Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic
Thirumani Selvan Rajagopal

Thirumani Selvan Rajagopal

Khamis Mushait,14

Summary

With strong problem-solving abilities, a willingness to learn, and excellent communication skills, well-prepared to contribute to team success and achieve positive results. Eager to take on new challenges and drive organizational objectives forward with dedication and enthusiasm.

Overview

20
20
years of professional experience
1
1
Certification

Work History

Mechanical Site Engineer

ITAL CONSULT
10.2024 - Current

Mechanical Controller

PROGER ENGINEERING AND MANAGEMENT & ITAL CONSULT
12.2014 - 03.2024
  • Quality control on mechanical work/progress
  • Perform the daily inspection based on project specification and international standard
  • Rendered a keen insight to inspect Mechanical Works at Construction Site – HVAC (Chillers, Pumps, AHU, FCU, and Humidifiers.), Plumbing, Firefighting Systems, Fire Suppression Systems, Building Management System, Sewerage Treatment Plants, RO, Irrigation System, Petrol Stations, Centralized Car workshops, Security Systems like Hydraulic Road Blockers and Under Vehicle Inspection systems etc
  • Supervised Mechanical Works Site Inspection Request’s and ensured all operations in line with approved construction drawings, contract documents, and project specifications and used Approved Materials
  • Inspect and witness Start‐up of all Mechanical equipment’s under supervision of manufacturer
  • (Air‐Cooled Chillers, Air Handling Units (AHU, Fan Coil Unit (FCU), VAV, Steam Humidifier, all type of Pumps, Fans etc.)
  • Testing & Commissioning of all Mechanical Equipment’s based on approved method of statement, Inspection checklist and manufacturers recommendations
  • Assistant in dimensional measurement
  • Develop, report and maintaining the communication with all sub-connectors
  • Verification of physical measurement of quantities for indirect labor and contractor’s interim bills
  • Any delay in project schedule immediately giving report to project manager
  • Overseeing the delivery of materials
  • Timely giving response to contractor RFI to witness and verifying the technical inspection also
  • Regularly attending the quality meeting and giving my contribution to resolve the quality issues what occurred in site
  • Closely giving the cooperation with PMT, HSE, Contractor and another department in project implementation
  • Carry out Inspection & Certifying all necessary inspection during the various stages of work as per approved inspection and test plan
  • Initiating the Site inspection, NCR and SDR for any violation in implementation for non-conformance and discrepancy
  • Preparing the punch list
  • Supervising in finishing work also

Mechanical Engineer

AL HABTOOR LEIGHTON GROUP
03.2014 - 09.2014
  • Regular supervision to site, cross check the execution as per the Project specification, standard and shop drawing
  • Review shop drawing prior to submittal for service co-ordination and co-ordination with other construction elements
  • To advice on any impact on services caused by Architectural changes and raise Query to Project Manager and Consultant
  • Using schedule of MEP equipment’s, Co-coordinating with construction team for equipment space, movement requirement and maintenance requirement
  • To assist internally QS and Planning department for update MEP system progress
  • Regular supervision of service installation and confirming that installation going on as per project specification and approved drawings
  • Ensuring that services provisions clearance is provided in time for structure
  • To provide technical advice to construction team
  • Close inspection for MEP contractor installation works
  • Carry out site walks and inspection for service installation, identifying poor quality elements and advise construction team
  • Ensure that MEP site instruction/NCR is closed out
  • Providing Civil and Ceiling clearances according to site progress
  • Attending Meeting with other contractor/consultant/client about site progress and other issues
  • Sub-contractor work-verifying and billing
  • Ensure that Company HSE policies are implemented at site in coordination with HSE department

