Position as a Welding Supervisor / Welding Inspector - QA/QC, Expertise in Quality Control and talent for navigating challenges.
Knowledge in International Codes and Standards.
Strong problem-solving skills and proactive approach to new tasks.
Known for adaptability, creativity, and results-oriented mindset.
Committed to making meaningful contributions and advancing organizational goals.
Projects in NHC-KSA:
1. Project : APOC PDH/UTOS Project (May 2022 - June 2024) Jubail, K.S.A
Position: QA/QC Supervisor
Scope: Fabrication & Erection of Above Ground Storage Tanks, Calibration & Pre-Commissioning.
Contractor: Samsung Engineering.
Owner: Advanced Polyolefins
2. Project : Upgrade Fire Protection and Industrial Drainage System # CRDD Qassim Bulk Plant (Presently working from July 2024) Jubail, K.S.A
Position: QCI Welding & NDT
Scope: Fabrication & Erection of field Piping, Installation of Valves & Pre-Commissioning.
Contractor: New Horizons Company (NHC).
Owner: Saudi Aramco.
3. Project : Hawiyah Unayzah Gas Reservoir Storage Project (May 2021 - May 2022), Hawiyah, K.S.A
Position: QCI Welding.
Scope: Fabrication & Erection of Above Ground Storage Tanks.
Contractor: Samsung Engineering.
Owner: Saudi Aramco.
4. Project : Vacuum Distillation Heater Repair and Maintenance Project (Z09-F-0101) RIYADH REFINERY (Shutdown Jan 2021 - Apr 2021), Riyadh, K.S.A
Position: QC Supervisor.
Scope: Vacuum Distillation heater Dismantling, Fabrication, Erection & Repair works.
Contractor: PETROSAL.
Owner: Saudi Aramco
5. Project : MGSE Phase -II PKG-I, Western Area Pipeline Project (July 2020 to Jan 2020) YNGL. Yanbu K.S.A
Position: QCI Welding.
Scope: Dismantling and Erection of 48" Piping, 6 MOV's & Split-Tee Installation (Hot-Tapping).
Contractor: ARKAD Engineering.
Owner: Saudi Aramco.
Project: Jazan Refinery and Utilities Project (EPC-13) JRUP
Scope: Erection of Piping and Above Ground Storage Tanks.
Contractor: HITACHI
Owner: Saudi ARAMCO
Field Inspection of oil & gas process piping & Above Ground Storage Tanks: Welding Inspector
Project: NGL Recovery Utility & Facilities Project.
Scope: Field Erection of Piping and Installation of Valves, and Pre commissioning.
Contractor: Samsung Engineering Co. Ltd
Owner: Saudi ARAMCO
QC Welding inspector in Shaybah NGL Recovery, Utilities & Facilities Project