Over 22 years of experience in power generation and water pump stations, specializing in simple cycle, solar, and thermal power plants. Proven expertise in civil and electrical engineering across subcontractor, main contractor, and EPC main contractor roles. Demonstrated ability to deliver projects on time, even under tight schedules. Strong track record of managing complex projects in diverse company environments.

Overview

23
23
years of professional experience
5
5
years of post-secondary education

Work history

Pump Station Mechanical Manager

RTCC-Al Rashid Trading & Contracting Company
NEOM WTS /Jubail Eastern Province WTS/Shuqaiq WTS, Saudi Arabia
03.2019 - Current
  • Executed installation of pumps and surge vessels, ensuring compliance with specifications.
  • Fabricated and installed station piping, including valves , dismantle joint , isolation joint , piping support.
  • Conducted hydrostatic testing for all piping systems to validate integrity.
  • Installed cooling water system with both open and closed loops and from chiller to VSD , enhancing operational efficiency.
  • Implemented air compressor system piping from skid to surge vessel, optimizing performance.
  • Managed utilities services within the station, including drainage and water supply systems.
  • HVAC & FF installation .
  • Service air installation inside pump room.
  • Prepared procurement orders for local materials.
  • Set performance targets for construction workforce, ensuring motivation and continuous monitoring.
  • Conducted daily site meeting in order to distribute the activities and arrange resources distribution for next day to enhance team coordination.
  • Conducted weekly subcontractor meeting to track subcontractor progress and resolve issues.
  • Coordinate with Civil & Elect in daily basis.
  • Implement all safety precaution during installation by follow PTW procedure.
  • Coordinate with procurement team for long lead items through weekly procurement meeting and prepare procurement priority list that required to achieve the project schedule .
  • Coordinate with design team through weekly design meeting prepare design priority list that required to achieve the project schedule.
  • Prepare MST method of statement that required to cover all mechanical activities .
  • Prepare lifting plan that required to cover all mechanical activities .
  • Select the suitable crane for each lifting.
  • Prepare construability plan for all mechanical work.
  • Implement all safety precaution during installation by follow PTW procedure.
  • Close out punch list especially with Category A .
  • Follow LOTO procedure during close out punch list B,C .

Site Manager ( Solar Power Plant)

Greencells – Suninfinite JV
Benban , Aswan,, Egypt
06.2018 - 02.2019
  • Delivered execution of two plots, each generating 50MW, while adhering to timelines for civil and mechanical and Elect tasks.
  • Conducted mobilization and demobilization of office and storage areas efficiently.
  • Led daily and weekly construction meetings to enhance team coordination.
  • Set performance targets for construction workforce, ensuring motivation and continuous monitoring.
  • Controlled all project resources, both manpower and equipment, throughout project lifecycle.
  • Worked closely with procurement team to create a priority list for essential materials.
  • Engaged design team in weekly discussions to align on priority designs necessary for schedule compliance.
  • Managed closure of all non-conformance reports with quality control, finalizing construction phase per ITP.
  • Managed closure of ECC and TOP with quality control team.
  • Managed closure of PTW implementation in site activities with HSE team.

Site Manager (CCGT Power Plant ) Fast Track

Leaders in Energy & Electromechanical Development
Burulus CCGT Power Plant 4800mw SIEMENS SGT5-8000H, Egypt
12.2016 - 05.2018
  • Delivered execution of one module 1200MW include two gas turbine and two HRSG and pipe rack and one steam turbine while adhering to timelines for mechanical and Elect tasks.
  • Conducted mobilization and demobilization of office and storage areas & stack preassembly area & air intake preassembly area and piping & support prefabrication area efficiently.
  • Led daily site meeting in the end of every working day in order to arrange resources distribution (welder , equipment's, materials transfers to site , scaffolding ) for next day to enhance team coordination.
  • Set performance targets for construction workforce, ensuring motivation and continuous monitoring.
  • Controlled all project resources, both manpower and equipment, throughout project lifecycle.
  • Engaged with commissioning team to finish system by system according to commissioning priority list.
  • Prepare all required report for client or PM .
  • Worked closely with procurement team to create a priority list for essential materials.
  • Managed closure of all non-conformance reports with quality control, finalizing construction phase per ITP.
  • Managed closure with construction team to close out all punch list category A,B,C especially A should be close out before submit TOP.
  • Managed closure with construction team to implement LOTO system during close out punch list category B,C.
  • Managed closure of ECC and TOP to be submitted with quality control team.
  • Managed closure of PTW implementation during site activities with HSE team.

Mechanical Manager (CCGT Power Plant)Fast Track

Electric Power System Company PSP
BeinSuef CCGT Power Plant 4800MW SIEMENS SGT5-8000, Egypt
03.2016 - 12.2016
  • Delivered execution of two gas turbine .
  • Manage subcontractor mobilization and demobilization of office and storage areas & stack preassembly area & air intake preassembly area and piping & support prefabrication area efficiently and review subcontractor organization chart and manpower's and equipment's histogram during project life cycle.
  • Conducted daily site meeting in the end of each working day with subcontractor in order to arrange resources distribution (welder , equipment's, materials transfers to site , scaffolding ) for next day to enhance team coordination.
  • Conducted weekly subcontractor meeting to track subcontractor progress and resolve issues.
  • Review and approved subcontractor invoice for payment process.
  • Set performance targets for construction workforce, ensuring motivation and continuous monitoring.
  • Mentoring and control subcontractor resources, both manpower (direct & indirect)and equipment, throughout project lifecycle and compared with manpower and equipment histogram.
  • Coordinate with civil team for all foundations clarence.
  • Work with subcontractor for heavy crane selection for stack final assembly and air intake part.
  • Engaged with commissioning team to finish system by system according to commissioning priority list.
  • Prepare all required report to SM.
  • Closure with construction team to close out all punch list category A,B,C especially A should be close out before submit TOP.
  • Managed closure with subcontractor team to implement LOTO system during close out punch list category B,C.
  • Managed closure of ECC and TOP to be submitted with quality control team.
  • Managed closure of PTW implementation during site activities with HSE team.

