Summary
Overview
Work History
Education
Skills
Affiliations
Additional Information
Software
Certification
Timeline
Generic

YASEEN KHAN

Mechanical Engineer
Riyadh

Summary

Accomplished Mechanical Engineer offering 7-years background in mechanical services HVAC,Fire Fighting & Plumbing system design & on site supervision in terms of management & execution of the project. Expertise in developing environmental controls, fire suppression and public health for Residential & Commercial buildings. Exceptional success in teaming on complex, high-dollar, high-profile projects.

Overview

7
7
years of professional experience
4
4
Certifications
3
3
Languages

Work History

Mechanical Engineer

FCC Electromechanical LLC
05.2017 - Current
  • Monitor the works at site and execute as per approved method statement,
  • Shop drawings and as per the client requirement
  • Preparing estimation & quantity take-off from preliminary drawings, and planned designs and responsible for material request & materials follow up
  • Prepare Project scheduling, allocation of works to various teams, labour groups & Subcontractors
  • Responsible for scheduling and cross tracking progress of multi-discipline building service systems which includes (but not limited to): HVAC system, FF (Fire protection systems) & Public Health systems
  • Forecasting, monitor and manage potential risks that can negatively impact the successful completion of project
  • Ensuring overall engineering project compliance with applicable Codes, standards, and regulations
  • Working with internal groups (such as Operations, Inspection, Engineering, HSE, etc.) on front-end project definition
  • Assisting project engineer in generate mechanical deliverables which includes (but not limited to): mechanical systems layout drawings, data sheets, equipment sizing calculations & selection, engineering work packages, purchase specifications
  • Assigning targets for accomplishments and ensure targets are met on daily basis for all mechanical groups at the site
  • Submits site daily reports, inspection requests, estimates and all applicable monitoring reports on a regular basis
  • Carrying out all Mechanical Works and equipment's installation activities
  • Performing the startup of equipment’s & conducting testing commissioning of all HVAC, & Fire protection equipment’s
  • Responsible for the TAB works of Air balancing & Water balancing
  • Attends regular meetings with the consultant to provide an update on project progress
  • Reviewing sub-contractor proposal in-lined with the required works and verifying the specified works
  • Preparing As-built drawings & assists the design team for updating in shop drawings
  • Directly responsible for the safety of all Mechanical groups’ personnel of the project by ensuring that the project execution will be done according to all applicable health, safety, sanitary and environmental standards.

Baalbek international Construction
01.2016 - 01.2017
  • Projects
  • Orchid Center
  • TSC signature
  • Responsibilities
  • Carry out day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors
  • Preparing shop drawings using AUTO CAD from schematic & design drawings_ & getting approval from the client
  • Preparing estimates, material submittals as per the speciation’s of the project
  • Defining the sub-contractor scope of works & inspecting works upon completion & approving bills of the subcontractor
  • Performing the startup & air balancing of HVAC systems of Ductable Split & Package type units
  • Preparing the progress report, conducting inspection with the client on site.

02.2015 - 11.2015
  • Responsible for the Installation of Kitchen exhaust systems & Ventilation system for small industrial applications
  • Preparation & fabrication of G.I ductwork as per SMACNA standard.

Education

Bachelor of Engineering - Mechanical Engineering

Muffakham Jah College of Engineering and Technology, Osmania University

Intermediate - undefined

Sri Chaitanya Junior College

SSC_High School -

Dew Drop High School,
Hyderabad,INDIA

Skills

E20-II HAP software platform

HVAC system design

Bill of Material (BOM)

AutoCAD

Microsoft Office Suite

Risk Assessment

HVAC Fire Protection & Plumbing system Design & Drafting

On-site inspections

Project Management

Affiliations

Diploma of Design & Drafting in HVAC , Fire Protection &Plumbing system IOSH Managing Safety – UK Lifting Supervisor Saudi Council of Engineers Software’s known AutoCAD Microsoft Office Heat load calculation-HAP CATIA REVIT-MEP Pipe & Duct Sizing International Standard & Codes Well versed with ASHRAE & SMACNA Standards Well versed NFPA & IPC

Additional Information

International Standard & Codes

· Well versed with ASHRAE & SMACNA Standards

· Well versed NFPA & IPC

Software

AUTOCAD

REVIT_MEP

HAP E20

McQuay_Pipe & Duct Sizer

ANSYS

Microsoft office Suite

Certification

IOSH WORKING SAFELY

Timeline

SAUDI COUNCIL OF ENGINEERS

12-2021

LIFTING SUPERVISOR

02-2018

IOSH WORKING SAFELY

11-2017

Mechanical Engineer

FCC Electromechanical LLC
05.2017 - Current

Baalbek international Construction
01.2016 - 01.2017

MEP DIPLOMA

05-2015

02.2015 - 11.2015

Bachelor of Engineering - Mechanical Engineering

Muffakham Jah College of Engineering and Technology, Osmania University

Intermediate - undefined

Sri Chaitanya Junior College

SSC_High School -

Dew Drop High School,
YASEEN KHANMechanical Engineer