Tamer Ismail Abd El Hamid

Tamer Ismail Abd El Hamid

Jeddah

Summary

-Good communication. -Good analytic presentation skills -Motivated, Dependable a time effective -Understanding cultural difference. -Strong commitment to cooperative teamwork. -Handicap free, and excellent health status. Ready to work in extreme conditions

Overview

24
24
years of professional experience
2003
2003
years of post-secondary education
1
1
Certification

Work history

Precast Factory Manager

Premco-Saudi Bin Laden Group KSA
Jeddah
2019.10 - 2026.04
  • Managing the Precast Segment Tunnel works for the East Sewers Tunnel Project, Jeddah, overseeing production, logistics, and quality control.
  • 1- Telal El Groub housing project at Jeddah (9 floors apartments buildings (27) at Jeddah-KSA full system precast
  • 2- Tahleya underpass tunnel at Jeddah –KSA (precast post-tension girders)
  • 3- Airport housing project at Jeddah (9- floors apartments building (96 buildings) full system precast
  • 4- Islamic Sea port at Jeddah
  • 5- Makkah ring road infrastructures elements and road barriers
  • 6- The holly mosque at Makkah expansion
  • 7- Al Andalos schools at Jeddah
  • 8- Beeban Hotel at Makkah

Precast Factory Manager

Orascom Construction Egypt
Port Said
2016.04 - 2019.10
  • One of the biggest precast factories in Port Said on total area of 17,000 m2 to produce precast to build Port Said three tunnels with total length of 12,000 kilometers as per below: –2 ways tunnels and One railway tunnel
  • PRECAST SEGMENTS FACTORY - PSF
  • Precast Segments Factory (PSF) had been independently established to supply segments lining to TBM where both are managed by Arab Co. & Orascom Construction JV for Port Said Tunnels Project. PSF target is to cover first phase of double tubes tunnels of 2850 complete rings. Port Said tunnelling formation consists of nine segments assembled to form one complete ring.
  • Duties:
  • Plans, organizes, controls, integrates, and monitors work plans to achieve goals and objectives against the annual department's budget.
  • Organizes, directs, and evaluates the performance of assigned staff; establishes performance requirements and personal development targets; regularly Monitors performance and provides coaching for performance improvement and development.
  • Managing of (Tech. office, QC dept., HSE dept., Stores, Batching Plant, Steel factory, Factory HR., Factory Admin., and Factory Procurement)
  • Provides day-to-day leadership and works with staff to ensure a high performance, team building and employee empowerment; applies process improvement and quality management principles to assigned areas of responsibility.
  • Develops recommendations to improve the operating systems and facilities, Coordinates division activities with other divisions, departments and agencies.
  • Research and monitors technical developments in techniques, equipment, supplies and material used in the production.
  • Ensures the HSE program and goals are implemented and carried out in the Production division; develops and proposes safety requirements to be carried out in the division.
  • Supervise the production operation and assure that all work instructions and procedures are strictly followed.
  • Directs towards the development and exploration of new production methods.
  • To ensure that workers are adequately skilled and experienced in following and understanding correct production methods.
  • Make the needed requisition for production material requirements and to ensure that materials are always adequate for the production process.

Precast Production Manager

Saudi Bin Laden Group (Premco)
Jeddah
2010.11 - 2016.04
  • Precast Manager (production, finishing and erection) for:
  • 1- The expansion of the Grand Mosque in Makkah
  • 2- The expansion of the Prophet’s Mosque in Madinah
  • 3-Jeddah international Airport (precast concrete)
  • 4-National Guard housing camp (KSA-Jeddah)
  • 5- Haramain high-speed rail project.
  • 6- Minister of Interior projects
  • 7- King Khalid (ABHA) University
  • 8-The extension of the King Saud University Medical City
  • 9-Red Sea Mall at Jeddah
  • Duties:
  • I am responsible for the general management of the operation with direct responsibilities for Operations and Production Programs along with direct coordination with Business Development, Engineering, Quality, Programs, Procurement, Safety, Research and Development, Sales and Human Resources. This individual will ensure quality and profitability. My role requires effective cross-functional and collaborative teamwork to achieve business results.

Precast Yard Manager

Saudi Bin Laden Group (BAHRA- Branch)
Jeddah
2009.11 - 2010.11
  • 1- Project: Princess Nora University Metro Bridge Precast Viaduct segment and Girders
  • Description: Production manager of 800 precast pre-stressed girders from 26 m up to 42 m
  • Responsibilities:
  • Monitored quality of work and ensured these were in accordance with contract specifications and drawings.
  • Identified / recorded defects; ensured that rectifications were carried out in accordance with agreed procedures.
  • Maintained records of work carried out and ensured that plant and other resources were properly recorded.
  • Ensured that the work was carried out as per approved QA/QC and HSE plans of the project.
  • Responsible for site inspection and handling request for inspection (RFI) for all items.

Precast Projects Manager

Saudi Bin Laden Group (BAHRA- Branch)
Jeddah
2008.10 - 2009.11
  • Projects Handled:
  • 1-King Saud University in JEDDAH (the university buildings and the housing camp)
  • 2-Saudia Air Lines Main Building at JEDDAH
  • 3-The Presidency of Meteorology and Environment (PME) tower in Jeddah (High rise)
  • 4-Jamraat Bridge IN Makkah (the biggest post tension bridge at the Middle East region)
  • 5-2 helipad towers and 4 service towers (Jamaraat Bridge in Makkah)
  • 6- King Abdullah Economic City housing villas and the entrance road bridge

Senior Civil Engineer

Saudi Bin Laden Group (A.B.C.D)
Makkah
2006.06 - 2008.10
  • 3-Project: Jamarat Bridge in MAKKAH K.S.A. Precast (Post-tension Viaduct Segment)
  • Description: The project consists of 4 floors segment bridge. the project starts from Casting the segment outside the site up to erection and finishing the bridge.
  • Responsibilities:
  • Follow up site progress according to plan
  • Follow up the progress of every target
  • Follow up the segment production and erection
  • Co-ordinate with consultants and subcontractors to get the approvals for all individual activities.
  • Deal with various authorities to get the required approvals.
  • Prepare daily work program for site engineers & foreman

Civil Engineer

Saudi Bin Laden Group (A.B.C.D)
Makkah
2006.01 - 2006.06
  • 1- Project: Cut & Cover Tunnel under the Jamaraat Area (Makkah – Saudi Arabia)
  • Description: The project consists of retaining walls and 33m prestressed (I) and the finishing inside the tunnel
  • Responsibilities:
  • Monitor daily manpower, and prepare daily, weekly, and monthly Reports.
  • Plan the work needs and material requirements.
  • Control & analyze program of work schedule and manpower productivity.
  • Controlling & supervising the quality of works (Structural & Finishing).
  • Co-ordinate with the consultant engineers, client, and the subcontractors.
  • Study & evaluate monthly payments

Site Engineer

Saudi Bin Laden Group (B.O.T)
Makkah
2003.10 - 2006.06
  • 2- Project: Fairmont Makkah Clock Royal Tower (Abraj Al Bait Complex) (The highest towers in SAUDI ARABIA)
  • Description: The project consists of 7 high rise towers in Makkah (Construction & interior Finishing)
  • Responsibilities:
  • Review and Update the Project Quality Plan (PQP)
  • Receiving and reviewing the IR from site construction team to check the following:
  • - Latest revision (The IR must be with latest revision).
  • - All materials approved (All materials to be checked and approved). - Issue date and inspection date.
  • Attaching all the supporting documents in coordination with QC Technical Team.
  • Coordinate promptly with the site construction team and DAR representative to carry out the required inspection jointly (Managing IR process with all parties).
  • Following the IR till closer by all concerned parties in SBG and DAR.
  • To follow all site activities on daily basis as well as rectification of the consultant’s Comments till final approval of the IR’s.
  • To ensure that the works are done as per drawings specification and concerned MOS.
  • To assist site construction to solve any type for works that not complying with approved drawings, specifications and concerned MOS.
  • To issue, follow and manage Site Observations (SO) related to any non- conformity process and / or materials.
  • To issue, follow and manage Internal NCR’s (when exist) till final Closer/rectification.
  • To propose corrective and / or preventive actions to be taken in case of any nonconformity works recorded by QC department or project consultant.
  • Attending all Civil Engineering Related meetings. (Q.C. and Construction meetings)
  • Follow Snag List, Testing & Commissioning
  • In this project:
  • Inspecting formworks & steelworks for Cast in-situ walls, Columns, Slabs, Diaphragm Walls, Precast Walls and slabs (Erection & steel rebar & molding & casting & finishing),Cladding ,DT, Stairs , Artificial stone and all civil works.
  • All kinds of Water tightness for Rafts, Walls, and Roof Slabs.