Site Manager (Simple Cycle Power Plant)

Saudi Services for Electro Mechanic Works Co. SSEM
RAFHA POWER PLANT # 2 SIEMENS SGT6-2000E 67MW, SAUIDA ARABIA
10.2014 - 02.2016
  • Executed one gas turbine project with BOP, meeting all civil and mechanical timelines.
  • Facilitated daily site meetings to coordinate resource distribution.
  • Conducted weekly meetings to monitor progress and address challenges.
  • Reviewed and approved subcontractor invoices for timely payment processing.
  • Managed efficient mobilization and demobilization of office and storage areas.
  • Established performance targets for construction workforce, ensuring ongoing motivation.
  • Oversaw all project resources throughout lifecycle, maintaining optimal manpower and equipment levels.
  • Worked closely with design team to priorities essential design requirements.
  • Worked closely with procurement team to create a priority list for essential materials.
  • Managed closure of all non-conformance reports with quality control, finalizing construction phase per ITP.
  • Managed closure with construction team to close out all punch list category A,B,C especially A should be close out before submit TOP.
  • Managed closure with construction team to implement LOTO system during close out punch list category B,C.
  • Managed closure of ECC and TOP to be submitted with quality control team.
  • Managed closure of PTW implementation during site activities with HSE team.

Deputy Site Manager (CCGT Power Plant)

SEPCOIII Consortium GENERAL ELECT.
Giza North CCGT Power Plant 2250MW GE FRAME 9FA, EGYPT
08.2013 - 10.2014

Mechanical Manager (CCGT Power Plant)

SEPCOIII Consortium GENERAL ELECT
Giza North CCGT Power Plant 2250MW.GE FRAME 9FA, EGYPT
02.2012 - 08.2013

Mechanical Manager (Simple Cycle)Fast Track

MEGA for construction and industries
Damitte Simple Cycle Power Plant 500MW GE 9E, EGYPT
01.2011 - 09.2011

Piping Engineer (Thermal Power Plant)

INITEC ENERGIA. SPAIN
Cairo west & El Tebbin Thermal Power Plant, EGYPT
11.2008 - 01.2011

Site Engineer (Simple Cycle Power Plant)

Seagull for General Contracting and Supply
TEMA OSONOR POWER PLANT (TT1PP) 9E, GHANA
12.2007 - 11.2008

Site Manager (CCGP Power Plant)

Seagull for General Contracting and Supply
New Kureimat / New Talkha Combined Power Plant, EGYPT
11.2005 - 09.2006

Site & Coordinator Engineer

DSD (feromatalico)
CAIRO, EGYPT
11.2004 - 11.2005

Fabrication & coordinator Engineer

Notional steel fabrication company (NSF)
CAIRO, EGYPT
10.2003 - 11.2004

Fabrication Engineer

German Engineering industrial
CAIRO , EGYPT
06.2002 - 10.2003

Education

Bachelor of Engineering - Mechanical

HELWAN UNIVERSITY , EGYPT
02.1997 - 05.2002

Skills

■ Strong leadership and decision-making skills, with the ability to manage teams and subcontractors effectively

■ Client satisfaction skills & extensive experience with the needs of a diverse clientele

■ Excellent project management skills, including the ability to manage budgets, schedules, and resources Very conscientious about meeting deadlines and completing tasks unsupervised

■ Strong analytical skills and the ability to communicate to all levels of the company

■ Fit-for-purpose approach to my work

■ Mobility and ability to work under pressure

■ Strong communication and interpersonal skills for effective

■coordination with project stakeholders

■Problem-solving skills, with the ability to address challenges quickly and efficiently

Timeline

Pump Station Mechanical Manager - RTCC-Al Rashid Trading & Contracting Company
03.2019 - Current
Site Manager ( Solar Power Plant) - Greencells – Suninfinite JV
06.2018 - 02.2019
Site Manager (CCGT Power Plant ) Fast Track - Leaders in Energy & Electromechanical Development
12.2016 - 05.2018
Mechanical Manager (CCGT Power Plant)Fast Track - Electric Power System Company PSP
03.2016 - 12.2016
Site Manager (Simple Cycle Power Plant) - Saudi Services for Electro Mechanic Works Co. SSEM
10.2014 - 02.2016
Deputy Site Manager (CCGT Power Plant) - SEPCOIII Consortium GENERAL ELECT.
08.2013 - 10.2014
Mechanical Manager (CCGT Power Plant) - SEPCOIII Consortium GENERAL ELECT
02.2012 - 08.2013
Mechanical Manager (Simple Cycle)Fast Track - MEGA for construction and industries
01.2011 - 09.2011
Piping Engineer (Thermal Power Plant) - INITEC ENERGIA. SPAIN
11.2008 - 01.2011
Site Engineer (Simple Cycle Power Plant) - Seagull for General Contracting and Supply
12.2007 - 11.2008
Site Manager (CCGP Power Plant) - Seagull for General Contracting and Supply
11.2005 - 09.2006
Site & Coordinator Engineer - DSD (feromatalico)
11.2004 - 11.2005
Fabrication & coordinator Engineer - Notional steel fabrication company (NSF)
10.2003 - 11.2004
Fabrication Engineer - German Engineering industrial
06.2002 - 10.2003
HELWAN UNIVERSITY - Bachelor of Engineering, Mechanical
02.1997 - 05.2002

Work availability

Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
morning
afternoon
evening
swipe to browse
YOUSSEFV NADER