Summary
Overview
Work History
Education
Skills
sections.external_links.name
Custom
Languages
Affiliations
Accomplishments
Certification
Timeline
Generic
A.H. MOHAMED HALITH

A.H. MOHAMED HALITH

kadayanallur,India

Summary

14.8 Years Experience in plant workshop & Plant Maintenance, Project work (Mobilization and Demobilization of plants) & Production for the crusher plants and batching plants

Detail-oriented professional with expertise in maintenance management, operational efficiency, and inventory management. Basic in ERP systems & Oracle systems, technical equipment operation, and equipment maintenance oversight, ensuring seamless operations and optimised performance. Skilled in employee training, team motivation, and performance evaluation to drive productivity and foster a collaborative work environment. Adept at problem analysis and report-writing to support data-driven decision-making. Committed to leveraging technical proficiency and communication skills to enhance organisational success.

Overview

15
15
years of professional experience
2010
2010
years of post-secondary education
1
1
Certification

Work History

Supervisor Plant workshop for the Major repair central workshop & maintenance workshop

AL-AYUNI INVESTMENT AND CONTRACTING CO.
Tabuk, Tabuk Region
01.2019 - Current
  • Workshop supervisor -In charge for the Plant workshop & Maintenance works of intended for the crusher plants and batching plants
  • Participate and find solutions for all production site major installation repair work (electrical repair & troubleshooting) and mechanical repair & troubleshooting work
  • Additionally handled the (mobilization and demobilization) dismantling and assembling works for the asphalt plant and concrete plant, crusher plants
  • Maintain optimal operating conditions for the entire plant; manage the operation, maintenance and capital budgets
  • Most important overhaul, repairs, preventive and planned maintenance of the plant
  • Implemented the preventive maintenance program for the crushers and asphalt plants
  • Conducted the shutdown maintenance for crusher plants, asphalt plants
  • Plan, Organize and supervise day-to-day production activities and maintenance activities of crusher plant, asphalt plant, plant workshop, quarry and heavy equipment’s
  • Conducted the erection of sand washing machine and designed the water Recycling system for the same plant to control the capital cost
  • Manpower, Materials planning & Control Reduction in inventory with Effective commercial skills
  • Modification for standardization of spares and scheduled maintenance
  • Keep up the Plant availability and reliability 95%
  • Implemented to maintain the record of every spare part as well as life time
  • Reduced break downs and achieved good production with minimum manpower
  • Involved in spare parts purchasing, consumables planning
  • Generate daily, monthly maintenance report
  • Organizing and arranging the spare parts for required sites
  • Participate in inventory work for spare parts and equipment, production plant assets

Workshop superintendent for the Major repair central workshop & maintenance workshop

AL-AYUNI INVESTMENT AND CONTRACTING CO. (DARALTA’ADEEN COMPANY - Ayuni group)
Muhayil
02.2016 - 12.2018
  • Maintained high team morale with supportive leadership techniques.
  • Encouraged open lines of communication, fostering a collaborative work environment.
  • Achieved smooth operations by implementing strict safety protocols.
  • Facilitated contractor meetings to ensure project alignment.

Senior Maintenance Engineer for the crushing & batching plant

AL-AYUNI INVESTMENT AND CONTRACTING CO. (DARALTA’ADEEN COMPANY - Ayuni group)
Muhayil
01.2014 - 01.2016
  • Provided expert advice during crucial decision-making processes concerning machinery investments.
  • Suggested improvements to equipment, enhancing operational performance.
  • Developed comprehensive fault reports after every repair task, contributing to improved troubleshooting procedures.
  • Kept abreast with latest industry trends and technologies, staying ahead in the competitive market.

