Summary
Overview
Work History
Education
Skills
Languages
Certification
Timeline
Generic

SHAHID ABBAS MALIK

RIYADH

Summary

A versatile and performance driven Telecommunications Technician with over 12 years' experience within the telecommunications industry along with superior communication,negotiation and relationship development skills.

Overview

12
12
years of professional experience
1
1
Certification

Work History

Telecommunication Technician

Wireless Ericsson STC Rollout Projects
11.2021 - Current

STC-Ericsson 5G4 Aspiration TRM Project:

STC-Ericsson Aspiration MOD Project:

Tawal-Ericsson STC Project 2022:

  • Responsible of Installation of Ericsson RBS6000 such as RBS6201,RBS6202, RBS6601
  • Responsible of Installation Eltek,Delta,Enatech Rectifier
  • Installation of 0.9,1.2 and 1.8 SD links, Super Dual Band (SDB) links under Ericsson-STC 5G4 scope.
  • Commissioning of Microwave Transmission SDH/PDH Minilink 2P,6P,20P
  • Performing Fibre Installation and Performing ESC Installation and Integration.
  • Installation of AIR6449 with Baseband RAN processor 6651 under Ericsson-STC scope.
  • Performing internal installation as per customer standard.
  • Power connectivity in Rectifier for all telecom equipment such as RBS, ML, RRU PT link etc.
  • Troubleshooting and replacement of faulty hardware/equipment both indoor and outdoor.
  • Performing commissioning integration and testing.
  • To submit the document as per required Installation, integration and migration of LTE700, LTE1800&LTE2600, L2100, carrier aggregation as per latest MOP.
  • Trail back snags and alarms to clear any CT's/TT's and maintain the high standard of job quality.
  • Analyze site plan to be able to execute well as per SDB.
  • Organize site setup to meet health and safety standards.
  • To interact with STC and Ericsson Network Operators and be part on new technology.
  • Providing installation status reports regularly to project management.
  • Supports PM to prepare / update roll-out schedule Giving proper solutions to major issues on sites.
  • Assisting the Telco riggers.

Telecommunication Technician

Wireless/MW STC-Huawei Aspiration Projects
07.2015 - 10.2021

STC-Huawei Aspiration Project:

Zain-Huawei Reload Phase-II Project:

  • Installation and commissions of BTS3900 series.
  • External alarm patching and verify with Power/Telco NOC team.
  • Communicate with the customer to ensure satisfaction and implement any necessary corrective actions.
  • Communicate with the customer to ensure satisfaction and implement any necessary corrective actions.
  • Provide on-site troubleshooting, validation, and commissioning of BSS & MW.
  • Provide high level technical support to external customers at their location.
  • Ensure the new Sites Delivery till Successful PAT according to defined timelines to meet the targets.
  • Monitor and control CIAG, Site sign/verify in time.
  • Site readiness confirmation, resolution of blocking issues such as indoor outdoor quality, active alarms etc.
  • Performed quality assurance on systems to confirm optimal performance.
  • Installed wiring, cabling and networking hardware on customer premises.
  • Worked closely with network administrators and server engineers to deliver quality service.
  • Internal Pre-PAT for successful RSA sessions.
  • Preparation and submission of Pat documents to reviewer team prior to field visit.
  • Strong command and understanding of all types of PATS (E-PAT, C-PAT, Field-PAT, Office-PAT).
  • Priorities P0/P1/P2 sites and make the PAT plan accordingly.
  • Coordination with MS STC team for NPTS acceptance once field PAT done.
  • Ensue the early and timely arrival of teams on sites and work within WO and closing.

Telecommunication Technician

Wireless Warid Ericsson Project In Relacom Pak
02.2013 - 06.2015

WARID Mobilink Merger Project

  • Successful Completion of Jazz-Ericsson Swap from Alcatel in Center 2 & LTE addition on Warid in LHR, ISB and Peshawar Deployment of RBS 6000 series (6301, 6601 & 6102), transmission Up gradation from R3 to R5 using Mini LINK 2.18 & 2.20 for commissioning of NPUC & MMU2 and troubleshooting of TN & radio Alarms.
  • Existing MW link Upgradation with radio replace from RAU 1 to RAU2 & RBS 2000 to RBS6000 Swap I&C of links by using Traffic Nodes such as 2p,6p,20p and C-Node Cards Swap from MMU2C, MMU2B TO MMU2K
  • For LTE Links R5 Execution of MW-LOS Surveys by performing flag & mirror tests.
  • IDB loading in DUG and troubleshooting of alarms using OMT.
  • Installation of Battery Banks & Power Systems.
  • Rectifier Sub racks and Cabinets patching of External Alarms with the RBS along with GLO alarm verification


Telecommunication Technician

Wireless Huawei Project In EES Pak
09.2011 - 01.2013

PTCL Eagle Project (LTE) Islamabad:

Mobilink-Huawei 2G+3G Swap/ Rollout North:


  • Managing site surveys regarding BTS and Power swap,indoor room modification.
  • Executing the MDTs of feeder less BTS & Node systems.
  • Installation of Huawei BTS3900 series & Huawei ICC1000 series Power Solution in indoor Outdoor.
  • Fault tracing and problem solving in pre-acceptance period and preparation for ATP.
  • Planned and Conducted TSS (technical site survey), Swap activity, E1 Clearance.
  • Installation, commissioning and troubleshooting of BTS 3900/A & HPS 4800.
  • Ensure all external alarms on BTS and OMCR are working prior to Acceptance Test Procedure (ATP).
  • Perform Ping Test for CDMA & LTE for media checking using the ping tool
  • Installation of Huawei BTSDBS3900 LTE V100R005C00SPC370
  • Configuration and Installation of Huawei Radio (RTN 900 series) by using software I Manager U2000 web LCT
  • Full command on site master to resolve VSWR problems.


Education

Three Years Diploma of Associate Engineer - Electrical

Punjab Board of Technical Education
Lahore
08.2007

High School Diploma -

Govt High School
Mianwali
07.2004

Skills

  • Installation and Maintenance
  • Corrective and Preventive Maintenance
  • Hardware and Software Installation
  • Troubleshooting RF, MW systems
  • Work Order Completion
  • Team Collaboration
  • Equipment Safety
  • Safety Awareness
  • WAH
  • QA and QC

Languages

English
Advanced
C1
Urdu
Proficient
C2
Arabic
Upper intermediate
B2

Certification

  • Work at Height, ASTC - Aug-2024


  • Defensive Driving, ASTC - July-2025


  • Electrical Safety, ASTC - Oct-202


  • Basic First Aid, TADAWI - July-2025


  • Safety passport,Huawei - Aug 2025


  • Cyber Security,Data protection and Privacy for contractors, STC - July 2024


Timeline

Telecommunication Technician

Wireless Ericsson STC Rollout Projects
11.2021 - Current

Telecommunication Technician

Wireless/MW STC-Huawei Aspiration Projects
07.2015 - 10.2021

Telecommunication Technician

Wireless Warid Ericsson Project In Relacom Pak
02.2013 - 06.2015

Telecommunication Technician

Wireless Huawei Project In EES Pak
09.2011 - 01.2013

Three Years Diploma of Associate Engineer - Electrical

Punjab Board of Technical Education

High School Diploma -

Govt High School
SHAHID ABBAS MALIK