I am 16+ years of experienced Diploma Electrical Engineer looking for an opportunity, to be a part of a highly motivated team and achieve a challenging position in the electrical Field. To utilize my knowledge and experience in the field of Installation, Testing, and commissioning where I can contribute to the organization’s success with my sincere efforts at the same time, I would like to expand my knowledge base and people skills in a highly professional team environment.
Test Kit Handling:
Overseas Experience:
Through Voltech Engineer Pvt Ltd (SCHNEIDER ELECTRIC)- As a Sr.Testing & Commissioning Engineer.
Involved in 4.16kv & Retrofit job (Punch point clearing) and Testing & Commisioning of 4.16KV & 480V SWGR panel testing with ATS logic including Esergy P3 & LTMR protection relay, in Petro Rabigh Phase-II upgrade project at Rabigh. through Schneider, SAUDI ARABIA.(10-Sep-2021 to till date).
Through Voltech Engineer Pvt Ltd (GE)- As a Sr.Testing & Commissioning Engineer.
Involved in 380/110 KV GIS and all LCC and Protection panel modifications,preparation for interfacing cable & termination schedule for LCC and protection panel, I/O Module, DSM, Fault Recorder panel Implementation & modification for SAS system,Testing of all type auxiliary relays, Open loop and close loop testing with SAS team, Co-ordinate with testing team for Bus bar,Transformer stability activity in Pump Station Rabigh (PS-RBG) 380/110KV S/S Project through GE, SAUDI ARABIA (20-Mar-2020 to 28-Dec-2020).
Through Voltech Engineer Pvt Ltd (GE)- As a Sr.Testing & Commissioning Engineer.
Ø Involved in 132/13.8 KV GIS all LCC and Protection panel modification, preparation forinterfacing cable & termination schedule for LCC and protection panel, I/O Module,, Implementation & modification for SAS system, Testing of all type auxiliary relays, Open loop and close loop testing with SAS team, Co-ordinate with testing team for Bus bar, Transformer stability activity in Al Rawabi Project through GE, SAUDI ARABIA (1-Jul-2018 to 19-Mar-2020).
Through Voltech Engineer Pvt Ltd (SCHNEIDER ELECTRIC)- As a Sr.Testing & Commissioning Engineer.
Ø Involved in 34.5kv & 4.16kv & Retrofit job (Punch point clearing) and Testing & Commissioning of 480V LV SWGR & LV MCC panel testing with ATS logic including SEL, GE, LTMR protection relay, in Petro Rabigh Phase-I & II project at Rabigh through SCHNEIDER, SAUDI ARABIA.(10-Sep-2016 to 25-Jun-2018)
Through Voltech Engineer Pvt Ltd (ALSTOM)- As a Sr.Testing & Commissioning Engineer.
Ø Involved in 132/13.8 KV GIS all LCC and Protection panel modification, preparation for interfacing cable & termination schedule for LCC and protection panel,I/O Module, DSM, Fault Recorder panels, Implementation & modification for SAS system,Testing of all type auxiliary relays, Open loop and close loop testing with SAS team, Co-ordinate with testing team for Bus bar,Transformer stability activity in Khakidiya project at Najran & Jizan through GE,SAUDI ARABIA (1-Mar-2016 to 10-July-2016)
Through Voltech Engineer Pvt Ltd - As a Sr.Testing & Commissioning Engineer.
Involved in Testing and commissioning of 13.8kv Mcset & LV blokset panels including Sepam & ABB protection relay testing in HARAM SPEED RAILWAY project at Madina through API MERKEZI, SAUDI ARABIA .(28-Jan-2016 to 26-Feb-2016).
Through Voltech Engineer Pvt Ltd (SCHNEIDER ELECTRIC)- As a Sr.Testing & Commissioning Engineer.
Involved in 34.5kv and 4.16kv Retrofit job (Breaker replacement & Protection upgrade) and Testing & Commissioning of 4.16kv Mcset with ATS logic panels including Micom P142, P143, P243, P633 protection relay, in Petro Rabigh Phase-1 project at Rabigh through SCHNEIDER, SAUDI ARABIA.(06-Jun-2015 to 21-Dec-02015).
Through Voltech Engineer Pvt Ltd (ALSTOM)- As a Sr.Testing & Commissioning Engineer.
Involved in 380/33 KV GIS all LCC and Protection panel modification, preparation for interfacing cable & termination schedule for LCC and protection panel, I/O Module, DSM, Fault Recorder panels, Implementation & modification for SAS system, Testing of all type auxiliary relays, Open loop and close loop testing with SAS team, Co-ordinate with testing team for Bus bar, Transformer and TEE stability activity in PP12 project at Dhurma through ALSTOM, SAUDI ARABIA (12-Aug-2015 to 30-April-2015).
Through Voltech Engineer Pvt Ltd (SCHNEIDER)- As a Sr.Testing & Commissioning Engineer.
Involved in Testing and commissioning of 33/13.8/4.16 KV Switchgear panels including Micom and Vamp protection relay, in the Maaden Refinery project at Raz al Khair through SCHNEIDER, SAUDI ARABIA.
Involved in Testing and commissioning of 13.8 & 4.16 KV Switchgear panels including Micom protection relay testing in Jubail Industrial College at JubailthroughSCHNEIDER, SAUDI ARABIA.
Through Voltech Engineer Pvt Ltd (Larsen & Toubro Ltd) - As a Sr.Testing & Commissioning Engineer.
Involved in Testing and commissioning of 0.480KV Switchgear panels including Mcomp Motor protection relay testing in the Maaden Aluminium Smelter project at Raz al Khair through L&T, SAUDI ARABIA.
Through Voltech Engineer Pvt Ltd (Lanka Transformer Ltd) - As a Sr.Testing & Commissioning Engineer.
Involved in Testing and commissioning of 132/33KV Grid Substation at Ukuvela, for CEYLON ELECTRICITY BOARD through LANKA TRANSFORMER LTD, SRI LANKA.
Involved in Testing & Commissioning of 132/33KV Grid Substation at VALACHCHENAI, for CEYLON ELECTRICITY BOARD through LANKA TRANSFORMER LTD, SRI LANKA.
Through Voltech Engineer Pvt Ltd (ABB) - As a Sr.Testing & Commissioning Engineer.
Involved in Testing & Commissioning of Wasit Gas Plant 380/230kV Substation at JUBAIL, for SEC-COA through ABB, SAUDI ARABIA.
Through Voltech Engineer Pvt Ltd (SCHNEIDER) - As a Sr.Testing and commissioning Engineer
Testing of 13.8 KV (MCSET) switchgear panels, SEPAM relays, 13.8KV/380V Transformers(2MVA), at MOBILY BUILDING in RIYATH-SAUDI ARABIA.
Testing of 13.8 KV( MCSET) switchgear panels, SEPAM relays, LV block set panels, 13.8KV/380V Transformers(2MVA), RMU(RM6) and Implementation & modification of SCADA at KING SAUDI UNIVERSITY in RIYATH-SAUDI ARABIA.
Through Voltech Engineer Pvt Ltd (AREVA) - As a Sr.Testing and commissioning Engineer
Involved in Testing and commissioning of 400/220/132/11 kV Substation at Umm Birkasuper, comprised in Qatar power system expansion-Phase VIII Substations project for KAHRAMAA through AREVA, Qatar.
Involved in Testing and commissioning of 66/11 kV Substation at Musherib-2, comprised of Qatar power system expansion-Phase VIII Substations project for KAHRAMAA through AREVA, Qatar.
Involved in Testing and commissioning of 400/220/66/11 kV Substation at Umm Al Amadsuper, comprising of Qatar power system expansion-Phase VIII Substations project for KAHRAMAA through AREVA, Qatar.