

CAREER OBJECTIVE:
To evolve into a hardworking and sincere profession, contributing to the success of your organisation and at the same time enhance my knowledge and develop my communication, managerial and interpersonal skills.
WORK HISTORY:- A highly talented, professional and dedicated Instrument Supervisor with 7+ year’s excellent & successful experiences in Instrument Infrastructure Project, Power plant, Oil & Gas Project, Petrochemical. Design of and detailing of instrument Material Specifications, valve specifications, material requisitions, vendor drawing reviews, pressure, specialty items.
JOB RESPONSIBILITIES:
Ø Experience in instrument installation like PG, TG, PSH, TC, RTD, TIT, FT, LT,LG, PT & PDT.
Ø Continuity checking from field to junction box & J B to control room.
Ø Rectification of the trouble & troubleshooting according to the punch created by the client.
Ø Leak testing of process and pneumatic tubing, continuity and megger test of primary and secondary cable.
Ø cable tray installation, JB& JB frame installation.
Ø Having better knowledge to read and understand P&ID & ILD, hook-up diagrams
Ø Better knowledge to do instrument nut bolt tightening(Bolt torquing).
Ø Can carry out any job independently for under supervisor by engineer & can also handle a workforce for routine and major shutdown jobs.
Ø Prepared and closed pre-commissioning and commissioning punch lists
Ø Coordinated energisation, trial run, and system handover with client and QA/QC..
Ø Coordinated with QA/QC, client, consultant, and other disciplines to resolve site issues.
Ø Logic and interlock checking and correction with control system engineer.
Ø Performing critical and closed loops with client.
Ø Carried out SAT for Control Panels and PLC panels with respective vendor.
Ø Loop Punches closing.
Ø Performing Commissioning of all Instrument transmitters and analysers.
Ø Involved in the cable tray installation and cable pulling and cable termination and loop check.
Ø Responsible for all field Instrument Installation, Inspection and Commissioning.
Ø Installation of all Control cabinet.
Ø Installation of rack and card in the control cabinet.
Ø Cable Pulling, Glanding and Termination.
Ø Installation of all type of analysers
Ø Making work permit from PTW department.
Ø Configuration and card installation of PLC.
DEVELOP OF DOCUMENT ANALYSIS:-
Ø Preparation of progress reports
Ø Develop of job safety analysis
Ø Organise, Monitor and coordinate job at site.
Ø Development, Implementation, Enforcement & Administration in Accordance to the Project also Conducting weekly toolbox meeting for foreman.
Ø Conduct weekly progress meeting with Foreman at site.
Ø Highlight wrong practices being followed which are not required for project
Ø Monitor all site activities to ensure that all work procedures are under complied.
Ø Planning and managing periodic inspections and maintenance schedule should be according to client specifications to all work sites.
Ø Develop and review all procedures as per the operational/project plan.
Ø Providing all issues related to the project management team.
Ø Daily meeting with supervisors and subcontractors
Ø Reported daily to I&C manager about work conditions.
MAIN ROLE:-
Ø Installation & Maintenance of instruments.
Ø Cable tray installation.
Ø Instrument Stanchion installation.
Ø Junction box installation.
Ø Punch work.
NOTE-WPR ARAMCO QUALIFIED Results-driven Instrument Supervisor specialising in project execution and team management. Ensured compliance with safety standards while optimising performance across multiple high-profile projects. Committed to fostering collaboration and enhancing operational efficiency.
I hereby declare that the above mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above mentioned particulars.,
SADARE ALAM, Motihari
PERSONAL PROFILE:
Name : SADAREALAM
Date Of Birth : 04/01/1992
Sex : MALE
Nationality : INDIAN
Passport No : T9015707
IQAMA NO : 2574979916
Location : JAFURAH (SAUDI ARBIA)