Meticulous Aramco approved Quality Control Manager with 21 years of experience. Talented at performing detail-oriented inspections and training employees for excellent service. Accomplished at meeting long-term financial and quality goals.
· Ensuring and quality checking as per site activities as per Aramco ITP and checklist.
· Documents review of material receiving inspection procedure, equipment and piping installation i procedure, internal installation procedure and hydrotest procedure etc.
· Prior to material receiving inspection at job site, ensure to review of “Documents review “of inspection report, inspection certificate, packing list, non-conformities as per final disposition report, final inspection shipping releasing report and pending punch points etc
· . Witnessing of material receiving inspections and storage & preservation activities as per Company standards and vendor approved procedure.
· Attending witness and hold point inspections of specific material receiving, installation and commissioning activities at job site.
· Preinstallation and install inspections at job site as per relevant ITP (SATIP-D-001, SATIP-L-350-1) and checklist points.
· Witnessing of cleaning, pre installation, Leveling and alignment, trim installation, internal parts, and external supporting structural installation inspections.
· Witnessing of valves, flange joint, gasket tightening and torquing inspection of bolted flange joint assembly as per SAEP-350.
· Document Reviewing and witnessing of manual bolt torque, hydra tightening and tensioning activities
· Witnessing torquing and tensioning activities as per approved procedure.
· Job Surveillance inspections
· Initiate Log book entry (LBE) note, standard violations, proactive recommendations, Focus Assessments, General comments in the QMIS Quality Systems to improve quality and timely work effectively.
· Attend and participate weekly quality meetings, communication meetings, technical meetings and monthly safety meetings.
· Reviewing and acceptance of quality control work procedures (QCP) for special process activities.
· Attending the weekly progress quality review meeting with contractor.
· Coordinating and attending weekly safety and technical sharing internal staff meetings.
· Witnessing shop fabrication activities and valve calibration activities as per requirement.
· Team plays and coordination with the other departments for smooth flow of project work.
· Witnessing internal and external inspections of equipment and relief valve installation inspections.
· Witnessing and hold points of pre commissioning activities walk through inspections of type a punch points “A” prior to hydrotest and leak test.
· Witnessing and review of hydrotest fluid test certificate, SRB count, corrosion inhibitor and biocide mixing water treatment certificates as per SAES-A-004 and SAES-A-007.
· Witnessing final inspections prior to closure certificate.
· Site walkthrough reinstatement inspection after hydro test.
· Witnessing and ensuring layup activities as per SAES-A-007.
· Final punch point witnessing inspections before MCC.
· Responsibilities include but not limited to organize, implement, conduct and manage the project quality plan of the assigned projects.
· Responsible in establishment and maintaining and effective structured quality plan.
· Ensuring responsibilities of QMS are met through top management.
· Ensure quality plan, organization chart, working personals qualification and special process (quality control procedures) are reviewed and approved by Saudi Aramco as per contract procedure prior to start of work.
· Coordinate with client regarding quality matters.
· Ensure all materials/equipment’s received on site is inspected for compliance in accordance with material vendor approval requests (MVAR)approvals and are proper stored.
· Maintain records of QC activities and make these records available at any time to clients authorized representatives.
· Enforce hold points
· Deal with directly field supervisors to correct identified deficiencies and notify the QC inspector prior to concealment of corrected work.
· Ensure that QMIS is implemented through top management ensuring development and implementation of the QMS and continually improving.
· Ensuring and stick on to all quality deliverables are met as per contract .some quality deliverables are quality plan, organization chart ,personal qualifications, audit schedule, audit report, contractor and sub-contractor NCR, NCR summary, Management review report, Management QMS report(ISO 9001),Evidence of manufacture pre-qualification, inspection status report monthly, inspection assigned package, pre inspection meeting &vendor inspection reports, two week look ahead, final inspection report/shipping release ,inspection disposition report, special process procedures(quality control procedures),inspection and test plan, Hydro test package etc.
· Stick on to QMS system points like purpose, scope, responsibilities, management representative, procedure, management responsibility, resource management, product realization measurement analysis &improvement etc.
· to ensure proper documentation and traceability of corrective action done and addressing of the preventive measures to implement as per SAEP 381 escalation process.
· Giving quality awareness training session seminars to quality team about RFI, QMIS flow process and process methods.
· Attend Quality meetings and progress meetings as required by client representatives and mandated by SAEP -1150. Ensure proper document is being done and filing for all quality issues discussed and raised.
· Ensure to Submit two weekly and monthly updates of construction and procurement to client (Aramco).
· Assist the engineering and procurement department to develop technical specification quarries
· Attend to customer complaints in taking corrective& preventive actions.
Technical inspections
undefinedISO Lead Auditor 2015 ,ASNT level-II