Summary
Overview
Work history
Education
Skills
Timeline
Generic
Sherif Elnaggar

Sherif Elnaggar

NEOM,Saudi Arabia

Summary

  • Civil Engineer with more Than 23 years of experience in high-level Project Management in the construction of Hospitals, Malls, 5-star Hotels, Palaces, Housing Villas, Water Tanks, facility developments and infrastructure.
  • Primarily focused on the implementation of Mega projects under standard specifications and codes.
  • Excellent project management abilities, possess a wide range of technical skills, Estimation, Cost Control, Quality Control and Assurance, Risk Management, Site Management and communication abilities.
  • Multi-billion Dollar Projects – Experience with infrastructure, Steel Structure and Superstructure.
  • Projects exceeding 5 billion US. Integration of Solutions – Identifying process strengths, and weaknesses and employing best practices to manage either or both.
  • Service & Development – Formulating metrics to facilitate measurements, analysis and reporting.

Overview

26
26
years of professional experience
6
6
years of post-secondary education

Work history

Construction manager

BEC Arabia
NEOM, Saudi Arabia
06.2022 - Current

Projects Features:-

  • The Multi-Purpose Meeting Halls (MPH) Zone consists of flexible multipurpose halls, various meeting rooms, restrooms, prayer rooms, a central service block, and other amenities.
    The NEOM Community 1 Multi-Purpose Meeting Halls (MPH) Zone is dedicated to NEOM-related business.
  • The zone will be used for office space, executive meetings, town halls, exhibitions, and other events as required.
  • The new MPH Zone will also be able to host multiple events at the same time with catering and hospitality capabilities.
  • Therefore, the design shall be emblematic of the spirit and atmosphere associated with a modern and sustainable lifestyle.
    The project is located inside the existing NEOM Community 1 with a total site area of 21,143 SQM.
  • The Contractor’s scope includes the design, engineering, equipping, installation, execution, completion, testing, and commissioning works related to “NEOM Community proposed “Exhibition Centre / Multipurpose Hall development, outdoor landscape area, and Infrastructure work inside of the plot”.


Job Description:-

  • The scope of works includes the continuous follow-up of the supply of materials, equipment, and labour and all other requirements needed for construction, completion, testing, commissioning, and maintenance works and all temporary, additional, complementary works and modifications which the Employer may demand from the Contractor to carry out, all under the Contract, the scope of work and its relevant documents.
  • Collaborated with construction administration consultants to schedule field observations.
  • Held construction and installation teams accountable for performance against specific schedules and man-hour budgets.
  • Led management of site quality assurance in conjunction with QA Manager.
  • Filed and maintained all subcontractor documentation for future reference.
  • Identified and implemented safety, productivity and efficiency improvement initiatives.
  • Managed site instructions, daily diary, record sheets and other forms of site reporting.
  • Delivered short-term plans and performance requirements, holding weekly progress meetings.
  • Conducted critical pre-installation conferences with contractors, subcontractors and key stakeholders, negotiating the best possible project progression.
  • Reported on progress, problems and information requirements.
  • Performed detailed safety briefings and new team member inductions, reducing onsite risks.
  • Coached and mentored junior painters to achieve highly skilled, hardworking teams.
  • Implemented strict health and safety regulations for continued compliance with site requirements.

Construction manager

Industrial Construction&Engineering Comp. SIAC
Cairo, Egypt
05.2016 - 05.2022

1- Projects Features:-
Development of Alexandria City Centre Mall

( Carrefour City Center - Majed Alfateam ).

Projects Scope:-

- Implementation of Steel Structure, Civil and Architectural, MEP. Works including 13,000 M2(EPDM)

Insulation.

2- Projects Features:-

Privet Palace construction project ( Mansour Palace).

Projects Scope:-

- Total area 25000 SQ.M

- Civil and Architectural Works with a wide Finishing Variety of False ceilings, GRC, GRG, Painting, Tiles and Marbles.

- Fountains, Swimming Pools and SPA.
- Irrigation (Tanks and Networks).
- Landscape Works (HardScape and SoftScape).
- Telecommunication, LV and Street Lighting Networks.
- Infrastructure and MEP Works.
- Road Paving Networks.

