Professional Summary. :-Chartered engineer civil with certify project management professional (PMP) having 24+ years’ experience (India 21+ years, and 3+ year’s abroad experience in Metro Rail ).Project feasibility studies report studies, ,Methodology Review for Railway depot and track, Civil, MEP, utilities, Steel Structure building,
Embedded Rail system, Embedded Block rail system for track rail, In metro rail Depot at grade,& elevated depot.
constructing , Design phase Construction phase in bridges, highway ,Metro Rail. Overlook& Evaluate the contractors prequlification,establish& Implementing of project plan. Review the contractor shop drawings or compliance & integration with exhibition design,& third party stakeholder. Overlook contractors off site production.
Skilled in the inspection & reporting of construction progress, monitoring & recording the issue & defect, incident investigation ,Planning of works.
Elevated Viaduct, superstructure substructure. Precast yard for elevated bridge segments, pretension box and u shape girders. Elevated metro rail station, depot and track. Extra dossed bridge, balance cantilever bridge with precast and cast in situ method. Expertise in pre-stressing ,pretension & post tension girder, Box, U, I shape Girders, Long line & short line method for bridge segment & girders. Steel Structure bridge with composite Metal decking.
Project:-Trojena project Management Consultancy (PMC ) service Contract -In Kingdom
Role and Responsibilities:
Project:- Quality and safety audit consultancy (QSAC) service for Sahnewal- Khurja Section with khurja Dadri link of Eastern Dedicated Fright Corridor ,RM 440 KM single track.
Role and Responsibilities:
Project :- General engineering consultant Ahmedabad Metro rail project Consortium SYSTRA-RITES-OCG-AECOM.
Role and Responsibilities:
Project::- Riyadh Metro transit consultant .Project management and Construction management service Riyadh metro line 1,2 and 3. Consortium of Parson- Systra - Egis rail.
Role and Responsibility
Project :-.Civil Contract, Development of Metro link from Sikanderpur station to sector 56.in Gurgaon. A network of 7 km along Golf course road connecting Sector 55-56 to Delhi Metro at Sikanderpur in Phase –II. Including five elevated station & Depot
Project:- Gurgaon Metro Rail Project 6.1km-long rapid rail route that will connect Sikanderpur on Delhi Metro Line 2 (DMRC) with the DLF Cyber City region in Gurgaon near Haryana
Role and responsibilties.
Project :-
1.Civil Contract, Development of Metro link from Sikanderpur station to sector 56.in Gurgaon. A network of 7 km along Golf course road connecting Sector 55-56 to Delhi Metro at Sikanderpur in Phase –II. Including five elevated station & Depot
2.Gurgaon Metro Rail Project 6.1km-long rapid rail route that will connect Sikanderpur on Delhi Metro
Line 2 (DMRC) with the DLF Cyber City region in Gurgaon near Haryana
Project :- Part Design and construction of elevated viaduct from Jungpura flyover to Okhla (7.6 Km) including seven nos. elevated stations viz. Lajpat Nagar, Moolchand, Kailash Colony, Nehru Place, Kalkaji Mandir, Govindpuri and Okhla. On Central Sectary ate to Badarpur Elevated DMRC Line 3
Role and Responblites:-
Project:-· 2B + G + 24 floor office building on plot no (106) 30, main structure Building, Piling and shoring.
Role and Responsibilities:-
Project :- Part Design and construction of elevated viaduct from Jungpura flyover to Okhla (7.6 Km) including seven nos. elevated stations viz. Lajpat Nagar, Moolchand, Kailash Colony, Nehru Place, Kalkaji Mandir, Govindpuri and Okhla. On Central Sectary ate to Badarpur Elevated DMRC Line 3.
Project:- Part Design & construction of elevated viaduct from New Ashoak Nagar, Noida Corridor including Six, Elevated Stations. Viaduct form Noida sector15, 16, 18, Botanical Garden, Golf course and City Centre.
Project:- Construction of elevated viaduct Delhi Metro Rail RC 3C23,(Elevated Viaduct) DMRC Barakhamba- Indraprastha section 3.0 Km.
Project :- Construction of elevated viaduct Delhi Metro Rail RC 3C23, (Elevated Viaduct) DMRC Tilk Nagar to Dwarika moarh, Section 6.0 KM.
Project :-Construction of Elevated Viaduct (Lot-1 & Lot -11) Trinagar to Rithala, New Delhi, 12KM.
Role and Responsibilities:-
Project- Railway over bridge approaches, with pile foundation, & diaphragm wall
Project:- Pre-stress Cast in situ Box Girder Bridges over river single span Chopal Shimla Himachal.
Project : Cast in situ balnace Cantilever bridge Sutluj river ,tatapani Shimla.
Role and Responsibilities:-