Summary
Overview
Work history
Education
Skills
Timeline
Generic
TINTO BABY

TINTO BABY

Dammam, Saudi Arabia,Saudi Arabia

Summary

16 Plus years of experience in Low/Medium Voltage switchgear & control gear Engineering, Design, Estimation & Project execution.

Overview

16
16
years of professional experience
4
4
years of post-secondary education

Work history

Engineering Manager

Eaton Arabia
Dammam, Saudi Arabia
08.2023 - 06.2025
  • Ensure that all the engineering outputs and complete design of the running projects are submitted on time, within budget, and in accordance with project specifications, industry standards, and company engineering procedures.
  • Optimize the company’s range of products and ensure its capability to compete and meet the market needs in terms of technical requirements, cost and delivery time.
  • Lead the internal implementation of new products, manage the localization files of the existing products, to ensure that they are industrially efficient and consequently competitive in the market.
  • Identified and resolved technical issues, improving product quality.
  • Developed new process improvements for efficiency increase.
  • Established key performance indicators to measure engineering effectiveness.
  • Optimised resource allocation for maximised project output.

Design Team Leader

Eaton Arabia
Dammam, Saudi Arabia
08.2022 - 07.2023

Review technical proposals and resolving technical issues with
customers/sales in order to prepare clear inputs for engineering activities.

Supervising and guiding associated Design Engineers/Draughtsman for
their support in preparation of detailed engineering drawings.

Senior Design Engineer

Eaton Arabia
Dammam, Saudi Arabia
01.2021 - 07.2022

To validate schematics of Control and Protection systems, MV/LV
switchgear design.

Scrutinizing the design output and reviewing Engineering documentation
and get the drawings approval from the client.

Preparation of compliance statement against specifications/comments
received from customer.

To resolve technical issues with Client by attending meeting with them to
get approval in order to minimize cost & improve profitability of order.

Review of manufacturing drawings before releasing for Production and
checking component details for originating purchase requisition.

Design Engineer

Eaton Arabia
Dammam, Saudi Arabia
08.2015 - 12.2020

Senior Design Engineer

META Switchgear manufacturing Co.
Riyadh
04.2012 - 06.2015
  • Review technical proposals and resolve technical issues with customers/sales to prepare clear inputs for engineering activities.
  • Supervising and guiding Design Engineers/Draughtsman for their support in preparation of detailed engineering drawings.
  • To validate schematics of Control and Protection systems, MV/LV switchgear design.
  • Preparation of compliance statement against specifications/comments received from customer.
  • Review of manufacturing drawings before releasing for Production and checking component details for originating purchase requisition.

Design & Estimation Engineer

Entraco Power Systems Pvt. Ltd.
Nasik
05.2009 - 11.2011
  • Preparation of GA/Sectional drawings in Autocad.
  • Preparation of electrical circuit drawings includes single line diagram, power wiring diagram & control wiring diagram in Autocad.
  • Preparation of bill of materials includes switch gear & other materials.
  • Analyzing & preparation of tender documents.
  • Costing & estimation of switch gear and panels.

Education

B-Tech - Electrical & Electronics Engineering

Al Ameen Engineering College
Calicut, Kerala
01.2005 - 01.2009

Skills

  • LV/MV Switchgear/Controlgear Design & Engineering
  • Eaton
  • ABB
  • Siemens
  • Schneider
  • L&T
  • GE
  • SEL
  • Selection and sizing calculation of switchgear components
  • Circuit Breakers
  • Bus bars
  • Transformers
  • Protection relays
  • CT’s/PT’s
  • Meters
  • International IEC standards IEC-61439-1&2, IEC 62271-1
  • NEMA &ANSI
  • SAUDI ARAMCO &SEC standards/specifications
  • Short circuit Coordination study
  • Schneider Ecodail
  • Eaton Xspider software
  • Eplan, Elecdes, Autocad

Timeline

Engineering Manager

Eaton Arabia
08.2023 - 06.2025

Design Team Leader

Eaton Arabia
08.2022 - 07.2023

Senior Design Engineer

Eaton Arabia
01.2021 - 07.2022

Design Engineer

Eaton Arabia
08.2015 - 12.2020

Senior Design Engineer

META Switchgear manufacturing Co.
04.2012 - 06.2015

Design & Estimation Engineer

Entraco Power Systems Pvt. Ltd.
05.2009 - 11.2011

B-Tech - Electrical & Electronics Engineering

Al Ameen Engineering College
01.2005 - 01.2009
TINTO BABY