Job Description:-

  • Communicated with clients and customers to proactively deliver relevant information.
  • Promoted best practices in health, safety and environmental matters in conjunction with the SHEQ department.
  • Held construction and installation teams accountable for performance against specific schedules and man-hour budgets.
  • Oversaw all day-to-day site operations.
  • Managed site instructions, daily diary, record sheets and other forms of site reporting.
  • Led management of site quality assurance in conjunction with QA Manager.
  • Identified and implemented safety, productivity and efficiency improvement initiatives.
  • Implemented strict health and safety regulations for continued compliance with site requirements.

Construction manager

Mediterranean Contracting Company
Hurghada, Egypt
01.2013 - 05.2016

Project Feature:-

  • Establishment of a five-star Hotel (Mercure Hurghada).

Projects Scope:-

  • 20 Buildings composed of 280 Suites and Rooms. Implementation of 3 swimming Pools, infrastructure, Landscape and MEP Works.

Job Description:-

  • Communicated with clients and customers to proactively deliver relevant information.
  • Promoted best practices in health, safety and environmental matters in conjunction with the SHEQ department.
  • Collaborated with construction administration consultants to schedule field observations.
  • Held construction and installation teams accountable for performance against specific schedules and man-hour budgets.
  • Led management of site quality assurance in conjunction with QA Manager.
  • Filed and maintained all subcontractor documentation for future reference.
  • Identified and implemented safety, productivity and efficiency improvement initiatives.
  • Oversaw all day-to-day site operations.
  • Managed site instructions, daily diary, record sheets and other forms of site reporting.
  • Conducted routine quality audits, verifying progression against specifications and initiating corrective actions to remedy concerns.
  • Enforced quality procedures for all temporary and permanent construction and installation activities.
  • Delivered short-term plans and performance requirements, holding weekly progress meetings.
  • Conducted critical pre-installation conferences with contractors, subcontractors and key stakeholders, negotiating best-possible project progression.
  • Provided mentorship, support and team management to keep staff suitably trained and competent.
  • Reported on progress, problems and information requirements.
  • Performed detailed safety briefings and new team member inductions, reducing onsite risks.
  • Coached and mentored junior painters to achieve highly skilled, hardworking teams.
  • Implemented strict health and safety regulations for continued compliance with site requirements.
  • Thoroughly vetted contractors before recruitment, ensuring qualifications and licenses were accurate and current.
  • Supported cost-effective working methods to reduce project outgoings and maximise potential profits.

Construction manager

DETAC Construction & Trading
Cairo, Egypt
05.2011 - 01.2013

Projects Feature:-

General Union Chamber of Commerce Building.

Projects Scope:-

- Implementation Administration Offices Superstructure.

- Civil and Architectural Works with a wide Finishing Variety of False ceilings, GRC, GRG, Painting, Tiles and Marbles.

- Telecommunication, LV Networks.

- Infrastructure and MEP Works.

Job Description:-

  • Communicated with clients and customers to proactively deliver relevant information.
  • Promoted best practice in health, safety and environmental matters in conjunction with SHEQ department.
  • Collaborated with construction administration consultants to schedule field observations.
  • Held construction and installation teams accountable for performance against specific schedules and man-hour budgets.
  • Led management of site quality assurance in conjunction with QA Manager.
  • Filed and maintained all subcontractor documentation for future reference.
  • Identified and implemented safety, productivity and efficiency improvement initiatives.
  • Oversaw all day-to-day site operations.
  • Managed site instructions, daily diary, record sheets and other forms of site reporting.
  • Conducted routine quality audits, verifying progression against specifications and initiating corrective actions to remedy concerns.
  • Enforced quality procedures for all temporary and permanent construction and installation activities.
  • Delivered short-term plans and performance requirements, holding weekly progress meetings.
  • Conducted critical pre-installation conferences with contractors, subcontractors and key stakeholders, negotiating best-possible project progression.
  • Provided mentorship, support and team management to keep staff suitably trained and competent.
  • Reported on progress, problems and information requirements.
  • Performed detailed safety briefings and new team member inductions, reducing onsite risks.
  • Coached and mentored junior painters to achieve highly skilled, hardworking teams.
  • Implemented strict health and safety regulations for continued compliance with site requirements.
  • Thoroughly vetted contractors before recruitment, ensuring qualifications and licenses were accurate and current.
  • Supported cost-effective working methods to reduce project outgoings and maximise potential profits.

