Senior Planning Engineer with +5 years of experience in construction project management, especially planning and scheduling, and proficiency with Primavera P6, MS Project, MS Office, Power BI, delay analysis, and reporting systems, in addition to reliable, enthusiastic, highly motivated, and excellent communication and presentation skills; moreover, diversified experience in mega projects such as infrastructure, energy, water, substations, residential, commercial, hospitality, and bridge projects.
Project: Ummahat al Shaykh Island Hotel 11 - St Regis (+500 million SAR)
Client: The Red Sea Global - RSG
Consultant: ATKINS
Main Contractor: Al Majal Al Arabi Group - MAG in JV with MAN Enterprise
Scope of Work:
Supply and Install Wooden Structures for Dune Villas, Coral Villas, and the Front of House Buildings Including aluminum, glass, louvers, rendering, cement board, subflooring, insulation, and cladding.
Supply and Install MEP Infrastructure Networks, MEP Works Inside Assets, and Main outdoor Equipment Including mechanical systems such as firefighting, HVAC, chilled water, hot water, drainage, irrigation, and vacuum systems.
As well as electrical systems such as MV, LV, lighting, grounding, fire alarms, and low-current systems.
Achievements:
Job description:
Energy Projects: Bahr El Baqar Substation 66/22 KV and OHTL, and New Capital Substations SS2 & SS3 Extension for Monorail
Water Projects: Abo Redis Desalination Plant, Dabaa Axis Water Pipeline, and North Sinai Pump Stations no. 08
Infrastructure Projects:- New Capital R1, R2, and R6
Total value: +500 million USD
Achievements:
Job description:
Project: Marassi North Coast (+100 million USD)
Client: EMAAR, Turner
Scope of Work: 22 plots in Zone Marina R1 (Fully Finished), Hardscape, and Landscape.
Job description:
Project: Rod El-Farag Axis bridges (+1 Billion USD)
Client: Egyptian Armed Forces
Scope of Work: Execution of Cable Stayed Bridge and Box section or Pre-cast branches
Job description: