I am an experienced Electrical Engineer specializing in the design, supervision, and execution of electrical distribution systems, including lighting, power, light current, and infrastructure systems, with expertise in Medium Voltage and Low Voltage networks, I manage projects from shop drawings to installation, testing, and commissioning, ensuring compliance with IEC and SEC standards.
• Managed Electrical Distribution systems for Medium Voltage distribution networks 13.8 KV according to IEC, and SEC standards.
• Managed excavation and laying Medium Voltage underground cables 3X500 AL/XLPE/SWA/PVC, 3X300 CU/XLPE/SWA/PVC and making VLF & Megger testing before energizing.
• Managed excavation and laying Low Voltage Aluminum cables 4X300 mm2, 4X185 mm2, 4X70 mm2 and making Megger testing before energizing.
• Managed Installation, testing and commissioning of RMUs, smart RMUs, Package substations, LV Panels and Mini Pillars.
• Managed inspection for substations, mini pillars and smart meters.
• Managed any emergency works insides networks 13.8 KV.
• Our team could to finish (400) work orders at last year (2024), work order invoices equal (12) million SAR.
• Project: Unified Contract.
Client: Saudi Electrical Company.
Consultants: Saudi Consultant, Design Tech, Holly Rock.
• Installed Electrical Distribution systems for Medium Voltage distribution networks 11&22 KV according to IEC standards.
• Finished excavation and laying Medium Voltage underground cables 3X400 AL/XLPE/SWA/PVC and making VLF & Megger testing before energizing.
• Finished excavation and laying Low Voltage Aluminum cables 3X240+120 mm2, 3X120+70 mm2, 3X95+50 mm2, 4X25 mm2 and making Megger testing before energizing.
• Finished Installation, testing and commissioning of RMUs, Package substations, LV Panels and Mini Pillars.
• Coordinated between all MEP infrastructure systems for the projects.
• Finished Works for Road's lighting system.
• Projects: -
- SAKN Masr Project, our team could to finish installation (27) substations, (128) mini pillars, (207) small panels, works invoices equal (98) million EGP.
- MOSALSALT Project, our team could to finish installation (3) distributer, (69) substations and (390) mini pillars with cables laying, works invoices equal (294) million EGP.
- Hayah Karema Project, our team could to finish installation (2) distributer, (290) substations with cables laying, (400) Medium Voltage and (5000) Low Voltage Poles with wires, work invoices equal (300) million EGP.
Client: Urban Communities Authority.
Consultants: BJESKO, Engineering Consultant’s Group (ECG).
• Received design from the owner and make shop drawings to take approval from consultant office, after that give approval drawing to subcontractors to implementation these drawing at the site.
• Supervised first and second fix work for Power, Lighting and Light Current systems.
• Supervised pull wires and install accessories work for Power, Lighting and Light Current systems with testing and operation.
• Supervised to finish street lighting.
• During finishing all works above by subcontractors, after that I bring consultant engineers to receive works to take approval to can transfer works to invoices.
• Projects: -
- Jasper Wood Project.
- RB Project.
Soft Skills:
Proficiency Skills:
Organization
Teamwork
AutoCAD
Dialux
Detail-Oriented Approach
Analytical Problem Solving
Microsoft office
Etab
ARabic: Fluent
English: Upper-Intermediate