhole schedules, handhole schedules, installation details and have to make sure that designer followed the concept / standards given by the client
To review the IFC interface drawings with client and other contractors for MV system, communication & LV system
Preparation of detailed lighting, power, Fire alarm, cable tray, cable routing, grounding and instrumentation shop drawings, which includes circuit layouts, elevation, installation details for electrical distribution, communication distribution system based on vendor data
To prepare the material take off (MTO) and negotiation with client for change order scope
To review material submittal and NMR documents before submitted to client approval
To prepare the material take off (MTO) and issue request for material purchase
To monitor site activities and lead the construction activities to accomplished the work within project schedule
To prepare weekly progress and monthly progress updates
Prepare the documents for pre-communication activity
To coordinate with vendor and preform the pre- commissioning activities for electrical and instrument & control system
Closing EIL items with PID and Proponent
To coordination with Client to perform the pre-commissioning and commissioning activities of MV/LV Network, pump station equipment’s like MCC, ATS, Generator, Pumps, DDC, Odor control system, Chlorine injection system, Power panels, IRP panel, UPS system, Lighting system, RTU loop checking & RTU/HMI logic verification.
Led team meetings to discuss project objectives and milestones.
Managed project resources effectively for optimal use and minimum waste.
Prepared detailed reports outlining project progress for management review.
Applied best practice engineering principles in the preparation of calculations, drawings and sketches.
Supported management decision-making with expert-level technical guidance.
Worked with SolidWorks and AutoCAD to draft assemblies, models and technical drawings.
Senior Electrical Engineer
Nesma & Partner
Khobar, Saudi Arabia
05.2018 - 01.2019
Preparation of detailed electrical drawings which includes circuit layouts, elevation, installation details and technical calculation for Lighting design, LV power distribution, cable routing layout, & grounding system
Fire alarm, communication system, CCTV drawings are prepared with the concept of local / international standards
Preparation of single line diagram for LV distribution, electrical load calculation, cable schedule, short-circuit & voltage drop calculation by using Ecodial power analysis software
To coordinate with mechanical systems for desired electrical loads of machines (pumps, chillers, air handling units, package units… etc...) and design the required MCC panels for motors
To prepare the material take off (MTO) list for electrical, communication and instrumentation
To monitor site activates and lead the construction activities to accomplished the work within project schedule.
Coordinated with other engineering departments, fostering effective interdisciplinary collaboration.
Utilised CAD software adeptly for precise design and implementation of electrical layouts.
Supervised technical aspects of electrical work on projects, checking system performance, safety and compatibility against benchmarks.
Designed and coordinated electrical services on projects with different budgets, schedules and specifications.
Supervised technicians in installing and maintaining MV, LV, and HV systems, overseeing safety and operational efficiency.
Calculated loads to size sizing wire and circuit protection for optimum performance and safety.
Used advanced AutoCAD skills to develop single line diagrams for electrical power distribution networks.
Electrical Engineer / Design
Nesma & Partner
Dhahran, Saudi Arabia
08.2015 - 04.2018
To review the detailed drawings for 13.8 KV primary distribution network, which includes MV cable routing layouts, single line diagram, cable schedule, duct bank schedules, installation details and technical details and have to make sure that designer followed the concept / standards given by the client
To review the detailed electrical drawings for 3 pump station & 2 lifting station, which includes cable routing layouts, MCC panel single line diagram, cable schedule, lighting layout, panel board schedules, earthing layout, installation details and have to make sure that designer followed the concept / standards given by the client
To review the detailed drawings for communication conduit routing for backbone and distribution system which includes conduit routing layouts, duct bank schedules, manhole schedules, hand hole schedules, installation details and have to make sure that designer followed the concept / standards given by the client
To review the interface drawings with client and other contractors for MV system, communication & LV system
Preparation of detailed electrical and instrument shop drawings which includes circuit layouts, elevation, installation details for electrical distribution, communication distribution system based on vendor data
To prepare the material take off (MTO) list for electrical, communication and instrumentation
To provide the technical support and lead the construction activities to accomplished the work within project schedule.
