Results driven and dedicated HSE officer with 5 year plus experience in Underground Cabling, Electrical and Construction projects.
As an Approved Safety Officer from SEC (110kV Substations ) I have successfully led risk assessment management, electrical and high-voltage operations safety, emergency preparedness, incident investigation, fire safety management and HSSE compliance programs across construction and maintenance industries. These initiatives have delivered measurable reductions in incidents and strengthened a proactive safety culture leading to zero loss time injury across all projects.
Project: REPLACEMENT AND REROUTING OF 110 KV UNDERGROUND CABLE CIRCUITS SEASIDE SUBSTATION-KHALIDIYAH BSP JEDDAH
Key roles and Responsibilities:
• Prepared, reviewed and enforced Risk Assessment (RA), Job Safety Analysis (JSA), and Method Statement risk controls for trench excavation, duct installation, cable pulling, jointing, termination, testing, and reinstatement works.
• Conducted daily HSE inspections to monitor high-risk electrical and civil activities including deep excavation and lifting operations.
• Enforced Permit-to-Work (PTW), LOTO, earthing, and isolation procedures prior to commencement of HV works.
• Maintained and controlled HSE documentation, including PTW records, inspection checklists, non-conformance reports, near-miss logs and corrective action registers.
• Prepared and submitted HSE performance reports, safety statistics, and compliance documentation to SEC PDC consultants.
• Conducted incident and near-miss investigations using root cause analysis techniques and implemented corrective and preventive actions.
• Coordinated emergency response planning, mock drills, and readiness for electrical shock, arc flash, fire, and evacuation scenarios.
Project: INSTALLATION OF NEW 110KV UGC/13.8KV Hamdaniyah Substation Jeddah
Key roles and Responsibilities:
• Ensured full implementation of SEC HSE standards and construction safety requirements.
• Developed and executed Risk Assessments and JSAs for trenching, cable laying, joint bays, backfilling, and reinstatement.
• Conducted continuous site HSE inspection for excavation safety, shoring systems, access/egress control, and interface with existing utilities.
• Enforced PTW, isolation, earthing, and grounding procedures for HV cable installation and testing activities.
• Delivered technical HSE inductions and toolbox talks focused on HV electrical hazards, confined spaces, manual handling, and heavy equipment operations.
• Coordinated closure of Site Observation Reports (SOR) within timelines.
• Maintained zero Loss Time Injury (LTI) record throughout project execution.
Nebosh IGC UK
IOSH Managing Safely
OSHA 30-Hour Construction
IELTS 7.0