Summary
Overview
Work History
Education
Skills
Timeline
Work Preference
Generic
SIYAD ABDUL SAMAD

SIYAD ABDUL SAMAD

Site incharge
Al Jubail,Eastern Province

Summary

I am currently working in Tasnee petrochemical plant as a mechanical maintenance supervisor. I have 17 years’ experience in petrochemical field in polymer industry as a Mechanical Supervisor and Rotating equipment Technician. The major experience is in turnaround maintenance of extruder, compressors, and other rotating equipment.

Overview

18
18
years of professional experience
3
3
years of post-secondary education
5
5
Languages

Work History

Contractor, Site in charge

Tasnee HDPE Plant
12.2022 - Current
  • Perform PM, CM, and shutdown activities of rotating equipment from HDPE plant
  • Plan the PM activity from the look ahead list as per the availability of equipment and spare parts
  • As per the planning arrange the spare parts and workforce
  • Prepare and record daily job report
  • Prepare the checklists and confirm the job is executed as per the SMP
  • Conducting Daily Toolbox talk with employees and record the documents
  • Maintain official communication with Operation and Client
  • Arrange the additional resources for emergency jobs and shutdowns.
  • Skilled at working independently and collaboratively in a team environment.
  • Excellent communication skills, both verbal and written.
  • Worked well in a team setting, providing support and guidance.
  • Assisted with day-to-day operations, working efficiently and productively with all team members.
  • Managed time efficiently in order to complete all tasks within deadlines.
  • Proved successful working within tight deadlines and a fast-paced environment.

Senior Mechanical Technician

S.M.H Industrial Services Ltd
03.2013 - 12.2022
  • Attending site visit with planning team for preparation of execution plan and quotation
  • Overhauling of several types of heavy rotating equipment such as turbines, compressors, and extruders
  • Arrangements of site before starting shutdown or turnaround
  • Checking the availability of spare parts with drawing and warehouse material list
  • Arrangements and fabrication special tools
  • Conducting the alignment of rotating equipment with laser and dial alignment method and preparation of alignment report after the completion of the job
  • Training the junior technicians and Saudi trainees in equipment overhauling and the using precision tools
  • Attending daily meetings with client and safety meetings
  • MAJOR PROJECTS WITH SMH
  • Turnaround jobs of Cooperion Extruders and Gear reducers in Saudi Chevron Plant in 2023 Jan-Mar
  • Man Turbo Compressor Jobs in Tasnee PDH plant at 2022 March
  • Overhauling of JSW extruder and ABEX gear reducer in Saudi Kayan PP plant At Feb 2022
  • Overhauling of Ishibashi gear gear Reducer and Planetary gearbox of sharq PP plant in October 2021
  • Overhauling of FD/ID fan, gear box, Clutch and Turbine in Arrazi in 2021 turn around
  • Overhauling of classifier and vibrating screens in Sadara plant in 2020 Jan
  • Overhauling of rotary vacuum filters and screw conveyors in 2019 march Ibn Rush complex turn around
  • Overhauling of reciprocating compressors in SADARA shutdown 2019 February
  • Overhauling of extruder (KOBELCO) in IBN Zahr 2019 January
  • Overhauling of expanders in Sabic Gas plant in 2018 may and November
  • Overhauling of steam turbine (MHI 42 mw) and HP, LP barrel type compressors in Ar Razi 2017 may
  • Extruder gearbox (Suprex) overhauling in Sahara Petrochemical 2017 march turnaround
  • Overhauling of extruder (coperion) and pelletizer in Saudi Chevron 2016 November turnaround
  • Overhauling and service of reciprocating compressors in saudi kayan and Sharq
  • Overhauling of screw compressors (Mycom, GE) in 2015 December Saudi kayan turn around
  • BPA agitator overhauling in 2013 march Saudi Kayan turn around
  • Black line extruder (Kobelco) overhauling in 2015 July Tasnee shutdown
  • Overhauling of Split type centrifugal Compressor in 2016 February Al Bayroni turn around

Mechanical Technician

SAUDI KAYAN-SABIC
05.2011 - 03.2013
  • Maintenance of Cooling Towers like changing gear boxes, angle setting of blades, oil seal changing and sprinkler changing
  • Maintenance job in turbines
  • Familiar with incinerators’, effluent treatment plant, water treatment plant jobs
  • Overhauling and assembling of blower
  • Expert in LASER alignment and rivers alignment
  • PM jobs pumps, Gear boxes and steam turbine
  • Assisting with online sealing team.

Mechanical Technician

AL YAMI CONTRACTING Est
12.2006 - 02.2011
  • Shutdown works in Demin vessels
  • Changing resins, nozzles and removal of rubber lining
  • Supervising the new rubber lining jobs
  • Overhauling and box up of heat exchangers
  • Overhauling of FD/ID fans , Gear box
  • Assisting with inspection group on vessel inspection
  • Conducting hydro test and iris test for heat exchangers
  • Supervising hydro jetting group and rigging group
  • Maintenance of Screw feeders and extruders
  • Overhauling and Maintenance of Agitators, Overhauling and Alignment of Blowers
  • Overhauling and Alignment of vertical Pumps., 4
  • Overhauling and PM jobs of sea water pumps, caustic pumps (BETRAMS),boiler feed water pumps
  • Remove and install new fin fans
  • Follow the PM chart for all equipment
  • Do the maintenance in Pill cooler
  • Overhauling of various types of pumps
  • Do the maintenance of Bucket elevators, Rollers, and Conveyor belts
  • Follow the PM chart for all equipment
  • Overhauling of steam Turbines (MITSUBISHI)
  • Overhauling of Centrifugal Compressors (MITSUBISHI)
  • PM Job of fin fans
  • Prepare the spare parts and special tools for shutdown.

Education

Diploma - Mechanical Engineering

Adoor Polytechnic College
Kerala
06.2002 - 07.2004

H.S.S - undefined

Chavara
2005

S.S.L.C - undefined

1999

Plus Two - Science

G.H
2001

S.S - undefined

HSSE Training Work Permit Training. - undefined

Skills

  • Computer Knowledge
  • MS Office, Office 365, AutoCAD
  • Skills
  • Flexible to work in different shifts and different location
  • Team Building and coordination skills
  • Problem solving ability & Innovative Thinking
  • Flexibility and willingness to work under pressure
  • Highly positive attitude and ability to work in a team
  • Work Order Interpretation
  • Power Tool Operation
  • Predictive and Preventive Maintenance
  • Production Equipment Installation
  • Lockout and Tagout Procedures
  • Conveyor Systems
  • Mechanical Troubleshooting

Timeline

Contractor, Site in charge

Tasnee HDPE Plant
12.2022 - Current

Senior Mechanical Technician

S.M.H Industrial Services Ltd
03.2013 - 12.2022

Mechanical Technician

SAUDI KAYAN-SABIC
05.2011 - 03.2013

Mechanical Technician

AL YAMI CONTRACTING Est
12.2006 - 02.2011

Diploma - Mechanical Engineering

Adoor Polytechnic College
06.2002 - 07.2004

H.S.S - undefined

Chavara

S.S.L.C - undefined

Plus Two - Science

G.H

S.S - undefined

HSSE Training Work Permit Training. - undefined

Work Preference

Work Type

Full Time
SIYAD ABDUL SAMADSite incharge