Site Engineer

S.N.F (EGYPT)
2002.09 - 2003.09
  • Description: 150 villas construction and finishing

Education

B.Sc. - Construction and Building Engineering, civil engineering

AASTM
Alexandria Egypt

Skills

  • Computer skills: MS Office Word & Excel, Internet, basic knowledge of AutoCAD
  • Languages: Fluent Arabic & English (Reading, Writing and Speaking)

Certification

OSHA Certificate

Additional Skills

Fluent Arabic & English (Reading, Writing and Speaking)

Precast Specialties Fields

  • Strong experience in the following precast yards management fields:
  • 1- Production of:
  • Precast Viaduct
  • Precast segments for (bridges and tunnels)
  • Precast cladding walls and wall (load) bearing.
  • Precast Pre-stressed girders.
  • Precast slabs (hollow core and DT)
  • Precast (post-tension and pre-tension)
  • Precast columns, beams, footing, manholes, GRC, and all precast elements
  • 2- Construction, establishment and starting of precast factories and assembly of the following utilities:
  • Overhead cranes
  • Gantry cranes
  • Curing system
  • Contraction of stock yards (internal and external)
  • Production lines (tables, moulds, beds etc.)
  • Fabrication Workshops
  • Batching plants
  • 3- Moulds Fabrication with deferent materials like:
  • Steel moulds
  • Wooden moulds
  • Rubber pattern and moulds
  • GRP moulds
  • 4- The semi dry concrete production machines of:
  • Road barriers
  • Drain gutter
  • Manholes
  • Cable ducts
  • Pipes
  • 5- Precast Cost estimation and pricing
  • 6-Lifting, erection and handling of the precast heavy elements (+160T)
  • 7-Precast concrete repairing (cosmetic or defected) and knowledge of all materials and international suppliers like BASF, SIKA, and Ha-Be …etc.
  • 8- Dealing with Overhead cranes, gantry cranes, mobile cranes, and tower cranes.
  • 9- Fire tests for tunnels and metro projects and Concrete admixtures including the required tests.
  • 10- Required tests for viaduct (post-tension or pretension).
  • 11- Pre-stressed materials and equipment like (Freyssinet, OVM,VSL).
  • 12-Precast Concrete mixes and row materials with all required tests.
  • 13- Dealing with the big stock of precast elements at the storage areas and arranging it with deferent systems.
  • 14- Tunneling SDS system.
  • 15- Precast molds suppliers like (Herrenknecht , Freyssinet and Grandin) and knowledge of the maintenance methods of it
  • 16- Coordination with consultant and QC departments
  • 17- Precast Method statements, ITPs, MIRs, submittals and all documents cycles
  • 18-Precast yards safety requirements and precautions
  • 19- Concrete curing systems to reach the required early strength in order to be matching with the requested time schedules
  • 20- Planning of precast yards/factories to issue the required production plans
  • 21- Organizing of the precast yards manpower to reach the maximum productivity with lower cost supervision.
  • 22- Presently, I am the manager of 3 tunnels precast segment yard with Orascom Egypt under SYSTRA supervision.
  • 23-I am the precast lecturer/trainer from ORASCOM Egypt in the Egyptian universities (2 sessions/week)
  • 24-Strong experience in precast procurements and warehouses management and solving the materials issues
  • 25- 14 years of GCC precast experience with the biggest companies and Consultant offices

Timeline

Precast Factory Manager

Premco-Saudi Bin Laden Group KSA
2019.10 - 2026.04

Precast Factory Manager

Orascom Construction Egypt
2016.04 - 2019.10

Precast Production Manager

Saudi Bin Laden Group (Premco)
2010.11 - 2016.04

Precast Yard Manager

Saudi Bin Laden Group (BAHRA- Branch)
2009.11 - 2010.11

Precast Projects Manager

Saudi Bin Laden Group (BAHRA- Branch)
2008.10 - 2009.11

Senior Civil Engineer

Saudi Bin Laden Group (A.B.C.D)
2006.06 - 2008.10

Civil Engineer

Saudi Bin Laden Group (A.B.C.D)
2006.01 - 2006.06

Site Engineer

Saudi Bin Laden Group (B.O.T)
2003.10 - 2006.06

Site Engineer

S.N.F (EGYPT)
2002.09 - 2003.09

B.Sc. - Construction and Building Engineering, civil engineering

AASTM
Tamer Ismail Abd El Hamid