AutoCad

- Mechanical Systems Design (HVAC, Plumbing, Firefighting, Irrigation, Swimming Pools, Medical gases) , Wide experience for lage and mega projects
- Supervise, monitor, and inspect contractor’s installation,
testing, commissioning, and operation of all mechanical and MEP systems besides guiding subordinates
and site inspectors. Attend site progress & technical coordination meetings. Analyze and review
contractor’s shop drawings, as-built drawings, materials submittals, method statement, payment
certificates, requests for information, and track daily progress reports among others. Collaborate with
higher management in expediting critical aspects of site development and technical issues.
Key Projects :
- Al Jawhara Mall (The Village) - Commercial and entertainment mall
104,000.00 m2 Site area & 208,000.00 m2 Building area
(Complete Mechanical Design - HVAC, Plumbing and Fire Fighting)
- Thakher Makkah Mall- Commercial and entertainment mall
320,000.00 m2 Site area & 120,000.00 m2 Building area
(Complete Mechanical Design - HVAC, Plumbing, Fire Fighting and Irrigation)
- GOSI Headquarters’ Towers - Riyadh - Saudi Arabia - High Rise Two Towers
(Mechanical Supervision - 3 Years Project & Project Closing Stage)
- Al-Jammaz Plaza, Riyadh ,SA
(Complete Mechanical Design - HVAC, Plumbing, Fire Fighting and Irrigation)
- Al-Yarmouk Plaza, Riyadh ,SA
(Supervision)
Key Projects :
- TOYOTA Showroom - Smouha, Alex, Egypt
(HVAC and Fire Fighting Installation)
- Air Liquid Co.'s Dikhila Site - Alex, Egypt
(HVAC, Plumbing and Fire Fighting Installation & Mechanical Supplies)
- MUBARAK Technology City - Alex, Egypt
(Mechanical Maintenance Contract)
Key Projects :
(Fire Fighting System Design
- Mövenpick Hotel – Riyadh – Saudi Arabia
- El Anoud tower – Riyadh – Saudi Arabia
- El-Towik Residential compound – Riyadh – Saudi Arabia
- Al-Haram Showroom - Riyadh - Saudi Arabia
- Soliman Al-Habib Hospital
- King Saud University - Social Building
Key Projects:
- Hilton Hotel (King’s Ranch) - Hotel and Resort – Alexandria - Egypt
(Mechanical systems Design HVAC, Fire Fighting, Plumbing and Swimming pools and Supervision)
- Train stations and Maintenance hangers – Doha - Qatar
(HVAC Design)
- SIDI Gaber Train Station - Alex, Egypt
(HVAC and Fire Fighting Design and Supervision)
- CITY Light Compound and carrefour market - Alex, Egypt
(HVAC and Fire Fighting Design and Supervision)
Mechanical Systems Design
undefinedPMP
Experience is in design & supervision of HVAC, Firefighting, Swimming pools, Central heating system and Plumbing which include the following:
➢ Cooling and Heating Load Calculation at HAP Program.
➢ Duct & Piping Design Calculations.
➢ System Design using Auto CAD & AC Equipment selections.
➢ Split unit direct expansion coil (evaporator and condenser) design (using Hysis Program).
➢ Medical Gas system, Calculation & design.
➢ Design of Chiller plants & Cooling Tower plants.
➢ Plumbing system design (Drainage & water supply) & B.O.Q Preparation.
➢ Irrigation system design and Calculations.
➢ Firefighting design (Sprinklers no. And distribution & Pipe sizing & FHC and Pump Selection).
➢ Hydraulic calculations preparation by Elite software.
➢ Swimming pool & Machinery Room Design (Hot – Cold).
➢ Bill of Quantities preparation (B.O.Q – Arabic & English) in Excel File form.
➢ Preparation of Technical Specifications for mentioned systems.
AutoCad
Hourly Analysis Program
Microsoft Office
Elite (Hydraulic Calculations)
AC McQuay Group
Sports
Reading
Swimming
PMP
Master of Engineering
TOEFL