Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
Overview
3
3
years of post-secondary education
6
6
years of professional experience
Work History
Maintenance Engineer
Katerra Saudi Arabia LLC
KAEC, Jeddah
10.2019 - Current
Work Responsibility,
Installation , PM activities and Breakdown Troubleshooting of Modern technology precast factories.
Concrete Batching Plant 90 cum / hr., 120 cum / hr(ELKON). Installation ,PM activities and B/D troubleshooting.
Extrude Tech chiller plant installation,PM Activities and B/D troubleshooting at peak temperature times.
Steel plant Machine installation (Mesh ,lattice ,stirrup bending and straight bar cutting),PM activities and B/D troubleshooting.
1. Mesh plant Progress group (MSR unit and SWR unit , wires up-to 12 mm,mesh size Max 6M X4 M).
2. EBA Stirrup bending Progress group (2D & 3D Bending , Wires Up-to 12 mm)
3. Lattice Girder GMT group (single and double girder ,70 to 400 mm H ,wires up-to 5 to 16 mm straight ,diagonal 5 to 7mm).
4. Shear and Auto bending straight bar OSCAM group (straight bar cutting ,discharge conveyor Robot auto bending, K left and right manual Bending).
Gantry crane and EOT crane(GH,EMECH,ABUS,MET) type structure Installation(Bus bar,Rail installation),PM activities and B/D troubleshooting.
Hydraulic table installation (double acting and telescopic cylinder) ,power-pack routing and B/D troubleshooting.
Battery Mould (use of precast vertical panel casting )equipment installation,PM activities and B/D troubleshooting.(Machine operating majorly through hydraulic).
Concrete distributor(speedy ) BINACHI group. PM activities and B/D troubleshooting.
POD Mold tech group (Affordable room casting) Equipment installation ,PM activities and B/D troubleshooting.(Machine operation through hydraulic systems).
POD turning device 180 Degree Mold tech group.Equipment installation ,PM activities and B/D troubleshooting.( device working with telescopic cylinder four stage of operation ).