Design Electrical Engineer
Nesma & Partner
Makkah, Saudi Arabia
08.2013 - 07.2015
Preparation of detailed electrical drawings which includes circuit layouts, elevation, installation details and technical calculation for Lighting design, LV power distribution system, cable routing layout, emergency lighting system & grounding system
Public address system, fire alarm, communication system, CCTV, ACS drawings are prepared with the concept of local / international standards
Apart from the above work, prepared electrical layouts for hotel guest room which have prepared based on standards/ concepts provided by hotel operators (Hotels such as Hilton conventional, Marriott)
The drawings prepared with the co-ordination and concept / standards given by hotel operators, Interior designers and lighting consultant
Preparation of detailed design drawings for Meet rooms / Auditorium audio-visual system with coordination of AV consultant & client
To prepare the various types of kitchen electrical layouts with coordination of kitchen supplier and calculate the kitchen electrical load requirements based on supplier technical specification
Preparation of single line diagram for LV distribution, electrical load calculation, cable schedule, short-circuit & voltage drop calculation by using Ecodial power analysis software
To coordinate with mechanical systems for desired electrical loads of machines (pumps, chillers, air handling units, package units… etc...) and design the required MCC panels for motors
To prepare drawings for 13.8KV/380V MV substation (18 no’s of 1600KVA transformer) & main electrical room for the entire zone (9 MW load).
Electrical Design Engineer
Nesma & Partner
Makkah, Saudi Arabia
03.2011 - 08.2013
Preparation of detailed electrical drawings which includes circuit layouts, elevation, installation details and technical calculation for Lighting design, LV power distribution system, cable routing layout, emergency lighting system & grounding system
Public address system, fire alarm, communication system, CCTV, ACS drawings are prepared with the concept of local / international standards
Apart from above work, prepared electrical system drawings for hotel guest room which prepared based on standards/ concepts provided by hotel operators (Hotels such as Hilton, Hyatt & Conrad)
The drawings have prepared with the co-ordination and concept / standards given by hotel operators, Interior designers and lighting consultants
To prepared on various type kitchen electrical layouts with coordination of kitchen supplier and calculate the kitchen electrical load requirements based on supplier technical specification
Preparation of single line diagram for LV distribution, electrical load calculation, cable schedule, short-circuit & voltage drop calculation by using Ecodial power analysis software
To coordinate with mechanical systems for desired electrical loads of machines (pumps, chillers, air-handling units, package units… etc.) and design the required MCC panels for motors.
Electrical Engineer
Sri Sairam electrical Pvt Ltd.
Tamil Nadu, India
05.2010 - 02.2011
Preparation of detailed electrical drawings for Lighting, Power system, Cable routing with reference to the concept and standards provided by consultants
To monitor the installation and inspection of various panels, such as Transformers, Breaker panels, LV Switchboards, motor control panels, lighting and power distribution board for normal & emergency supply as per the quality aspects and approved procedure
Responsible for preparing as-built electrical drawings as per the site execution
Accountable for the successful execution of construction activities assigned to me from a quality, work scheduling, and effective resource utilization perspective
Ensures that requisitions for materials and equipment have communicated in timely
Preparation of Single line diagram with Auto CAD
Regular coordination with the site supervisor to know the progress and to solve technical / coordination difficulties on site
Plans the work and efficiently organizes and site facilities to meet agreed deadlines
Ensures that level of quality and safety standards are up to client standards and local codes
To attend co-ordination meeting and weekly progress meeting to report the progress and clarify co-ordination problems at site work.
Education
Master of Business Administration - Project Management
Alagappa University (Distance)
Tamil Nadu / India
04.2013 - 04.2015
Bachelor of Engineering - Electrical & Electronics
Anna University
Tamil Nadu, India
04.2006 - 04.2010
Skills
AutoCAD proficiency
Lighting design software Dialux & Relax
Power analysis software Ecodial & ETAP
Windows operating system
MS office
Project management
Communication skills
Problem-solving
Technical report writing
Effective team leadership
Knowledge of safety standards
Languages
English
Fluent
Hindi
Fluent
Tamil
Native
Telugu
Native
Malayalam
Fluent
Custom
Certificates & references shall be provided upon request.
Timeline
Lead Engineer - Electrical & Instrumentation
Kolin Insaat
03.2019 - Current
Senior Electrical Engineer
Nesma & Partner
05.2018 - 01.2019
Electrical Engineer / Design
Nesma & Partner
08.2015 - 04.2018
Design Electrical Engineer
Nesma & Partner
08.2013 - 07.2015
Master of Business Administration - Project Management
Alagappa University (Distance)
04.2013 - 04.2015
Electrical Design Engineer
Nesma & Partner
03.2011 - 08.2013
Electrical Engineer
Sri Sairam electrical Pvt Ltd.
05.2010 - 02.2011
Bachelor of Engineering - Electrical & Electronics