Zone manager

El‐Marasem Int. for Development “BEN LADEN Group"
Cairo, Egypt
07.2008 - 05.2011

Project Feature:-

  • Ellegeria Project (SODIC).


Projects Scope:-

- 17 Housing Villas.
- 12 Palaces.
- Small Bridges.
- Gulf Areas and Landscape.
- Infrastructure and MEP. Works.
- Road Paving Networks.
- Civil and Architectural Works with wide Finishing Varieties.
- Water Tanks.
- Telecommunication, LV and Street Lighting Networks. Project Area: More Than 250,000 m2.


Job Description:-

  • Motivated teams to deadlines through regular site visits and inspections, problem-solving accordingly and eliminating bottlenecks.
  • Assessed costs of labour and materials for each activity, ensuring adherence to budgetary requirements.
  • Determined elevation levels and grade of construction grounds to best proceed with.
  • Prepared detailed reports and forecasts relating to construction progress, and resource allocation to effectively control costs.
  • Promoted job site safety through, encouraging safe work practices and rectifying job site hazards immediately.
  • Worked within current codes of practice to maintain the health and safety of staff at all times.
  • Monitored daily construction details and progress, preparing schedules and supervising the completion of final punch lists to maintain.
  • Maintained high-quality standards while administering good construction safety practices with all on-site activities.
  • Created detailed designs using ACAD, presenting them to internal staff and external agencies where necessary.
  • Maintained strict construction schedules, identifying and solving issues within time schedule to minimise delays.
  • Supervised implementation of work packages, from approval to package closeout and post-maintenance testing.
  • Created detailed project schedules, working closely with contractors to manage deadlines.
  • Managed employees, communicating effectively in-house and with external stakeholders for a smooth project running.
  • Visited sites to check project progress and eliminate bottlenecks.
  • Monitored the workmanship of subcontractors to ensure compliance with specifications and procedures.
  • Mentored junior team members, increasing their ability to manage senior tasks and improving overall team productivity.
  • Handled inventories and product orders with precision, keeping the project in line with budget.
  • Supervised 250+ field personnel to achieve project completion to schedule with quality workmanship that conforms to original plans and specifications.
  • Reviewed construction plans and financial projections, verifying the accuracy and feasibility of the project.

Construction engineer

Wadi El-Nile for Contracting & Real Estate Inv.
Cairo, Egypt
01.2005 - 07.2008

Projects Features:-

- Developed Matrooh General Hospital (January 2006 - March 2008).

- Building Health Department, El-Maragha City, Sohag (April 2006 - 2007).

- Building Health Unite, Basona Village, Sohag (April 2006 - April 2007).

- Building Health Unite, Bany Weshah Village, Sohag (April 2006 - April 2007).

- Building Health Unite, Behta , Sohag (April 2006 - April 2007).

- Building Health Unite, El-Salam Village, Matrooh (Jan 2005- Dec 2005).

- Building Health Unite, El-Nohood Village, Matrooh (March 2005, June 2005)


Projects Scope:-

Estimating, scheduling, work planning, submittal review, and oversight of trades/subcontractors
• Manage implementation of civil & arch. Activities for projects.
• Installation cladding for X-ray room.
• Implementation of hot water pipes, pumps, Boiler, LPG tank and medical gas pipes.
• Execution RC. Foundations, Flat slabs.


Job Description:-


  • Maintained high-quality standards while administering good construction safety practices with all on-site activities.
  • Minimised costs.
  • Motivated teams to deadlines through regular site work and inspections, problem-solving accordingly and eliminating bottlenecks.
  • Prepared detailed reports and forecasts relating to construction progress, resource allocation and effective control costs.
  • Follow-up detail project schedules, working closely with contractors to manage deadlines.
  • Monitored daily construction details and progress, preparing schedules and supervising the completion of final punch lists to maintain.

Construction site engineer

Alexandria Company For Construction
Alexandria, Egypt
01.2001 - 01.2005

Projects Features:-

  • Egyptian Navy Barracks Projects.

