Summary
Overview
Work History
Education
Skills
Timeline
Generic

SURENDER RAJENDRAN

Maintenance Engineer
Jeddah,02

Summary

Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.

Overview

3
3
years of post-secondary education
6
6
years of professional experience

Work History

Maintenance Engineer

Katerra Saudi Arabia LLC
KAEC, Jeddah
10.2019 - Current

Work Responsibility,

  • Installation , PM activities and Breakdown Troubleshooting of Modern technology precast factories.
  • Concrete Batching Plant 90 cum / hr., 120 cum / hr(ELKON). Installation ,PM activities and B/D troubleshooting.
  • Extrude Tech chiller plant installation,PM Activities and B/D troubleshooting at peak temperature times.
  • Steel plant Machine installation (Mesh ,lattice ,stirrup bending and straight bar cutting),PM activities and B/D troubleshooting.
  • 1. Mesh plant Progress group (MSR unit and SWR unit , wires up-to 12 mm,mesh size Max 6M X4 M).
  • 2. EBA Stirrup bending Progress group (2D & 3D Bending , Wires Up-to 12 mm)
  • 3. Lattice Girder GMT group (single and double girder ,70 to 400 mm H ,wires up-to 5 to 16 mm straight ,diagonal 5 to 7mm).
  • 4. Shear and Auto bending straight bar OSCAM group (straight bar cutting ,discharge conveyor Robot auto bending, K left and right manual Bending).
  • Gantry crane and EOT crane(GH,EMECH,ABUS,MET) type structure Installation(Bus bar,Rail installation),PM activities and B/D troubleshooting.
  • Hydraulic table installation (double acting and telescopic cylinder) ,power-pack routing and B/D troubleshooting.
  • Battery Mould (use of precast vertical panel casting )equipment installation,PM activities and B/D troubleshooting.(Machine operating majorly through hydraulic).
  • Concrete distributor(speedy ) BINACHI group. PM activities and B/D troubleshooting.
  • POD Mold tech group (Affordable room casting) Equipment installation ,PM activities and B/D troubleshooting.(Machine operation through hydraulic systems).
  • POD turning device 180 Degree Mold tech group.Equipment installation ,PM activities and B/D troubleshooting.( device working with telescopic cylinder four stage of operation ).
  • Steam Curing system(Kraft group) Installation ,PM activities ,B/D troubleshooting.
  • And other construction-based machines like power tools, tower light, air compressor machines ,generator PM activities and B/D troubleshooting .
  • PEB Structure building fire fighting ,Mechanical Installation and infrastructure works.
  • To analyses critical spares of machines and warranty follow up with asset suppliers.
  • Material PR creation and follow up with Purchase team.

Jr.Maintenance Engineer

RAK Precast
Dubai, United Arab Emirates
10.2018 - 10.2019

Work Responsibility,

  • Maintenance of batching plant (wiggert+ co concrete),hollow core slip former(echo),Centre shifter ( EBAWE),multi angle cutting saw machine (ELEMATIC & ECHO),flying bucket, Gantry crane, EOT cranes ,Auxiliary Machines & Generators.
  • To maintain the Boiler (diesel) for curing hollow core and steam Boiler (diesel& propane gas) for precast beams.
  • To maintain air compressor for Batching plant and all other pneumatic systems.
  • To maintain the water and electricity circulation for factory, office and labor camps.
  • To maintain the Air conditioner for accommodation & HVAC for office buildings.
  • Preparation and planning of daily maintenance, preventive maintenance and annual maintenance plans
  • Executing active maintenance and predictive maintenance to minimize the break down time
  • Assessment of newly installed equipment to ensure maintainability parts. Drawings and installation work
  • Review repair and cost to determine repair, rebuild, overhaul and corrective maintenance needs
  • Review the per services to ensure that they are conducted on time and according to standards
  • Conduct studies need to increase equipment reliability while reducing maintenance cost
  • Ordering necessary spare parts of all machines according to budget and usage
  • Monitoring of electrical and water consumption making plan for reducing the use.

Production Supervisor

KEF Infra
Krishnagiri, Tamilnadu ,India
07.2016 - 10.2018

Work Responsibilities,

  • Precast production & fabrication (column, beam, solid slab, staircase, priestess solid slab, wall Panel, compound wall and cladding panel, parapet).
  • Managing and improving production processes to enhance product quality and Maximize efficiency.
  • Identifying problems or bottlenecks in the production processes.
  • Directly supervising hourly production.
  • Tracking staff absenteeism and timekeeping.
  • Ensuring the safest working environment possible for staff.
  • Planning, assigning, and directing production work.
  • Appraising staff performance.
  • Rewarding or disciplining employees.
  • Periodically carrying out office work.
  • Addressing employee complaints and resolving any problems.
  • Actively working to eliminate hazards that may cause injury.
  • Organizing and prioritizing production needs.
  • Carrying out accident investigations.
  • Making sure that products are to the highest grade and production standards.

Training Engineer

Yess Tech Engineers and Builders
Krishnagiri, Tamil nadu,India
04.2015 - 04.2016

Work Responsibilities,

  • Precast production & fabrication (column, beam, solid slab, staircase, priestess solid slab, wall panel, compound wall and cladding panel, parapet).
  • To handle all M/C for production like welding m/c, grinding m/c, drilling m/c.
  • Production work (column, beam, and wall panel section).
  • Analyze precast drawings and prepare production plan.
  • Fabrication and Installation of Hollow core table.
  • Fabrication work for all type of precast insert plates for Erection and production.
  • Railing work for EBAWE conveyor and ELEMATIC conveyor.
  • Column extension fabrication work for stress alignment design of Kirby.
  • Fabrication work for batching plant assembling work.
  • Engage with planning team and prepare production plan
  • Control labor in columns and beam section.

Education

Bachelor of Engineering - Mechanical Engineering

Sapthagiri College of Engineering
Dharmapuri
06.2012 - 04.2015

Skills

    Maintenance of engineering systems

undefined

Timeline

Maintenance Engineer

Katerra Saudi Arabia LLC
10.2019 - Current

Jr.Maintenance Engineer

RAK Precast
10.2018 - 10.2019

Production Supervisor

KEF Infra
07.2016 - 10.2018

Training Engineer

Yess Tech Engineers and Builders
04.2015 - 04.2016

Bachelor of Engineering - Mechanical Engineering

Sapthagiri College of Engineering
06.2012 - 04.2015
SURENDER RAJENDRANMaintenance Engineer