Executed replacement of a 50-ton Methanator and a 60-ton Decomposer during the 2020 IBB Turnaround for IBB- SABIC affiliate, including rigging, heavy lifting, positioning, alignment, and reinstatement, utilizing a 750-ton mobile crane in accordance with approved lift plans and HSE requirements., Executed Removal and installation of a 80-ton Heat Exchanger, including civil foundation replacement, during the 2022 Al-Bayroni Turnaround for Al Bayroni, SABIC affiliate, involving heavy lifting with a 1,200-ton mobile crane., Executed parallel pump replacement and upgrade during 2022 Ibnzahar Turnaround (SABIC), Installed and commissioned Atlas Copco make air compressor during the 2026 SAFCO-05 Shutdown (SABIC), executing civil foundation works, piping & instrumentation installation, MV power cable laying, PLC logic implementation, and DCS integration with vendors, ensuring on-schedule handover and full HSE compliance., Directed full lifecycle execution of safety shower and eye wash installations at SABIC Agri Nutrient, managing engineering design, New Eye wash unit procurement from manufacturer Huges ,on-site installation & commissioning, ensuring compliance with safety and operational standards., FA & FP upgradation project to meet operational and safety standards. Execution of projects linked with Fire system which requires HCIS approval at Al Bayroni , SABIC., Product transfer line project for Phosphoric acid service at Maaden Phosphate company., Double Block and Bleed arrangement at multiple areas of SAN, Execution of Tie In packages during 2022 SAMAC Turnaround, for scrubber expansion project, De coke Piping upgradation project at Saudi Chevron Philips, Chiller Upgradation project at EG-2 of SHARQ affiliate of SABIC during 2015, Flame Scanner upgradation at Utility boilers of SAFCO, SABIC affiliate during 2023