Experienced transmission line specialist with over 15 years in the industry, including 6 years in the UAE and 9 years in Saudi Arabia. Proven track record in managing and executing large-scale projects, ensuring compliance with safety standards, and improving operational efficiency. Skilled in project management, team leadership, and technical problem-solving.
Overhead transmission line construction
Neom, Saudi Arabia
Managed the installation of 400kV transmission lines, ensuring project completion within the stipulated time frame and budget., Coordinated with local authorities and stakeholders to ensure seamless project execution.
Sl.No
Name of project
Brief description
1
NEOM Green Hydrogen Project – PM 210012
Period – March 2024 till date
In charge – for OHTL Stringing work – 150 km
2
Construction of 380 KV D/C OHTL from proposed Marjan to 380/230 kV BSP to existing Safaniyah 380/230 kV BSP
AND
Construction of 230kv D/C OHTL Between new Marjan 380/230 kV BSP and Saudi Aramco Tanajib
Period -2021-2024
Site Manager – 29.95 km and 26 Km Total– 172 fnd, T.G.Assembly, T.Erection & Stringing works and for MAFTL – shutdown works.
3
Construction of 132 Kv DC OHTL from Rawaq S/s 8841-9032 in Qassim Area
Period – 2020-2021
Site Manager – Line Length- 10.23 km -40 Pile fnd. , T.G.Assembly, T.Erection & Stringing.
4
Construction of 132kv DC OHTL From Al-Arthaiwah S/s to BSP S/s 9064 in Qassim area.
AND
Connection of New Zulfi BSP S/s 9064 with 132kv Network in Qassim Area
Period – 2019 - 2021
Civil Site Manager – Line length – 67.01 km & 16.8 km -206 & 54 Pile and P&C Foundation, T. G.assembly & T. Erection works, Stringing works.
5
Construction of Two 132 KV DC OHL for Al-Badaya S/S 8851 in Qassim Area AND
Construction of 132KV DC OHL From Al-Rass S/s 8846 up to S/s 9025 in Al -Rass Area
Period – 2018-2019
Civil Site Manager – Line length – 21 km - 65 Foundation , T. G.assembly & T. Erection works, Stringing works
6
Construction of 132KV DC OHTL Al-Qaid S/S 8925 – BSP 9031- Hail –KSA
Period – 2017 -2018
Senior Engineer – Line Length – 16.86 Km-57 Foundation, T.G. Assembly & T.Erection works.
7
Reinforcement Construction of 132 Kv DC OHTL 8860-9029 in Qassim Area.- KSA
Period – 2015 -2016
Senior Engineer - 24 Foundation, T.G.Assembly & T.Erection works.
8
Lot 2.1 - 220kV OHL(400 kV DESIGN) Bab 2 G/S, Bab to ASAB2 Switching station and Related Modification works at ABA2 G/S (Contract No. N11443-Transco)
Period -2013 -2015
Senior Civil Engineer- Line length – 86.22 km -192 Foundation , T.G. Assembly & T. Erection works
9
33KV OHL at Qusahwira oil field & Habshan (ADCO Contract no; 9063) – UAE
Period -2011 -2012
Senior Civil Engineer- Line length – 19.33 km -104 Foundation , T.G. Assembly & T. Erection works
10
400kV OHL Fujairah to Ras Al Khaimah (TRANSCO Contract No: N6318) – UAE
Period – 2010 -2011
Civil Engineer – Line Length – 35 km (Portion 1 ) – pile and Pad & chimney foundation
11
220kV OHL Qusahwira.
(TRANSCO Contract No: N6318 VO 4) – UAE
Period -2010 -2010
Civil site engineer –Line Length – 15.4 km - 40 foundation.
12
33 kV OHTL Network in Western Region
(ADWEA Contract No. D 7057A) – UAE
Period -2008 to 2010
Civil Site Engineer – 182 Location – Pile Foundation.- Line Length- 45 km
13
Hospital, hostel, residential Building construction –M/s shiraz constructions.
(Mysore ) – Karnataka
Period – 2004 – MAY 2008
Asst.Civil Engr. AND
Materials & account coordinator.
Pursuing -Btech in Civil engineering.
Played as a captain in School & collage and in our company team.