Yasir Saifullah

Summary

Project Controller & EHS manager at seder Summary I have played different leadership roles in numerous project rollouts during the course of my working experience. Having strong analysis and problem-solving skills. Decisive, results-focused. Passionate about empowerment and mentoring - building effective teams using positive motivation, clear expectations, documented processes and objective performance measurement My goal is to secure a promising position in international telecom industry that offers both a challenging opportunity in project management of TE/Turnkey/Swap projects of most advance telecom wireless technologies (UMTS, WCDMA, LTE, 5G Etc.), Transmission and a healthy working environment.

Overview

9
9
years of professional experience

Work History

Saudi
01.2020
  • Project/ Legacy Migration
  • Saudi Zain Sophia Phase-01/ Phase-02 /Phase 2.2/ 4G Enhancement Project 2021
  • Arranging and providing technical Support to the teams in field for MW and BSS sites projects under STC and Zain
  • Following up with Huawei PAT coordinator to make PAT target in time and making quality of sites as per standard
  • Arranging training sessions for field teams on EHS and QA
  • Well experienced on BTS 3900
  • 3900A, DBS3900, 3012, 3812, 3900L
  • For MW RTN910, RTN950, RTN980, RTN310 and 950A
  • Coordination with Transmission Back Office (BOTX) to provide timely support to the teams for long pending and problematic transmission issues
  • Maintaining trackers of progress
  • Managing resource to keep region stable
  • Managing resource to maintain customer KPIs by Implementing site on time
  • Coordination with customer for daily reporting based on network analysis
  • Coordination with 3rd party vendor to resolve problematic issues in network by arranging JVs
  • Arranging spot check/Audit for teams in field to make sure teams are following EHS and QA
  • Resource Management, Time Management, Maintaining the Project Tracker, PO Record, DN Record, MR Record, Customer Satisfaction, Completion, PAC and FAC
  • STC NOC MS Project

Project Implementation/Rollout & EHS Manager

KSA
01.2021 - Current

RTTS
04.2020 - 12.2020
  • Working on OWS
  • Working on U2020
  • Dispatch the WO
  • Dispatch the TT
  • Close the WO
  • Fallow with team for close the TT in SLA
  • Technically Support the team in field
  • Huawei-Zain MS Project (Central Region)

Field Maintenance Engineer

10.2016 - 03.2020
  • 2G/3G/LTE(TDD/FDD) Huawei (BTS5900, BTS3900,), Huawei RTN (380,310,910,950 &980, e-band) for Zain MS project
  • 24/7 availability in case of major or critical faults or upgrades
  • Configuration and troubleshooting of Huawei BTS (BTS5900, BTS3900)
  • Responsible for O&M functions, integration coming of all BTS sites(2g/3g/LTE/5G)
  • Configuration and troubleshooting of Huawei eNodeB LTE/TDD/FDD sites
  • Perform the RFC of MW
  • Perform the RFC of Gpon
  • Installation & troubleshooting of ATN905/910
  • Configuration and troubleshooting of external alarms
  • Upgrading NodeB software
  • PAT activity for new hardware
  • NMS visibility for new and running sites
  • CMR &PMR for the sites
  • ZAIN Reloaded FTK Project

10.2015 - 09.2016
  • Installation of Rollout sites
  • Installation of RF antennas Huawei and Kathrin antennas
  • Installation of TMA 2100 and 1800
  • Installation of RRU 900,1800,2100MHZ
  • Configuration of SMU and verification of alarms
  • Rectification of site and make it ready for PAT
  • Configuration and troubleshooting of site
  • Clearance of VSWR alarms
  • Integration of BBU3900
  • Installation of WBBP, LMPT, LBBP, UBRI, UBBP, UMPT, UPEU
  • Installation of GRFU900, MRFU1800, WRFU2100
  • Look after the site installation and quality work

Project Coordinator, ENGINEER

Relacom, Turnotech
09.2014 - 06.2015
  • Organizing and managing Installation teams
  • Follow up & lead teams to complete all 4G project tasks
  • Install Huawei LTE equipment
  • Make action plans to complete work schedule as agreed with Warid
  • Assisting and supporting the Project Manager in their daily duties
  • Communicating with project manager to report on project status
  • Complete and review all technical reports from teams before submitting it to the customer
  • Reviewing the efficiency and effectiveness of service delivery
  • Assist as well as track project activities with project teams and client and update action item registers, weekly reports, and schedules as required
  • Ensure that functional team members and customer are promptly informed of scope changes and schedule changes
  • HUAWEI 4G AND TRANSMISSION (Installation):
  • Supervise the installation of LTE 4G Outdoor and /Indoor equipment such as GSM Antenna, Feeder Cable, RRU Fiber
  • Cable, RRU Power Cable Installation, GPS Installation
  • Microwave IDU Installation
  • Microwave Antenna Installation
  • Microwave ODU, 7 G (L+H), 13 G (L+H), 23 G (L+H), 38 G (L+H)) Installation
  • Microwave Alignment to get the required SNR
  • TSSR and LOS for Huawei Microwave Links
  • Configuration of Huawei RTN910, RTN950 and RTN980 using Web LCT for 1+0 Link, 1+0 XPIC link, 2+0 XPIC Link on
  • 0.3m,0.6m,0.9m and 1.2m MW
  • BSS and Tx

09.2013 - 08.2014
  • Month)
  • Ufone, Mobilink
  • Ufone Project
  • BTS swap with Huawei BTS 3900A and DBS 3900A
  • Trx Expansion
  • Alarm Patching
  • Media patching
  • Performed Pre- Pat and ATP
  • ATP with customer
  • Battery Bank Installation
  • RTN Links installation & commissioning using WebLCT (U2000)
  • Links of 1+1 2+0 ,4+0 and 1+0 and XPIC
  • (commissioning)
  • Microwave cutover (media shifting)
  • Troubleshooting of more than 50 sites (Huawei rectifier alarms patching as well)

Education

3rd party work at height certificate from mind merge 3rd party basic first aid certificate from mind merge 3rd party basic electrical certificate from mind merge -

BS - undefined

TELECOM Superior University
2012

IGC - undefined

BESI PVT LTD institute
2008

Matriculation (Sc) B.I.S.E - undefined

ICS B.I.S.E
2006

Skills

  • Married Status:
  • Married
  • Address : H 163 St 1Shaheen Colony Walton road LHR cantt
  • Nationality : Pakistani

Timeline

Project Implementation/Rollout & EHS Manager

KSA
01.2021 - Current

RTTS
04.2020 - 12.2020

Saudi
01.2020

Field Maintenance Engineer

10.2016 - 03.2020

10.2015 - 09.2016

Project Coordinator, ENGINEER

Relacom, Turnotech
09.2014 - 06.2015

09.2013 - 08.2014

3rd party work at height certificate from mind merge 3rd party basic first aid certificate from mind merge 3rd party basic electrical certificate from mind merge -

BS - undefined

TELECOM Superior University

IGC - undefined

BESI PVT LTD institute

Matriculation (Sc) B.I.S.E - undefined

ICS B.I.S.E
Yasir Saifullah