Ambitious Operations Manager with more than 24 years of management experience in construction industry. Applies strong analytical and critical thinking skills to solve complex operational problems.
I am working as Operations Manager for 3D Precast, I am assigned to manage and supervise below mentioned inhouse departments for better efficiency.
· Design Team – Architect & Structure Engineer along with Draftsmen.
· Contract & Estimation Team
· Precast Production in Factory
· Installation Works at Project Site.
We have facility to produce 3D Precast Modular which is modern way of construction to build residential & commercial buildings. We have in- house design team of Architects & Structure engineer to develop custom made design as per client requirement.
Main features of 3D Precast is Modern Architecture Design, Construction Speed and Best Quality Product.
I was working as a Project Manager, so I was managing all execution works staring from foundation till completion of structure. The Project worth was 380 Million Saudi Riyal and it was Residential Building Project.
I am working as a Construction Division Manager, I was controlling all the projects undertaken by Company and manage it from start to finish.
All above projects are Turnkey Projects.
I have completed Multi projects (residential and commercial) during my stay in this company.
I worked in Qatar for 13 years as Operations Manager to manage all the construction activities at factory and project sites.
I have completed many residential and commercial projects in these 13 years, some of them are mentioned below as highlights.
Residential Projects (Apartment Buildings and Villa Projects)
Qatar Rail Project (Elevated Segment)
Shopping Mall Project (450,000 sq.meter)
Underground Car Parking Projects (03 stories below ground)
Bridges Project
Resort Project at Island
I was controlling 3000 plus manpower and staff on projects, with best of cost efficiency, quality and timely delivering project is main features of management skills.
Supervise all type of work related to bridge like piling, excavation, formwork, fixing of steel and concreting etc.
Preparation of Bills of Quantities, bar bending schedule, procurement of material, checking monthly bills of sub-contractors.
Assistance to senior engineer in preparing reports and monthly bills.
Its been 24 years in Construction Industry but still I am exploring more and more to encounter day to day problems in execution of work at projects. The motive is to be cost effective in execution, achieve best quality with safe work environment and to complete the project in given time frame.
I am always ready to face new challenges and to sort them out with best possible way. I am a Team Leader who always lead the team from front to show the right path and to motivate them for the maximum outcome from activities at project.