Assistant maintenance manager
REDSEA GLOBAL-AMAALA TRIPLE BAY-FAJR CONSTRUCTION
, Tabuk Region
02.2023 - Current
Proficient in executing commissioning and testing procedures for generators, synchronization panels, and ATS panels to ensure peak performance.
Improved equipment efficiency by implementing preventative maintenance procedures.
Performed routine checks to ensure optimal machine performance.
Advised on equipment upgrade for improved productivity.
Scheduled regular machine servicing to ensure uninterrupted function.
Handled emergency breakdowns, minimized downtime.
Monitored maintenance priorities and allocated labor resources to meet expected demands.
Supervised maintenance team and reviewed completed work to evaluate performance.
Demonstrated ability to execute troubleshooting strategies effectively, minimizing downtime and ensuring seamless operations.
Detail-oriented approach to executing comprehensive operation and maintenance reports.
Experienced in the management of 250 generators: capacity ranging from 20 KVA to 2000 KVA of Brand CAT, CUMMINS, and PERKINS.
Skilled in the execution of underground cabling as well as installation and maintenance of Low Voltage MDB (Main Distribution Board) and SMDB (Sub Main Distribution Board), ATS (Automatic Transfer Switch), and synchronization panels.
Electrical site engineer
SAUDI BINLADIN GROUP
Makkah, Mecca Region
02.2021 - 11.2023
Preparation of weekly & monthly work progress report.
To give reports to construction Manager at the end of each month.
Site surveillance to check the construction work and giving comments, if necessary to maintain the quality and accuracy.
Able to read single line diagram, technical drawings & design specification.
Review Drawings and take out quantity of material as required.
Making BOQ & prepare as built drawings. • Daily interaction with site team and procurement department for inspection of each material delivered at site with reference to approve materials.
Daily job assignment to Foreman, supervisor/Technician/Assistant and workers to observe job activities
• To make sure availability of all
Conducted thorough safety risk assessments for minimised workplace hazards.
PLANT ENGINEER
Saudi Electricity-SAUDI QESSMA GROUP
ARAR
11.2021 - 01.2023
Preparation of daily, weekly & monthly operation & maintenance report.
Excellent knowledge of diesel-powered electric generating Plant operations, maintenance requirements.
Ability to collaborate and coordinate with maintenance supervisor & technicians.
Prepared equipment malfunction reports, made inspections and from observation, determined whether equipment was operating properly.
Preventive maintenance of Transformers, RMU, Mo tors, UPS & Batteries, Inspection of control & relay panel, preparation of test Report and cable schedule.
Carry out planned and preventive maintenance testing on MV/LV electrical systems such as switchgears, motors, control panels & LV Power distribution networks.
RMU Operations and isolations, MDB testing, operation & maintenance, UPS battery banks charging and discharging testing.
Daily job assignment to Foreman, supervisor/Technician/Assistant and workers to observe job activities
Maintained accurate and up-to-date records of equipment maintenance activities and repairs.
Minimized plant breakdowns with rigorous Planned Preventative Maintenance (PPM).
Responded to plant breakdowns and emergency callouts.
Electrical site engineer
NCC ltd
Sambhal, Uttar Pradesh
06.2018 - 12.2019
Skilled in Distribution lines, 11KV Feeder, Distribution Transformers, 33/11KV Sub-Station Erection & commissioning.
Erection of New 33KV & 11KV OH Lines (OH lines for New DTR, Link Lines &HVDS DTR).
Worked with HT XLPE Cable of size 3C x 120sqmm, 3C x 300sqmm, 3C x 400sqmm, 3C x 240sqmm & LT XLPE Cable of various sizes up to 300Sqmm.
New installation of DTR of various ratings 25KVA, 63KVA, 100KVA, 200KVA.
Erection of 33/11 KV outdoor PSS with control & protection equipment
Survey, Erection and Commissioning of 33 KV Line & 11 KV Lines.
Electrical site engineer
Pace Power System Hydrabad
Lucknow, Utar Pradesh
06.2017 - 06.2018
Erection of 33/11 KV outdoor PSS with control & protection equipment
Experience with the erection of HT and LT XLPE U/G Cable.
Worked with HT XLPE Cable of size 3C x 120sqmm, 3C x 300sqmm, 3C x 400sqmm, 3C x 240sqmm & LT XLPE Cable of various sizes up to 300Sqmm.
New installation of DTR of various ratings 25KVA, 63KVA, 100KVA, 200KVA.
Responsible for execution and Quality Control.
Survey, Erection and Commissioning of 33 KV Line & 11 KV Lines.
Education
Bachelor of Engineering - Electrical & Electronics Engineering
All Saint’s College of Technology
India
05.2013 - 05.2017
Skills
Oracle Aconex
Auto Cad
Microsoft Office
Etap
CAT ET
CAT Visual Link (CMMS)
Languages
English
Fluent
Arabic
Intermediate
Hindi
Native
Accomplishments
RSG APPROVED
Timeline
Assistant maintenance manager
REDSEA GLOBAL-AMAALA TRIPLE BAY-FAJR CONSTRUCTION
02.2023 - Current
PLANT ENGINEER
Saudi Electricity-SAUDI QESSMA GROUP
11.2021 - 01.2023
Electrical site engineer
SAUDI BINLADIN GROUP
02.2021 - 11.2023
Electrical site engineer
NCC ltd
06.2018 - 12.2019
Electrical site engineer
Pace Power System Hydrabad
06.2017 - 06.2018
Bachelor of Engineering - Electrical & Electronics Engineering