Projects Scope:-

  • Implementation of all Civil works RC, Foundations and Solid Slab.
  • Implantation Architectural Works Tiles, Painting, Wooden Doors.
  • Implementation MEP. Works.

Job Description:-

  • Oversaw Quality Control (QC) for construction teams, delivering results in line with project specifications.
  • Minimised project risks, conducting structural monitoring to ensure maximum safety and stability.
  • Communicated with clients and client representatives, attending regular meetings to update on progress.
  • Checked technical drawings for adherence to standards, and maintaining operational compliance.
  • Completed projects on time and within budget by collaborating with contractors, architects and public authorities.
  • Prepared and reviewed engineering specifications, scopes of work, schedules of payments and associated documents.
  • Oversaw selection and requisition of materials.
  • Documented daily progress, incidents and issue resolutions for accurate site records.
  • Measured, marked out and levelled sites to enable prompt start times for large-scale construction projects.
  • Estimated labour and material requirements to enable accurate budget planning.
  • Understood environmental project impacts to plan appropriate eco-friendly solutions.
  • Wrote down work schedules and communicated changes to crew members and clients.
  • Evaluated operational costs and identified cost-cutting opportunities to keep the project under budget.
  • Onboarded contractors with correct health and safety training for a compliant workforce.
  • Set and implemented work schedules to allow for snagging and quality assurance tasks.
  • Collated information to produce reports for stakeholders on project progress, delivery and completion.
  • Inspected sites to verify safety and environmental conformance ahead of work commencement.
  • Motivated teams to deadlines through regular site visits and inspections, problem-solving accordingly and eliminating bottlenecks.
  • Supervised site work to verify quality and safety standards ahead of sign-off.
  • Delegated tasks and communicated deadlines to maintain good project progress.

Site civil engineer

Egyption Armed Forces
Alexandria, Egypt
07.1997 - 12.2000
  • Tested sites and materials to assess strength and quality.
  • Visited sites to review work progress and drive process improvements.
  • Evaluated project compliance with design specifications and safety standards.
  • Completed projects on time and within budget by collaborating with contractors, architects and public authorities.
  • Oversaw Quality Control (QC) for construction teams, delivering results in line with project specifications.
  • Prepared technical reports and arranged for survey or investigation work.
  • Estimated quantities and cost of materials, equipment and labour requirements to determine project feasibility.
  • Inspected completed civil works and documented safety and compliance findings.
  • Collaborated cross-functionally with technical and non-technical personnel to meet project objectives.
  • Supported on-time and under-budget project completion by proactively communicating challenges and updates.
  • Completed technical reviews to gauge work quality and compliance with requirements.
  • Oversaw technical, financial and operational requirements for civil engineering projects.

Education

Bachelor of Engineering - Engineering

Higher Technological Institute
10th Of Ramadan City - Egypt
10.1991 - 07.1997

Skills

  • PMP Attendance
  • E-promise
  • BIM 360
  • AutoCAD & Autodesk
  • Microsoft office
  • Consulting techniques
  • Engaging leadership style
  • Life-cycle project competence
  • Schedule management
  • Adept in construction technology
  • Customer relations
  • Construction procurement expertise
  • Construction material procurement
  • Labour resource allocation
  • Building systems and services
  • Project planning
  • Design and planning
  • Stakeholder management
  • Inspection principles
  • Construction management
  • Exemplary communication
  • Interior and exterior renovation
  • Residential construction
  • Construction safety compliance
  • Subcontractor management
  • Construction documentation management

Timeline

Construction manager

BEC Arabia
06.2022 - Current

Construction manager

Industrial Construction&Engineering Comp. SIAC
05.2016 - 05.2022

Construction manager

Mediterranean Contracting Company
01.2013 - 05.2016

Construction manager

DETAC Construction & Trading
05.2011 - 01.2013

Zone manager

El‐Marasem Int. for Development “BEN LADEN Group"
07.2008 - 05.2011

Construction engineer

Wadi El-Nile for Contracting & Real Estate Inv.
01.2005 - 07.2008

Construction site engineer

Alexandria Company For Construction
01.2001 - 01.2005

Site civil engineer

Egyption Armed Forces
07.1997 - 12.2000

Bachelor of Engineering - Engineering

Higher Technological Institute
10.1991 - 07.1997
Sherif Elnaggar