Plant engineer for the crushing & batching plant

AL-AYUNI INVESTMENT AND CONTRACTING CO.
Bisha, 'Asir Region
01.2010 - 01.2013
  • Performed troubleshooting to identify and rectify mechanical faults.
  • Constantly updated professional knowledge through attending relevant engineering seminars.
  • Played a key role in the development of health and safety protocols.
  • Developed technical reports, providing valuable insights into operational issues.
  • Maintained excellent relationships with suppliers, ensuring timely delivery of materials.
  • Created detailed project plans for major overhauls, maintaining timelines.
  • Dealt with emergency breakdowns swiftly, reducing production interruptions.
  • Conducted routine inspections for improved safety standards.
  • Enhanced team performance through organising regular training sessions.
  • Improved plant productivity with preventive maintenance schedules.
  • Achieved optimal operation with regular equipment calibration.
  • Enhanced plant efficiency by implementing new maintenance procedures.
  • Planned and executed plant shutdowns, minimising impact on production timelines.
  • Optimised equipment performance through routine inspections and adjustments.

Production Engineer

Abirami Precision Works
Chennai, India
11.2009 - 07.2010
  • Managed project timelines, delivered on schedule commitments.
  • Implemented automation tools for increased operational speed.
  • Oversaw equipment calibration and maintenance tasks leading to enhanced machinery lifespan.
  • Optimised resource utilisation for waste reduction.
  • Developed standard operating procedures for consistent output quality.
  • Ensured safety standards for improved work environment.
  • Monitored production metrics, identified areas of improvement.
  • Coordinated with design team, achieved optimal product specifications.
  • Reduced machine downtime with regular preventive maintenance.
  • Resolved technical issues to ensure uninterrupted production flow.
  • Planned staff and materials costs to meet production schedules.
  • Completed site documentation before and after work tasks.
  • Wrote Standard Operating Procedures and product specifications.

Education

Bachelor of Engineering - Mechanical Engineer

Mohamed Sathak Engineering college
Tamil Nadu - india
01.2006 - 11.2009

Diploma in Mechanical Engineering - Mechanical Engineer

LathaMadhavan polytechnic college
Tamil nadu - india
01.2003 - 01.2006

S.S.L.C -

D.S. Hr. Sec. School
Tamil Nadu - India

Skills

  • Communication
  • Computer skills
  • Driving skill
  • Knowledge of erp systems
  • Technical equipment operation
  • Technical proficiency
  • Employee training
  • Performance evaluation
  • Supply chain management
  • Operational efficiency
  • Problem analysis
  • Team motivation
  • Equipment maintenance oversight
  • Equipment Maintenance
  • Inventory management
  • Report-writing

Custom

Ductile fracture on Sheet Metal., Austenite Stainless Steel, 09/2009 Automatic Hand Wash System., (Without Electric Power), 08/2008 Electrical Motorcycle, 06/2006

Languages

English
Fluent
Tamil
Native
Arabic
Upper intermediate
Malayalam
Upper intermediate (B2)

Affiliations

  • watching movies
  • interest in sports & picnic

Accomplishments

    Projects done

    · Ductile fracture on Sheet Metal. (Austenite Stainless Steel) in 2009.

    · Automatic Hand Wash System. (Without Electric Power) in 2008.

    · Electrical Motorcycle in 2006.

Certification

Training Undergone

· In-Plant Training in Choice Hyundai Authorization Service center in Chennai.

Timeline

Supervisor Plant workshop for the Major repair central workshop & maintenance workshop

AL-AYUNI INVESTMENT AND CONTRACTING CO.
01.2019 - Current

Workshop superintendent for the Major repair central workshop & maintenance workshop

AL-AYUNI INVESTMENT AND CONTRACTING CO. (DARALTA’ADEEN COMPANY - Ayuni group)
02.2016 - 12.2018

Senior Maintenance Engineer for the crushing & batching plant

AL-AYUNI INVESTMENT AND CONTRACTING CO. (DARALTA’ADEEN COMPANY - Ayuni group)
01.2014 - 01.2016

Plant engineer for the crushing & batching plant

AL-AYUNI INVESTMENT AND CONTRACTING CO.
01.2010 - 01.2013

Production Engineer

Abirami Precision Works
11.2009 - 07.2010

Bachelor of Engineering - Mechanical Engineer

Mohamed Sathak Engineering college
01.2006 - 11.2009

Diploma in Mechanical Engineering - Mechanical Engineer

LathaMadhavan polytechnic college
01.2003 - 01.2006

S.S.L.C -

D.S. Hr. Sec. School
A.H. MOHAMED HALITH