Plumbing and Firefighting Engineer

ETA-UNISTAR
01.2011 - 01.2014
  • Managing colloquies /Sub- contractors/ Workforce: -
  • Conveying all information on drawings to the work force in a proper manner including training and details produced where required
  • Being responsible for proper inter discipline coordination
  • Directing and communicating my supervisors properly, to make them work hardly against the pressure of the look ahead programs DEADLINES
  • Ensuring that safety rules/regulations are communicated to the workforce and are fully enforced
  • Efficient planning and to ensure optimum utilization of resources i.e
  • Manpower, Materials/equipment, tools/plants and consumables
  • Advising timely on manpower requirement /any anticipated delays to construction manager
  • Quantity estimation of materials/ equipment required at site based on shop drawing produced/ approved
  • Planning and Material arrangements for the early completion of the planned tasks
  • Shaft / Floor (waterproof/tiles) /wall (plastering) /false ceiling clearance to construction manager/ the main contractors
  • Monitoring and comparing weekly actual work progress with project yard stick (man-hours)
  • Ensuring progress and completion of every part of activities/work as per the construction program/ short term look ahead programs/targets and also coordinating with building progress / requirement and clearance are available on time for follow activities
  • Monitoring productivity and compiling relevant information on production rates
  • Ensuring that works are executed only by using approved materials and in accordance with the approved/issued for construction latest revision drawings, project specifications, local regulations, agrees procedures and method statements approved
  • Monitor and control all sub-contractors work closely to ensure quality of the work and also to ensure progress as per requirement
  • Carrying out necessary site inspections at every stage of installation/ progress and ensuring that approvals are obtained on time, in coordination with QA/QC
  • Hands on experience with all Pipes I.E., PEX, PVC, CPVC, PPR - 160, HDPE-315,”, Stainless Steel-8”, Ductile Iron-24”, G.I, M.S Pipes, Thermal Fiberglas/Armaflex Insulations, Fire Stop Applications, And Erection/Installations Of All MEP Equipment’s IE, Pumps, Clarifiers, Heat Exchangers, Boilers, GRP Tanks, Grease/Sand/Oil Interceptor Traps, Manhole Covers, All Types Of Floor Drains, Fire Fighting Installations I.E., Electric Pump, Jacky Pump, NOVEC System, Form System, Black still Pipes, Final Fix Accessories And All Plumbing Consumable Items
  • Installation of sanitary fittings and final inspections
  • Commissioning of plumbing /drainage / Firefighting services
  • Ability to prepare the co-ordination drawings by won/leading a group of draughts men
  • Minimizing wastage of materials and Manpower by Better Coordination at site
  • Proactive coordination with civil contractor/ sub-contractors for effective execution works

Plumbing and Firefighting Engineer

AL HAMAD CONSTRUCTION AND DEVELOPEMENT CO. W.L.L.
01.2008 - 01.2010
  • REEF ISLAND, MANAMA, BAHRAIN
  • About Project: It is a one of the prestigious projects in Bahrain
  • Al Hamad got projects of 8 storey's luxury Residential Apartment 8 No's, 2 Storey's luxury Villa 14 No's, 49 no's ordinary villas and Lagoon Pool 1 No
  • HDPE pipes used for external drainage system
  • Diameter up to 300
  • PEARL TOWER, MANAMA, BAHRAIN
  • About Project: It is a one of the prestigious projects in Bahrain and the tallest building too, which contains 3 residential Towers 54 storey's with basement Levels and 5 Podium
  • Responsibilities: Supervise the plumbing & Firefighting Construction activities
  • Ensuring accuracy of work as per approved drawings, methods & documents
  • Check the quality of work as per approved drawings, method statement, progress and program
  • Forecasting manpower, equipment/plant, materials and other requirements
  • Issuing Inspection request to the consultant after QA/QC Procedures
  • Monitoring & follow –up Structural Sub-Contractors works & Supplies
  • Co-ordinates with other department Engineers and supervisors
  • Strict implementation of construction program
  • Preparation of daily production levels of work
  • Ensuring that latest drawing & approved material are used in the site
  • Controlling wastage and other resources
  • Reporting to senior Mechanical Engineer

Plumbing and firefighting supervisor

SENTHI & CO
01.2005 - 01.2007

Education

B. Tech Mechanical Engineering - Mechanical

JRN Rajasthan Vidyapeeth University,
Rajasthan, India
08-2015

High School Diploma -

Central Ploytechnic College
Chennai, India
05-2005

Skills

  • HVAC systems
  • Engineering design support
  • On-site inspections
  • Technical documentation
  • AutoCAD

Certification

Design MEP Diploma in Heating,Ventilation and Air-Conditioning,

Design MEP Diploma in Firefighting and Plumbing.

Languages

Tamil
Native language
English
Advanced
C1
Hindi
Upper intermediate
B2

Timeline

Mechanical Site Engineer

ITAL CONSULT
10.2024 - Current

Mechanical Controller

PROGER ENGINEERING AND MANAGEMENT & ITAL CONSULT
12.2014 - 03.2024

Mechanical Engineer

AL HABTOOR LEIGHTON GROUP
03.2014 - 09.2014

Plumbing and Firefighting Engineer

ETA-UNISTAR
01.2011 - 01.2014

Plumbing and Firefighting Engineer

AL HAMAD CONSTRUCTION AND DEVELOPEMENT CO. W.L.L.
01.2008 - 01.2010

Plumbing and firefighting supervisor

SENTHI & CO
01.2005 - 01.2007

Design MEP Diploma in Heating,Ventilation and Air-Conditioning,

Design MEP Diploma in Firefighting and Plumbing.

B. Tech Mechanical Engineering - Mechanical

JRN Rajasthan Vidyapeeth University,

High School Diploma -

Central Ploytechnic College
Thirumani Selvan Rajagopal